Loading...
HomeMy WebLinkAboutNCC201309_NOT Closeout Documents_20210315North Carolina Department of Environmental Quality Land Resources: 1628 Mail Service Center, Raleigh, NC 27699 (919) 791-4200 County: Lee Project: Clarendon Valley lots 2-5, 7-14, 19,21 River basin: Cape Fear Person financially responsible: SDH Raleigh, LLC - Robert Bowman, Project #: lee-2020-027 Construction VP Address: 2520 Reliance Avenue, Apex, NC 27539 1. Project Location: Clearwater drive and Bragg st, Sanford Pictures: No 2. Weather and soil conditions: sunny, workable Initial inspection: No 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply) Degree of damage: 8. Contact made with (name): no one Title: Inspection report: Sent Report Date given/sent: March 12, 2021 9. Corrective action needed: 10. Comments: Permanent ground cover sufficient to restrain erosion has been established. No additional self inspection or monitoring is required. Project is released under the SPCA. If this project has a Certificate of Coverage (COC) under the NCGO 1 permit, then complete the electronic Notice of Intent (eNOT) form at degnc.gov/NCGOI Reported by: Diane Adams Others present: Date of inspection: March 11, 2021 Time arriving on site: 12:30 PM Time leaving site: 12:40 PM cc: