HomeMy WebLinkAbout090138_POA_20200102PLAN OF ACTION (PoA) FOR H GH FREEBOARD AT ANIMAL FACILITIES
Facility Number:
Facility Name:
Certified Operator Name:
-
13
`)RY-rii b i
County: N ade 17.)
Operator
1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the
lowest point on the top of the dam for lagoons without spillways; and from the current liquid level
in the lagoon to the bottom of the spillway for lagoons with spillways.
Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6
Lagoon Nameildentifier (1D):
Spillway (Yes or No):
Level (inches):
2. Check all applicable items
Liquid level is within the designed structural freeboard elevations of one or more structures. Five
and 30 day Plans of Action are attached. Hydrauiic and agronomic balances are within
acceptable ranges.
Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day
Plan of Action is attached. Agronomic balance is within acceptable range.
Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste to
pumped and hauled is reflected in section 11 tables. Included within this plan is a list of the
proposed sites with related facility number(s), number acres and receiving crop information.
Contact and secure approval from the Division of Water Resources prior to transfer of
waste to a site not covered in the facility's certified animal waste management plan.
Operation will be partially or fully depopulated.
- attach a complete schedule with corresponding animal units and dates for depopulation
if animals are to be moved to another permitted facility, provide facility number, lagoon
freeboard levels and herd population for the receiving facility
3. Earliest possible date to begin land application of waste:
hereby certify that have reviewed the information listed above and included within the attached Plan
of Action, and to the best of my knowledge and ability, the information is accurate and correct.
arn,:6 kL0:5
Facility 'Own riManager (print)
4
// ,//
/
-2__
- ,' ., -
/,-
/ 'I ' ' ` •,-/-,A,----;/ „, ---/7 L (- .C,----
7
Facility OwnerIMnager (signature)
PoA Cover Page 2/21/00
Phone: '110
6
HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY
Ill. TOTAL POUNDS QpPAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25yRJ24
1. Structure ID:
2. Structure |O�
3. Structure |D:
4. Structure |O:
5. Structure |D�
G� Structure |D:
Marlowe Finisher
n.lines 1+2+3+4+G+6=
line m= 1153.0UnPAN
line m= lb PAN
line m= lb PAN
line m= |b PAN
line m= lb PAN
line m= lb PAN
11518 |b PAN
Ill. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30DAY DRAW DOWN
PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD.
otrao #
�
�
p,field #
q.orop
'cacres
s. remanmomR
oPAN balance
(lb/acre)
t.TOTAL PAN
BALANCE FOR
F|sLo(Ilus.)
column rxw
u.application window'
2.8
1
overseedgrozed
2�58
55.00
141.9
Sept -April
Z
2_overaeedgrazed
3,08
55,00
1S8.48ep�Aph|
183.8
Sept -April
4.1
3
overseedgrazed
2,98
55.00
1
4
ovenseedgrezed
3.55
55,UO
195.3
183.7'3ept-Aph|
Sep�Aph|
4.1
5oveneeedgrazed
3.34
55,00
1
8
overaeedgrazed
3.10
55�00
170-5
Sept -April
1
7
overmaedgrazed
3.55
55.00
185,3
Sept -April
State current crop ending application date or next crop application beginning date for available
receiving crops during 30 day draw down period,
v.Total PAN available for all fields (sum ofcolumn t)IV. FACILITY'S PoA OVERALL PAN BALANCE
w. Total PAN to be land applied (line nfrom section U)=
x. Crop's remaining PAN bm|mnom (fine vfn»rn section U|) =
y. Overall PAN balance (w/-x)=
1219.9 lb. PAN
1153�8 lb. PAN
121Q.Qlb. PAN
Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and
hou|, depopu|aUon, herd reduction. etc. For pump & haul and herd reduction opt|ona, recalculate new PAN
based on new information. If new fields are to be included as an option for lowering lagoon level, add these
fields to the PAN balance table and recalculate the overall PAN balance- If animal waste in to be hauled to
another permitted faoi|ity, provide information regarding the herd population and lagoon freeboard levels at the
Will pump as soon as conditions allow,
PLAN OFACTION (PoA)FOR HIGH FREEBOARD AT ANIMAL FACILITIES
3ODAY DRAW DOWN PERIOD
|. TOTAL PAN TO BELAND APPLIED PER WASTE STRUCTURE
1. Structure Name/identifier (ID):
Marlowe Finisher
2. Current liquid volume in25yc/24 hc storm storage Qstructural freeboard
a. current liquid level according tomarker
b. designed 25yr,/24hr.storm & structural freeboard
C. line line e(inches inred zone) =
d, top ofdike surface area according todesign
(area at below structural freeboard elevation)
e.
