HomeMy WebLinkAbout090169_POA_20210222 (2)PLAN OF :ACTION (PoA) F
'acEifi{ Number: 0 1 s Countyt
3to4n
"
G-i Iles re_ *Tr—aliffIS
Certified Operator Name: ILILAIS G lls (p °
I . Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the
lowest point on the top of the dam for lagoons without spilIw ys; and from the current liquid level
in the lagoon to the bottom of the spillway for lagoons with spillways,
Structure 1 .Structure 2 Structure 3 Structure 4 Structure 6 Structure 6
,Lgoon Name/Identifier (ID): 1
L C1
Spillway (Yes or No).
Level (inches):
FaaiUfy Name:
s
R HIGH FREEBOARD AT ANIRAL
2. Check all applicable items se y-lc Oslo n /fl7 02 / 151 al
FACIILIIT
ES
.Liquid level is within the designed structural freeboard elevations of one or more structures. Five
and SD day Plans of Action are attached. Hydraulic and agronomic balances are within
acceptable ranges.
Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day
Plan of Action is attached. Agronomic balance is within acceptable range.
Waste Is.to be pumped and hauled to off site locations. Volume and PAW content of waste to
pumped and hauled is reflected in section Ill tables. included. within this plan is a list of the
proposed sites with related facility number(s), number acres and receiving crop information.
Contact and secure approval from the Division of Water Quality prior to transfer of waste
to a site not covered in the facility's certified animal waste management plan.
Operation will be partially or fully depopulated.
- attach a complete schedule with corresponding animal units and dates for depopulation •
- If animals are to be moved to another permitted facility, provide facility number, lagoon
freeboard levels and herd population for the receiving facility
3. Earliest possible date to begin land application of waster _ _
l hereby certify.that t have reviewed the information listed above ano =ncmuaen within the attached Plan
of Action, and to the best of my knowledge and ability, the information is accurate atici correct.
2lcAr1 g/((ter)'e.
Facility ownerf&[anager (print)
Phone::910 976 -2efei 2
Date:
Facility Ownerllllianasignature) .
PoA Cover Page 2121100
line x
If unable to land apply hydraulic Toad listed in line y, list course of action here including pump
and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options,
recalculate new hydraulic load based on new information.
Plan to land apply hydraulic Toad:
1. Describe moisture conditions of fields? (e.g. Is there water standing in field; does irrigation
equipment mar down in field; "trafficability" across soils; will soils absorb application without runoff, etc.)
high moisture in fields. Irrigation will take place as soon as weather and land conditions permit.
2. Date and amount of last rainfall event?
DATE:
3. Dates of last waste application event per field:
02/15/21
AMOUNT:
2.90
inches
pumped on a few hydrants on 2/10.
4. Given optimum soil and weather conditions, is irrigation equipment capable of applying the volume in
line "n" at appropriate seasonal (i.e. winter) application rates within 5 days?
Soil is saturated. Will try to pump later this week on soil as they dry out and hopefully no rain. Some hogs
were sold last week.
5. Irrigation schedule for next 5 days - include daily schedule; proposed application rates and amounts
per irrigation event; changes made in gun sizes, nozzles, "o" rings, operating time, travel speed, etc. to
meet proposed changes in application rates and amounts; and any other information for consideration.
Irrigate as weather and land conditions permit. Will pump short times, on dryer fields later this week.
PoA (5 Day) 2/21/00