Loading...
HomeMy WebLinkAbout090040_POA_202102153. Earliest possible date to begin land application of waste: PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANOMAL FACE! lES Facility Number: - G County: (ijey Facility Name: ' 100 Farm LLC Certified Operator Name: Operator # 1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the lowest point on the top of the dam for lagoons without spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Lagoon Name/Identifier (ID): Spillway (Yes or No): Level (inches): % f 2. Check all applicable items j On/C(L -C) (11 Soft fijyi 1' id 21 Liquid level is within the desig ned gned structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. Vi Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 clay Plan of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste to pumped and hauled is reflected in section Ill tables. Included within this plan is a list of the proposed sites with related facility number(s), number acres and receiving crop information, Contact and secure approval from the Division of Water Quality prior to transfer of waste to a site not covered in the facility's certified animal waste management plan. Operation will be partially or fully depopulated. - attach a complete schedule with corresponding animal units and dates for depopulation - if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility l4 zl l hereby certify that l have reviewed the information listed above and included within the attached Pion of Action, and to the best of my knowledge and ability, the information is accurate and correct. Facility �ls A Cover Page 2121/00 A l� erlitlianager (print) nerlilfianager (signature) Phone; ,10 Date; - Is - 21 II. TOTAL VOLUME OF WASTE STORED WITHIN STRUCTURAL FREEBOARD ELEVATIONS FOR ALL WASTE STRUCTURES FOR FACILITY 1. structure ID: 2. structure ID: 3. structure ID: 4. structure ID: 5. structure ID: 6. structure ID: 1 0 n.Iines1+2+3+4+5+6= o. line n / 27154 = line I = 44898 gallons line I = gallons line I = gallons line I = gallons line I = gallons line I = gallons 44898 gallons 1.65 acre -inches III. TOTAL ACRES AVAILABLE TO RECEIVE WASTE DURING 5 DAY DRAW DOWN PERIOD1'2 'While this section deals with hydraulic loading capacities, applications cannot exceed agronomic rate for receiving crop according to its certified waste plan. 2Fields with no remaining PAN balance, no receiving crop, and/or completely saturated are not considered available to receive waste. p. tract # q. field # r. soil type s. crop t. acres u. remaining IRR-2 PAN balance (lb/acre) v. maximum application rate (in/hr) w. maximum application amount (inches) 3235 1 NoA Overseed/bermuda hay 4.64 30.00 0.4 1 3235 2S NoA Overseed/bermuda hay 1.11 30.00 0.4 1 3235 2W NoA Overseed/bermuda hay 2.38 30.00 0.5 1 3235 3N NoA Overseed/bermuda hay 2.83 30.00 0.5 1 3235 3S Gm Overseed/bermuda hay 1.62 30.00 0.4 1 3235 4N GbA Overseed/bermuda hay 0.78 30.00 0.5 1 3235 4S GbA Overseed/bermuda hay 1.07 30.00 0.5 1 3235 5N GbA Overseed/bermuda hay 2.83 30.00 0.5 1 3235 5S GbA Overseed/bermuda hay 4.76 30.00 0.5 1 x. total acres available during 5 day draw down (sum of column t) = 22.02 acres IV. FACILITY'S PoA OVERALL HYDRAULIC LOAD TO BE LAND APPLIED PER ACRE Y. line o = 0.08 inches per acre to be applied within 5 days line x If uftlik(idDlaykRatlaihydraulic load listed in line y, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new hydraulic Toad based on new information. Plan to land apply hydraulic Toad: 1. Describe moisture conditions of fields? (e.g. Is there water standing in field; does irrigation equipment mar down in field; "trafficability" across soils; will soils absorb application without runoff, etc.) Fields are wet with standing water and more rain forecasted later this week. 2. Date and amount of last rainfall event? DATE: 2/12-2/15/2021 3. Dates of last waste application event per field: AMOUNT: 4.50 inches Pumped on several fields in January and a little in February. 4. Given optimum soil and weather conditions, is irrigation equipment capable of applying the volume in line "n" at appropriate seasonal (i.e. winter) application rates within 5 days? Probably not with the amount of rain received over the weekend. Hogs are leaving on Tuesday. 