HomeMy WebLinkAbout820343_POA_20200221PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES Facility Number: 82-343 County: Sampson Facility Name: P-19A&B Certified Operator Name: Dennis E. Alphin Operator Number: 988615 1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the lowest point on the top of the dam for lagoons without spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Lagoon 1 Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5 Lagoon Name/ID: 19A 19B Spillway(Y or N): N N Level(inches): 16 14 2. Check all applicable items Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. X Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste to be pumped and hauled is reflected in section III tables. Included within this plan is a list of the proposed sites with related facility numbers, number of acres and receiving crop information. Contact and secure approval from the DWQ prior to transfer of waste to a site not covered in the facility's CAWMP. Operation will be partially or fully depopulated. *Attach a complete schedule with corresponding animal units and dates fro depopulation Rif animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3. Earliest possible date to begin land application of waste: 2/28/20 Weather permitting. I hereby certify that I have reviewed the information listed above and included within the attached Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct. Prestage Farms Inc. Phone: 910-592-5771 Facility Owner/Manager (print) --7-7-e/t( Facility Owner/Mafriager` (signature) Date: 2/21/2020 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): 19A 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker b. designed 25 yr./24 hr. storm & structural freeboard c. line b - line a (inches in red zone) = top of dike surface area according to design d. (area at below structural freeboard elevation) e. line c/12 x line d x 7.48 gallons/ft3 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design g. volume of waste produced according to structural design h. current herd # 2000 certified herd # 16.0 19.0 inches inches 3.0 inches 138976 ft2 259885 gallons 180 211997 2000 actual waste produced = current herd # x line g = certified herd # 1. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated m. ((lines e + k)/1000) x line 1 = 1 /6/2020 , REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) days ft3 211997 fti 0 84933.3 ft3 ft3 370173 gallons 1.21 762 lbs. PAN PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): 19B 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker b. designed 25 yr./24 hr. storm & structural freeboard c. line b - line a (inches in red zone) = d. top of dike surface area according to design (area at below structural freeboard elevation) e. line c112 x line d x 7.48 gallons/ft3 3. Projected volume of waste liquid produced during draw down period f, temporary storage period according to structural design g. volume of waste produced according to structural design h. current herd # 2000 certified herd # 14.0 19.0 inches inches 5.0 inches 139356 ft2 434326 gallons 180 211997 2000 actual waste produced current herd # x line g = certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated m. ((lines e + k)/1000) x line I = 1/6/20201 REPEAT SECTION 1 FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) days ft3 211997 ft3 0 84000 ft3 ft3 369010 gallons 1.27 Ibs/1000 gal. 1020.2 lbs. PAN PoA (30 Day) 2/21100 II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR/24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: 2. Structure ID: 3. Structure ID: 4_ Structure ID: 5. Structure ID: 6. Structure ID: 19A 19B n. lines + 2 + 3 + 4 + 5 + 6 = line m = 762.4 ib PAN line m = 1020.2 Ib PAN line m = Ib PAN line m = Ib PAN line m = lb PAN line m - Ib PAN 1782.6 lb PAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PE o. tract # p. field # q. crop r. acres s. remaining IRR-t. 2 PAN balance (Ib/acre) TOTAL PAN BALANCE FOR FIELD (Ibs.) column r x s u. application window' 10977 11C Small Grain 5.60 50.00 280.0 OCT-MAR 10977 11D Small Grain 3.50 50.00 175.0 OCT-MAR 10977 11E Small Grain 4.70 50.00 235.0 OCT-MAR 10977 1A Small Grain 5.00 50.00 250.0 OCT-MAR 10977 11G Small Grain 3.90 50.00 195.0 OCT-MAR 10977 4D Small Grain 4.20 50.00 210.0 OCT-MAR 10977 4B Small Grain 3.80 50.00 190.0 OCT-MAR 10977 4F Small Grain 4.20 50.00 210.0 OCT-MAR 10977 11H Small Grain 2.90 50.00 145.0 OCT-MAR . Total PAN available for all flelds (sum of column t) = IV. FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied (line n from section 11) = x. Crop's remaining PAN balance (line v from section 111) = y. Overall PAN balance (w - x) = 1890.0 Ib. PAN 1782.6 Ib. PAN 1890.0 Ib. PAN -107 Ib. PAN