Loading...
HomeMy WebLinkAboutNC0025071_Pretreatment Audit_20210309United States Environmental Protection Agency E PA Washington, D.C. 20460 Water Compliance Inspection Report Form Approved. OMB No. 2040-0057 Approval expires 8-31-98 Section A: National Data System Coding (i.e., PCS) Transaction 1 ICI Code NPDES yr/mo/day Inspection J 2 IS I 31 NC0025071 111 121 21/03/09 117 Type 18 fir. I I I I I Inspector Fac Type 19 G I 201 211 I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I 1 I 166 Inspection Work Days Facility Self -Monitoring Evaluation Rating B1 QA Reserved 671 17° 13 I 71172 I N I 73I I 174 1L� 1 751 180 111111 Section B: Facility Data Name and Location of Facility Inspected (For Industrial Users discharging to POTW, also include POTW name and NPDES permit Number) Mebane Bridge WWTP 204 Mebane Bridge Rd Eden NC 27288 Entry Time/Date 09:OOAM 21/03/09 Permit Effective Date 15/03/01 Exit Time/Date 02:15PM 21/03/09 Permit Expiration Date 18/04/30 Name(s) of Onsite Representative(s)/Titles(s)/Phone and Fax Number(s) /// Christopher Ray Powell/ORC/336-627-1009/ Other Facility Data Name, Address of Responsible Official/Title/Phone and Fax Number Contacted Melinda S Ward,PO Box 70 Eden NC 272890070//336-627-1009/ No Section C: Areas Evaluated During Inspection (Check only those areas evaluated) Pretreatment Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary) (See attachment summary) Name(s) and Signature(s) of Inspector(s) Agency/Office/Phone and Fax Numbers Date Alex Lowe DWR/WSRO WQ/336-776-9689/ Signature of Management Q A Reviewer Agency/Office/Phone and Fax Numbers Date FDocuSigned by: L—o, T. Still EPA Fo m 356 ev99-94) Previous editions are obsolete. Page# 1 31 NPDES yr/mo/day NC0025071 111 121 21/03/09 117 Inspection Type 18�r,� (Cont.) 1 Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary) On March 9th, 2021, Alex Lowe of the WSRO conducted a pretreatment program audit at the Mebane Bridge WWTP facility (permit no. NC0025071). Pretreatment Program Director Chris Powell was present throughout. The audit started with an inspection of Weil-McClane Technologies, a categorical SIU under the jurisdiction of the permiteted pretreatment program. Mr. Powell conducted a thorough administrative review with the SIU representatives with the division -approved inspection form, and a tour of the relevant pretreatment features was taken. Lowe observed the points of collection, all floor drains in the production area, as well as the isolation precations (three-inch dykes and spill ocntainment pallets) taken around the hazardous chemical storage/disposal area. The first is in the "paint pit" area, where washed metal pieces drip-dry before heading into the painting process. The drain is left open to the internal collection system, but can be isolated with a valve at the point of entry. The next was a floor drain into which the floor sweepers will dump a mixture of water anc sweepings after cleaning the production areas.Both floor drains were significantly removed from areas of high risk for spillage or contamination. After the tour, Lowe observed Powell collect a 24-hour composite from the SIU. Powell calibrated his meters at the site of collection, thorohgly mixed the effluent composite before pouring samples, and demonstrated proper storage temperature of collection jug as well as samples for transportation. After delivering the effluent samples to Pace Analytical, Lowe and Powell conducted the Pretreatment Paperwork Audit. All information requested was provided and supported with documentation. The audit demonstrates satisfactory maintenance of documentation and proper execution of pretreatment program elements. Page# 2 Permit: NC0025071 Inspection Date: 03/09/2021 Owner - Facility: Mebane Bridge WWTP Inspection Type: Pretreatment Audit Yes No NA NE Page# 3