Local Sedimentation and Erosion Control Program
Inspection Report
Today's Date: 3/15/2021
Inspector information: Michael Horan, CPESC 252-205-4247
Project Name and Tracking Number Barton College Dry Detention 20-02
Project Location: College St.
Inspection Date: 3/15/2021 , Reason for Inspection: Weekly
Certificate of Compliance Issued: Yes Date Issued: 3/2020
Financially Responsible Party:
Mr. David A. Browning
700 Vance St. NE
Wilson, NC 27893
Project Contact Information: ETHAN MCBRYDE
Project Engineer
M: 804.396.0830
0: 804.897.0900 x144
F: 804.897.0901
1660 Huguenot Road, Midlothian, VA 23113 1 www.EDCweb.com
Check only one box, if closing out project.
® Permanent ground cover sufficient to restrain erosion has been established. No additional self -
monitoring or self -inspections are required. Project is in compliance and released under the
SPCA. Termination of coverage under the NPDES General Stormwater Permit for Construction
Activities (NCGO1) must be requested by the permittee via a Notice of Termination (NOT). The
NOT is available at: https:Hedocs.deq.nc.gov/Fonns/NCGO I -Termination. Please note that this
correspondence must be uploaded as part of completing the NOT process.