HomeMy WebLinkAbout090210_POA_20210215PLAN OF ACTION (POA) FOR HIGH FREEBOARD AT
FacilityNumber: 9 - County:
.�
Facility Name:
17�vtd 600den �ini�hiy
Certified Operator Name:
David 6&akn
6l0-dtr
Operator #
1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the
lowest point on the top of the dam for lagoons without spillways; and from the current liquid level
in the lagoon to the bottom of the spillway for lagoons with spillways.
Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6
Lagoon Name/Identifier (ID):
Spillway (Yes or No):
Level (inches):
2. Check all applicable items /-- /5 -,-�2 /
Liquid level is within the designed structural freeboard elevations of one or more structures. Five
and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within
acceptable ranges.
Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day
Plan of Action is attached. Agronomic balance is within acceptable range.
Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste to
pumped and hauled is reflected in section III tables. Included within this plan is a list of the
proposed sites with related facility number(s), number acres and receiving crop information.
Contact and secure approval from the Division of Water Quality prior to transfer of waste
to a site not covered in the facility's certified animal waste management plan.
Operation will be partially or fully depopulated.
- attach a complete schedule with corresponding animal units and dates for depopulation
- if animals are to be moved to another permitted facility, provide facility number, lagoon
freeboard levels and herd population for the receiving facility
3. Earliest possible date to begin land application of waste:
I hereby certify that I have reviewed the information listed above and included within the attached Plan
of Action, and to the best of my knowledge and ability, the information is accurate and correct.
o v I' D a ( -
Facility Owner/Manager (print)
Facili
er/Manager (signature)
Phone:
Date:
PoA Cover Page 2/21/00
11. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24
HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY
1. Structure ID: David Gooden 1 line m = 389.9 lb PAN
2. Structure ID: 2 line m = 489.9 lb PAN
3. Structure ID: 3 line m = 456.2 lb PAN
4. Structure ID: line m = lb PAN
5. Structure ID: line m = lb PAN
6. Structure ID: line m = lb PAN
n. lines 1 +2+3+4+5+6= 1336.0 lb PAN
III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN
pFlzlnn nn NnT I IAT FIFI ns TO WHICH PAN CANNOT RE APPLIED DURING THIS 30 DAY PERIOD.
o. tract #
p. field #
q. crop
r. acres
s. remaining IRR
2 PAN balance
(lb/acre)
It. TOTAL PAN
BALANCE FOR
FIELD (lbs.)
column r x s
u. application window'
4696
14A
overseed graze
3.70
30.00
111.0
Sept -April
4696
14B
overseed graze
3.60
30.00
108.0
Sept -April
4696
15A
overseed graze
3.30
30.00
99.0
Sept -April
4696
15B
overseed graze
3.30
30.00
99.0
Sept -April
4696
15C
overseed graze
3.20
30.00
96.0
Sept -April
4696
15D
overseed graze
1.80
30.00
54.0
Sept -April
4696
7A
overseed graze
1.00
30.00
30.0
Sept -April
4696
7B
overseed graze
2.50
30.00
75.0
Sept -April
4696
7C
overseed graze
2.50
30.00
75.0
Sept -April
4696
2
overseed graze
2.90
30.00
87.0
Sept -April
4696
6
overseed graze
5.00
30.00
150.0
Sept -April
466
10
overseed graze
9.10
30.00
273.0
Sept -April
4696
9A
overseed graze
1.85
30.00
55.5
Sept -April
4696
14A
bermuda
3.70
150.00
555.0
Mar- Sept
4696
14B
bermuda
3.60
150.00
540.0
Mar- Sept
** guesimate on PAN left and added Z tlelds for bermuda
'State current crop ending application date or next crop application beginning date for available
receiving crops during 30 day draw down period.
v. Total PAN available for all fields (sum of column t) = 2407.5 Ib. PAN
IV. FACILITY'S PoA OVERALL PAN BALANCE
w. Total PAN to be land applied (line n from section II) = 1336.0 Ib. PAN
x. Crop's remaining PAN balance (line v from section III) = 2407.5 Ib. PAN
y. Overall PAN balance (w - x) = -1072 Ib. PAN
NARRATIVE:
Pumping will begin as soon as field conditions are acceptable. used partial fields to get a negative balance.
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/Identifier (ID): I David Gooden 1
2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard
a. current liquid level according to marker
b. designed 25 yr./24 hr. storm & structural freeboard
c. line b - line a (inches in red zone) _
d. top of dike surface area according to design
(area at below structural freeboard elevation)
e. line c/12 x line d x 7.48 gallons/ft3
3. Projected volume of waste liquid produced during draw down period
C 16.0 inches
19.0 inches
3.0 inches
95836 ft2
179213 gallons
f. temporary storage period according to structural design 180 days
g. volume of waste produced according to structural design 145388 ft3
h. current herd # 4410 certified herd #1 4410
actual waste produced = current herd # x line g =
certified herd #
i. volume of wash water according to structural design
j. excess rainfall over evaporation according to design
k. (lines h + i + j) x 7.48 x 30 days/line f=
4. Total PAN to be land applied during draw down period
I. current waste analysis dated r 12/22/2020
m. ((lines e + k)/1000) x line I =
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
145388 ft'
0 ft3
58333 Ift3
253972 gallons
0.90 Ibs/1000 gal.
389.9 lbs. PAN
PoA (30 Day) 2/21 /00
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/Identifier (ID): I David Gooden 2
2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard
a. current liquid level according to marker
b. designed 25 yr./24 hr. storm & structural freeboard
c. line b - line a (inches in red zone) =
d. top of dike surface area according to design
(area at below structural freeboard elevation)
e. line c/12 x line d x 7.48 gallons/W
3. Projected volume of waste liquid produced during draw down period
13.0 inches
19.0 inches
6.0 inches
95836 ft2
358427 gallons
f. temporary storage period according to structural design 180 days
g. volume of waste produced according to structural design 145388 Ift3
h. current herd # 1 44101 certified herd #1 4410
actual waste produced = current herd # x line g =
certified herd #
i. volume of wash water according to structural design
j. excess rainfall over evaporation according to design
k. (lines h + i + j) x 7.48 x 30 days/line f=
4. Total PAN to be land applied during draw down period
I. current waste analysis dated 12/22/2020
m. ((lines e + k)/1000) x line I =
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
145388 ft3
0 ft3
58333 ft3
253972 gallons
C 0.80 Ibs/1000 gal.
489.9 lbs. PAN
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/Identifier (ID): David Gooden 3
2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard
a. current liquid level according to marker inches
b. designed 25 yr./24 hr. storm & structural freeboard 28.0 inches
c. line b - line a (inches in red zone) = 12.0 inches
d. top of dike surface area according to design
(area at below structural freeboard elevation) 81600 ft2
e. line c/12 x line d x 7.48 gallons/ft3 610368 gallons
3. Projected volume of waste liquid produced during draw down period
f. temporary storage period according to structural design 180 days
g. volume of waste produced according to structural design 96925 ft3
h. current herd # 1 2940 certified herd #1 2940
actual waste produced = current herd # x line g = 96925 ft'
certified herd #
i. volume of wash water according to structural design
j. excess rainfall over evaporation according to design
k. (lines h + i + j) x 7.48 x 30 days/line f=
4. Total PAN to be land applied during draw down period
I. current waste analysis dated 1 12/22/2000
m. ((lines e + k)/1000) x line I =
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
64033 ft3
51680 ft3
265089 gallons
0.80 Ibs/1000 gal.
700.4 lbs. PAN
PoA (30 Day) 2/21 /00