Loading...
HomeMy WebLinkAboutNCC200949_NOT Closeout Documents_20210315mr NORTH CAROLINA CITY OF WILSON iV-orth Carolina INCORPORATED 1849 27894-0010 City of Wilson Local Sedimentation and Erosion Control Program Inspection Report Today's Date: 3/15/2021 Inspector information: Michael Horan, CPESC 252-205-4247 Project Name and Tracking Number Barton College Dry Detention 20-02 Project Location: College St. Inspection Date: 3/15/2021 , Reason for Inspection: Weekly Certificate of Compliance Issued: Yes Date Issued: 3/2020 Financially Responsible Party: Mr. David A. Browning 700 Vance St. NE Wilson, NC 27893 Project Contact Information: ETHAN MCBRYDE Project Engineer M: 804.396.0830 0: 804.897.0900 x144 F: 804.897.0901 1660 Huguenot Road, Midlothian, VA 23113 1 www.EDCweb.com Check only one box, if closing out project. ® Permanent ground cover sufficient to restrain erosion has been established. No additional self - monitoring or self -inspections are required. Project is in compliance and released under the SPCA. Termination of coverage under the NPDES General Stormwater Permit for Construction Activities (NCGO1) must be requested by the permittee via a Notice of Termination (NOT). The NOT is available at: https:Hedocs.deq.nc.gov/Fonns/NCGO I -Termination. Please note that this correspondence must be uploaded as part of completing the NOT process.