HomeMy WebLinkAbout20021769 Ver 2_Triage Check List_20030930__
~~
•
Triage Check List ~° a
4+ h t.
`k'~i ,1S ~ y7
t, r fP..
~~" a ~G ~,ief ~.'.
Date: ~ ~O~a~ Project Name: ~61^"'~-o~ ~,^^~.~
' ._.°' ;-;-,,. ~ County: ~-~~-
~G ~.
To: ^ ARO Mike Parker ^ WaRO Tom Steffens
FRO en Avertte ^ WiRO Noelle Lutheran
^ MRO Alan Johnson ^ WSRO Dazyl Lamb
^ RRO Steve Mitchell
From: <~~-~-~--~ Telephone : (919) ~3 3 -~ttc`~ ~
The file attached is being forwarded to your for your evaluation.
Please call if you need assistance.
^ Stream length impacted
^ Stream determination
^ Wetland determination and distance to blue-line surface waters on USFW topo maps
^ Minimization/avoidance issues
^ Buffer Rules (Neuse, Tar-Pamlico, Catawba, Randleman)
^ Pond fill
^ Mitigation Ratios
^ Ditching
^ Are the stream and or wetland mitigation sites available and viable?
^ Check drawings for accuracy
^ Is the application consistent with pre-application meetings?
^ Cumulative impact concern
Comments:
1-~,-,_-