HomeMy WebLinkAbout820330_POA_20200212PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
Facility Number: 82-0330 County: Sampson
Facility Name: Gainey Swine Farm
Certified Operator Name:
Chris Gainey Operator Number: 988058
1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the
lowest point on the top of the dam for lagoons without spillways; and from the current liquid level
in the lagoon to the bottom of the spillway for lagoons with spillways.
Lagoon 1 Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5
Lagoon Name/ID: 1
Spillway(Y or N): N
Level(inches): 18
2. Check all applicable items
Liquid level is within the designed structural freeboard elevations of one or more structures.
Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are
within acceptable ranges.
X Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A
30 day Plan of Action is attached. Agronomic balance is within acceptable range.
Waste is to be pumped and hauled to off site locations. Bolume and PAN content of waste
to be pumped and hauled is reflected in section III tables. Included within this plan is a list
of the proposed sites with related facility numbers, number of acres and receiving crop
information. Contact and secure approval from the DWQ prior to transfer of waste to a site
not covered in the facility's CAWMP.
Operation will be partially or fully depopulated.
*Attach a complete schedule with corresponding animal units and dates for depopulation
*if animals are to be moved to another permitted facility, provide facility number, lagoon
freeboard levels and herd population for the receiving facility
3. Earliest possible date to begin land application of waste: 2/10/20
I hereby certify that I have reviewed the information listed above and included within the
attached Plan of Action, and to the best of my knowledge and ability, the information is
accurate and correct.
d,
s
a/ ��` a fr7���
Facility Owner/Manager (prir t
1,0 4/4 - G t
Facility Owner/Managers nature)
Phone:
Date:
9/) 176 /9a;-
0,2 -42 - „Id
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1, Structure Name/Identifier (ID):
Lagoon #1
2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard
a. current liquid level according to marker
b. designed 25 yr./24 hr. storm & structural freeboard
c. line b - line a (inches in red zone) =
d. top of dike surface area according to design
(area at below structural freeboard elevation)
e, line c112 x line d x 7.48 gallons/ft3
3. Projected volume of waste liquid produced during draw down period
f. temporary storage period according to structural design
g. volume of waste produced according to structural design
h. current herd #
8000
certified herd #
18.0
19.0
inches
inches
1.0 inches
56893
ft2
35463 gallons
180
72690
9922
actual waste produced = current herd # x line g
certified herd #
i. volume of wash water according to structural design
j. excess rainfall over evaporation according to design
k, (lines h + i + j) x 7.48 x 30 days/line f=
4. Total PAN to be land applied during draw down period
I. current waste analysis dated
m. ((lines e + k)/1000) x line
12/3/19
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
days
ft3
58609 ft3
0
33240
ft3
ft3
114505 gallons
1.31
Ibs/1000 gal.
196.5 lbs. PAN
PoA (30 Day) 2/21/00
II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24
HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY
1. Structure ID:
2, Structure ID:
3. Structure ID:
4. Structure ID:
5. Structure ID:
6. Structure ID:
Lagoon #1
n. lines 1 + 2 + 3 + 4 + 5 + 6 =
line m = 196.5 lb PAN
line m = Ib PAN
line m = Ib PAN
line m = lb PAN
line m = lb PAN
line m = Ib PAN
196,5 lb PAN
III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN
DS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD.
o. tract #
p. field #
q. crop
r. acres
s. remaining IRR-2
PAN balance
(Ib/acre)
t. TOTAL PAN
BALANCE FOR
FIELD (Ibs.)
column r x s
u. application window'
12650
3
sg
2.45
50.00
122.5
Sep —March
Sep —March
Sep —March
12650
B1
sg
3.29
50.00
164.5
12650
B2
sg
1.04
50.00
52.0
1State curren crop ending application date or next crop application beginning date for available
receiving crops during 30 day draw down period.
v. Total PAN available for all fields (sum of column t)
IV. FACILITY'S PoA OVERALL PAN BALANCE
w. Total PAN to be land applied (line n from section II) =
x. Crop`s remaining PAN balance (line v from section III) =
y. Overall PAN balance (w - x)
339.0 Ib. PAN
196.5 Ib. PAN
339.0 Ib. PAN
-143 lb. PAN
Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and haul,
depopulation, herd reduction, etc, For pump & haul and herd reduction options, recalculate new PAN based on new
information, If new field s are to be included as an option for lowering lagoon level, add these fields to the PAN balance
1-- L. 1- _ . _ .1 ._ _ _ _ 1 _ .. I I. _ 11 _ _ _ . _ _ _ 11 r-1 A \ 1 1. _ 1 _ . _ _ _ IC _ . _ !-- _ _ 1 ... _ _ i ! 4 1_ _ 1_ _ _ . 1 _ _ 1 _ _ . _ .. l I. _ .. ._ _ .`__ 'i _ .1 f _ _ : [:1. _ _ .: _I
PoA (30 Day) 2121/00
table and recalculate the overall FAN balance. It animal waste is to be hauled to another permitted tacility, provide
information regarding the herd population and lagoon freeboard levels at the receiving facility.
NARRATIVE:
Irrigation onto existing spray fields will continue as weather and field conditions permit.
PoA (30 Day) 2121 /00