3. Projected volume oYwaste liquid produced during draw down period
[tempoery storage period according to structural design
g. volume of waste produced according to structural design
h. current herd #
6200
certified herd #
actual waste produced = current herd # x line =
certified herd #
i volume of wash water according to structural design
] excess rainfall over evaporation according bodesign
h. (lines h+|+})x7.48x 30 daya/|inef=
4 Total PAN tobeland applied during draw down period
i current waste analysis dated
@/17/2O1S
REPEAT SECTION | FOR EACH WASTE STRUCTURE ONSITE.
(Click on the next Structure tab shown below)
1&O
3.0 inches
148216
ft2
277164 gallons
180
214151
ft
f�
ft 3
367431 gallons
1.79
|bu/1000goi
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
Facility Number: CI 4- County: Made'?
Facility Name: 4 Far ins--
4
Certified Operator Name: '4, Operator #
1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the
lowest point on the top of the darn for lagoons without spillways; and from the current liquid level
in the lagoon to the bottom of the spillway for lagoons with spillways.
Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6
Lagoon Name/Identifier (ID):
Spillway (Yes or No):
Level (inches):
2. Check ail applicable items
Liquid level is within the designed structural freeboard elevations of one or more structures. Five
and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within
acceptable ranges.
Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day
Plan of Action is attached. Agronomic balance is within acceptable range.
Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste to
pumped and hauled is reflected in section Ill tables. included within this plan is a list of the
proposed sites with related facility number(s), number acres and receiving crop information.
Contact and secure approval from the Division of Water Resources prior to transfer of
waste to a site not covered in the facility's certified animal waste management plan.
Operation will be partially or fully depopulated.
- attach a complete schedule with corresponding animal units and dates for depopulation
- if animals are to be moved to another permitted facility, provide facility number, lagoon
freeboard levels and herd population for the receiving facility
3. Earliest possible date to begin land application of waste:
I hereby certify that I have reviewed the information listed above and included within the attached Plan
of Action, and to the best of my knowledge and ability, the information is accurate and correct,
(70--
Fac
ity Owner/Manager print
,-/
/ Facility Owner/Manager (siqne.tu
PoA Cover Page 2/21/00
Cr
Phone: tYi - 3
Date:
o
II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR.124
HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY
1. Structure ID:
2. Structure ID:
3. Structure ID:
4. Structure ID:
5. Structure ID:
6. Structure ID:
Billup Finishing
n. lines 1 + 2 + 3 + 4 + 5 + 6 =
line m = 158.1 lb PAN
line m = lb PAN
line rn = lb PAN
line m = lb PAN
line m = Ib PAN
line m = Ib PAN
158.1 Ib PAN
III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN
PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD.
o. tract #
p. field #
q. crop
r. acres
s. remaining IRR.t.
2 PAN balance
(lb/acre)
TOTAL PAN
BALANCE FOR
FIELD (lbs.)
column r x s
u_ application window'
,
1566
2
overseed
9.00
50.00
450.0Sept-April
1566
3
overseed
3.00
50.00
150.0
Sept -April
1565
2
overseed
1.70
50.00
85.0
Sept -April
PAN balance is an estimate
'State current crop ending application date or next crop application beginning date for available
receiving crops during 30 day draw down period.
v. Total PAN available for all fields (sum of column t) =
IV. FACILITY'S PoA OVERALL PAN BALANCE
w. Total PAN to be land applied (line n from section II) _
x. Crops remaining PAN balance (line v from section Ill) =
y. Overall PAN balance (w 4 x) _
685.0 Ib. PAN
158.1 Ib. PAN
685.0 lb. PAN
-527 lb. PAN
Line y must show as a deficit. If line y does not show as a deficit. list course of action here including pump and
haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN
based on new information. If new fields are to be included as an option for lowering lagoon level, add these
fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to
another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the
receiving facility.
NARRATIVE:
will begin pumping as soon as field conditions allow.
PoA (30 Day) 2/21/00
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/Identifier (ID):
Billup Finishing
2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard
a. current liquid level according to marker
b. designed 25 yr./24 hr. storm & structural freeboard
c. line b - line a (inches in red zone)
d. top of dike surface area according to design
(area at below structural freeboard elevation)
e, line c/12 x line d x 7.48 gallons/ft3
3. Projected volume of waste liquid produced during draw down period
f. temporary storage period according to structural design
g. volume of waste produced according to structural design
h. current herd #
1600
certified herd #
18.0
19.0
inches
inches
1.0 inches
47280
ft2
29471 gallons
180
52748 7
1600
actual waste produced = current herd # x line g =
certified herd #
volume of wash water according to structural design
j. excess rainfall over evaporation according to design
k. (lines h j) x 7.48 x 30 days/line f=
4 Total PAN to be land applied during draw down period
1. current waste analysis dated
m. ((lines e k)/1000) x line =
9/17/2019
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
PoA (30 Day) 2/21/00
days
ft3
52749 ft3
0
27580
ft'
100143 gallons
1.22
lbs/1000 gal.
158.1 lbs. PAN