5. Irrigation schedule for next 5 days - include daily schedule; proposed application rates and amounts per irrigation event; changes made in gun sizes, nozzles, "o" rings, operating time, travel speed, etc. to meet proposed changes in application rates and amounts; and any other information for consideration. As fields dry out, will try to pump a little. Hogs going out Tuesday. But as field conditions are, probably will not be able to pump in the next 5 days. PoA (5 Day) 2/21/00 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES FIVE (5) DAY DRAW DOWN PERIOD I. TOTAL VOLUME TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): A & H Hog Farm 2. Current liquid volume in structural freeboard a. current liquid level according to marker b. designed structural freeboard zone (Normally 12 inches or greater) c. line b - line a (inches within structural freeboard) _ d. top of dike surface area according to design (area at below structural freeboard elevation) e. line c/12 x line d x 7.48 gallons/ft3 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design g. volume of waste produced according to structural design h. current herd # 0 certified herd # 11.0 12.0 inches inches 1.0 inches 102856 ft2 64114 gallons 180 121058 3672 days ft3 actual waste produced = current herd # x line g = ft3 certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 5 days/line f = 4. Total volume of waste to be land applied during 5 day draw down I. total volume to be land applied line e + line k = 0 62270 ft3 ft3 12938 gallons 77052 gallons REPEAT SECTION 1 FOR EACH WASTE STRUCTURE ON SITE WITH A LIQUID LEVEL WITHIN THE STRUCTURAL FREEBOARD ELEVATIONS. (Click on the next Structure tab shown below) PoA (5 Day) 2/21/00 II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: A & H Hog Farm 2. Structure ID: 3. Structure ID: 4. Structure ID: 5. Structure ID: 6. Structure ID: n.lines 1+2+3+4+5+6= line m = 1127.0 Ib PAN line m = Ib PAN line m = Ib PAN line m = Ib PAN line m = Ib PAN line m = Ib PAN 1127.0 Ib PAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD. o. tract # p. field # q. crop r. acres s. remaining IRR- 2 PAN balance (Ib/acre) t. TOTAL PAN BALANCE FOR FIELD (Ibs.) column r x s u. application window' 3235 1 overseed 4.64 30.00 139.2 Sept -April 3235 2S overseed 1.11 30.00 33.3 Sept -April 3235 2W overseed 2.38 30.00 71.4 Sept -April 3235 3N overseed 2.83 30.00 84.9 Sept -April 3235 3S overseed 1.62 30.00 48.6 Sept -April 3235 4N overseed 0.78 30.00 23.4 Sept -April 3235 4S overseed 1.07 30.00 32.1 Sept -April 3235 5N overseed 2.83 30.00 84.9 Sept -April 3235 5S overseed 4.76 30.00 142.8 Sept -April 3235 1 overseed 4.64 299.00 1387.4 Mar- Sept 3235 2S overseed 1.11 299.00 331.9 Mar- Sept *** guestimate on PAN left***** 'State current crop ending application date or next crop application beginning date for available receiving crops during 30 day draw down period. v. Total PAN available for all fields (sum of column t) = IV. FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied (line n from section II) = x. Crop's remaining PAN balance (line v from section III) = y. Overall PAN balance (w - x) = 2379.9 Ib. PAN 1127.0 Ib. PAN 2379.9 Ib. PAN -1253 Ib. PAN Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new information. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the receiving facility. NARRATIVE: Will pump as soon as conditions allow. PoA (30 Day) 2/21/00 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): A & H Hog Farm 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker b. designed 25 yr./24 hr. storm & structural freeboard c. line b - line a (inches in red zone) = d. top of dike surface area according to design (area at below structural freeboard elevation) e. line c/12 x line d x 7.48 gallons/ft3 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design g. volume of waste produced according to structural design h. current herd # 3672 certified herd # 11.0 19.0 inches inches 8.0 inches 102856 ft2 512909 gallons 180 121058 3672 actual waste produced = current herd # x line g = certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated m. ((lines e + k)/1000) x line I = 1/28/2021 REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) days ft3 121058 fe 0 62270 ft3 ft3 228549 gallons 1.52 Ibs/1000 gal. 1127.0 lbs. PAN PoA (30 Day) 2/21/00