Loading...
HomeMy WebLinkAbout090138_POA_20200102PLAN OF ACTION (PoA) FOR H GH FREEBOARD AT ANIMAL FACILITIES Facility Number: Facility Name: Certified Operator Name: - 13 `)RY-rii b i County: N ade 17.) Operator 1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the lowest point on the top of the dam for lagoons without spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Lagoon Nameildentifier (1D): Spillway (Yes or No): Level (inches): 2. Check all applicable items Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydrauiic and agronomic balances are within acceptable ranges. Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste to pumped and hauled is reflected in section 11 tables. Included within this plan is a list of the proposed sites with related facility number(s), number acres and receiving crop information. Contact and secure approval from the Division of Water Resources prior to transfer of waste to a site not covered in the facility's certified animal waste management plan. Operation will be partially or fully depopulated. - attach a complete schedule with corresponding animal units and dates for depopulation if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3. Earliest possible date to begin land application of waste: hereby certify that have reviewed the information listed above and included within the attached Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct. arn,:6 kL0:5 Facility 'Own riManager (print) 4 // ,// / -2__ - ,' ., - /,- / 'I ' ' ` •,-/-,A,----;/ „, ---/7 L (- .C,---- 7 Facility OwnerIMnager (signature) PoA Cover Page 2/21/00 Phone: '110 6 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY Ill. TOTAL POUNDS QpPAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25yRJ24 1. Structure ID: 2. Structure |O� 3. Structure |D: 4. Structure |O: 5. Structure |D� G� Structure |D: Marlowe Finisher n.lines 1+2+3+4+G+6= line m= 1153.0UnPAN line m= lb PAN line m= lb PAN line m= |b PAN line m= lb PAN line m= lb PAN 11518 |b PAN Ill. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30DAY DRAW DOWN PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD. otrao # � � p,field # q.orop 'cacres s. remanmomR oPAN balance (lb/acre) t.TOTAL PAN BALANCE FOR F|sLo(Ilus.) column rxw u.application window' 2.8 1 overseedgrozed 2�58 55.00 141.9 Sept -April Z 2_overaeedgrazed 3,08 55,00 1S8.48ep�Aph| 183.8 Sept -April 4.1 3 overseedgrazed 2,98 55.00 1 4 ovenseedgrezed 3.55 55,UO 195.3 183.7'3ept-Aph| Sep�Aph| 4.1 5oveneeedgrazed 3.34 55,00 1 8 overaeedgrazed 3.10 55�00 170-5 Sept -April 1 7 overmaedgrazed 3.55 55.00 185,3 Sept -April State current crop ending application date or next crop application beginning date for available receiving crops during 30 day draw down period, v.Total PAN available for all fields (sum ofcolumn t)IV. FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied (line nfrom section U)= x. Crop's remaining PAN bm|mnom (fine vfn»rn section U|) = y. Overall PAN balance (w/-x)= 1219.9 lb. PAN 1153�8 lb. PAN 121Q.Qlb. PAN Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and hou|, depopu|aUon, herd reduction. etc. For pump & haul and herd reduction opt|ona, recalculate new PAN based on new information. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance- If animal waste in to be hauled to another permitted faoi|ity, provide information regarding the herd population and lagoon freeboard levels at the Will pump as soon as conditions allow, PLAN OFACTION (PoA)FOR HIGH FREEBOARD AT ANIMAL FACILITIES 3ODAY DRAW DOWN PERIOD |. TOTAL PAN TO BELAND APPLIED PER WASTE STRUCTURE 1. Structure Name/identifier (ID): Marlowe Finisher 2. Current liquid volume in25yc/24 hc storm storage Qstructural freeboard a. current liquid level according tomarker b. designed 25yr,/24hr.storm & structural freeboard C. line line e(inches inred zone) = d, top ofdike surface area according todesign (area at below structural freeboard elevation) e. 3. Projected volume oYwaste liquid produced during draw down period [tempoery storage period according to structural design g. volume of waste produced according to structural design h. current herd # 6200 certified herd # actual waste produced = current herd # x line = certified herd # i volume of wash water according to structural design ] excess rainfall over evaporation according bodesign h. (lines h+|+})x7.48x 30 daya/|inef= 4 Total PAN tobeland applied during draw down period i current waste analysis dated @/17/2O1S REPEAT SECTION | FOR EACH WASTE STRUCTURE ONSITE. (Click on the next Structure tab shown below) 1&O 3.0 inches 148216 ft2 277164 gallons 180 214151 ft f� ft 3 367431 gallons 1.79 |bu/1000goi PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES Facility Number: CI 4- County: Made'? Facility Name: 4 Far ins-- 4 Certified Operator Name: '4, Operator # 1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the lowest point on the top of the darn for lagoons without spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Lagoon Name/Identifier (ID): Spillway (Yes or No): Level (inches): 2. Check ail applicable items Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste to pumped and hauled is reflected in section Ill tables. included within this plan is a list of the proposed sites with related facility number(s), number acres and receiving crop information. Contact and secure approval from the Division of Water Resources prior to transfer of waste to a site not covered in the facility's certified animal waste management plan. Operation will be partially or fully depopulated. - attach a complete schedule with corresponding animal units and dates for depopulation - if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3. Earliest possible date to begin land application of waste: I hereby certify that I have reviewed the information listed above and included within the attached Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct, (70-- Fac ity Owner/Manager print ,-/ / Facility Owner/Manager (siqne.tu PoA Cover Page 2/21/00 Cr Phone: tYi - 3 Date: o II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR.124 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: 2. Structure ID: 3. Structure ID: 4. Structure ID: 5. Structure ID: 6. Structure ID: Billup Finishing n. lines 1 + 2 + 3 + 4 + 5 + 6 = line m = 158.1 lb PAN line m = lb PAN line rn = lb PAN line m = lb PAN line m = Ib PAN line m = Ib PAN 158.1 Ib PAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD. o. tract # p. field # q. crop r. acres s. remaining IRR.t. 2 PAN balance (lb/acre) TOTAL PAN BALANCE FOR FIELD (lbs.) column r x s u_ application window' , 1566 2 overseed 9.00 50.00 450.0Sept-April 1566 3 overseed 3.00 50.00 150.0 Sept -April 1565 2 overseed 1.70 50.00 85.0 Sept -April PAN balance is an estimate 'State current crop ending application date or next crop application beginning date for available receiving crops during 30 day draw down period. v. Total PAN available for all fields (sum of column t) = IV. FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied (line n from section II) _ x. Crops remaining PAN balance (line v from section Ill) = y. Overall PAN balance (w 4 x) _ 685.0 Ib. PAN 158.1 Ib. PAN 685.0 lb. PAN -527 lb. PAN Line y must show as a deficit. If line y does not show as a deficit. list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new information. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the receiving facility. NARRATIVE: will begin pumping as soon as field conditions allow. PoA (30 Day) 2/21/00 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): Billup Finishing 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker b. designed 25 yr./24 hr. storm & structural freeboard c. line b - line a (inches in red zone) d. top of dike surface area according to design (area at below structural freeboard elevation) e, line c/12 x line d x 7.48 gallons/ft3 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design g. volume of waste produced according to structural design h. current herd # 1600 certified herd # 18.0 19.0 inches inches 1.0 inches 47280 ft2 29471 gallons 180 52748 7 1600 actual waste produced = current herd # x line g = certified herd # volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h j) x 7.48 x 30 days/line f= 4 Total PAN to be land applied during draw down period 1. current waste analysis dated m. ((lines e k)/1000) x line = 9/17/2019 REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) PoA (30 Day) 2/21/00 days ft3 52749 ft3 0 27580 ft' 100143 gallons 1.22 lbs/1000 gal. 158.1 lbs. PAN