HomeMy WebLinkAbout20090229 Ver 3_More Info Letter_20120824FMA
NC®ENR
North Carolina Department of Environment and Natural Resources
Division of Water Quality
Beverly Eaves Perdue Chuck Wakild, RE Dee Freeman
Governor Director Secretary
August 24, 2012
DWQ Project # 09 -0229, Ver. 3
Dare County
CERTIFIED MAIL: RETURN RECEIPT REQUESTED
Mr. David Stowe
Heritage of Faith Family Church
P.O. Box 297
Buxton, NC 27920
Subject Property: Heritage of Faith Family Church
Pamlico Sound [030155, 30 -22, SA, HQW]
REQUEST FOR MORE INFORMATION
Dear Mr. Stowe:
On June 19, 2012, the Division of Water Quality (DWQ) received you application dated June 14,
2012, and Public Notice issued by the USACE on July 18, 2012, and received by the DWQ on
July 18, 2012, to permanently impact 0.64 acres of 404 /wetlands to construct the proposed
church building and associated parking at the site. The DWQ has determined that your
application was incomplete and /or provided inaccurate information as discussed below. The
DWQ will require additional information in order to process your application to impact protected
wetlands and/or streams on the subject property. Therefore, until we receive five copies of the
additional information requested below, we will place this project on hold as incomplete until we
receive this additional information. If we do not receive the requested information within 30
calendar days, your project will be formally returned as incomplete. Please provide the
following information so that we may continue to review your project.
Additional Information Requested:
1. Please re- submit site plans on full plan sheets at a scale of no smaller than 1 " =50' with
topographic contours shown. Please locate all proposed impervious surfaces, including proposed
gravel surfaces, on the plans. Please locate all isolated or non - isolated wetlands, streams, and
other Waters of the State as overlays on the site plan. — Per 15A NCAC 2H .0502(c)
2. , This Office notes that the proposed project will- -require a stormwater management pan. The
project is proposed to contain 28 percent impervious cover and drains to Shellfish Area (SA) and
High Quality Watershed (HQW) waters. Please contact coastal stormwater staff with the DWQ
Washington Regional Office to discuss a stormwater management plan. - — Per 15A NCAC 2H
.0506(b)(5)
bVethnds Butfei, Stow vater, Crnnpaianre and Peinu!ting Unit tV,'eBSCVeI
»0 f:9ail Service C -r,hi Raleigh f!a" i :-ar ,lei; 3 1050
Phone
Internet ht!p i,poital uderro g,web /viq 5
an Eguel Oi�po�tun��a `, 4!(nmatr:�e F,r,11r, _mul.•; -,i
Heritage of Faith Family Church
Page 2 of 2
August 24, 2012
Please provide cross section details showing the provisions for aquatic life passage. — Per 15A
NCAC 2H .0502(c)
4. Please indicate all wetland impacts including fill slopes on the site plan. — Per 15A NCAC 2H
.0502(c)
5. Please provide a qualitative indirect and cumulative impact analysis for the project. — Per 15A
NCAC 2H .0506(b)(4)
6. This Office notes that the proposed project will require a sediment and erosion control plan from
the NC Division of Land Resources — Land Quality Section.
Staff with the DWQ Washington Regional Office noted an onsite cemetery located slightly north
of the proposed project area. Has this been addressed with the NC State Historic Preservation
Office?
This letter only addresses the application review and does not authorize any impacts to wetlands,
waters or protected buffers. Please be aware that any impacts requested within your application
are not authorized (at this time) by the DWQ. Please call me (919- 807 -6360) or Ian McMillan
(919- 807 -6364) if you have any questions regarding this letter or would like to set up a meeting to
discuss this matter.
Sincerely,
Karen Higgins, Supery isor
Wetlands, Buffers, Stormwater,
Compliance and Permitting Unit
KAH/ijm
cc: Josh Pelletier, U.S. Army Corps of Engineers - Washington Regulatory Field Office
Roberto Scheller, DWQ Washington Regional Office
File Copy
Jeff Garnett, EPA, Sam Nunn Federal Center, 61 Forsyth Street SW, Atlanta, GA 30303
Filename- 090229Ver3HentageOtFaithFamilyChurch (Dare)On_Hold