HomeMy WebLinkAbout090169_POA_20210215PLAN OF =ON (0o F Facility Number: _ q Govan ; Facility Name: G-4 \\es re, Cams R HIGH FREEBOARD AT ANIMAL FACILITES 3tatjen r certified Operator Name: fGs 1 t Operator JCd2g0 1. Current liquid level(s) In inches as measured from the current liquid level in the lagoon to the lowest point on the top of the dam for lagoons without spillways; and from the current Iiquid level in the lagoon to the bottom of the spillway for lagoons with spillways, Structure 1 .Structure 2 Structure 3 Structure 4 Structure 5 Structure B ' ',Lagoon Nameflderitifler (ID): Spillway (Yes or No ___ e c Level (inches): _ 2. Check ailapplicable iterns' ..c n Si a Y1 Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste is.to be pumped and hauled to off site locations. Volume and PAN content of waste to pumped and hauled is reflected in section Ill tables. included within this plan is a list of the proposed sites with related facility numbers), number acres and receiving crop information. Contact and secure approval from the Division of ter Quality prior to transfer of waste to a site not covered in the facility's cert`!fied animalwaste management plan. Operation wilt be partially or fully depopulated. - attach a complete schedule with corresponding animal Units and dates for depopulation ' If animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving a Limy of , � I � (4, 2- 1 3. Earliest possible date to begin land application i hereby ceetify_that I have reviewed the information listed above and inctunen within the attached Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct h GI Facility OwnerIllllanager (print) Facility OwnerIMana. er (signature) . Phone:.910-- 271D Date: PoA Cover Page 21Z1lttb II. TOTAL VOLUME OF WASTE STORED WITHIN STRUCTURAL FREEBOARD ELEVATIONS FOR ALL WASTE STRUCTURES FOR FACILITY 1. structure ID: 2. structure ID: 3. structure ID: 4. structure ID: 5. structure ID: 6. structure ID: Gillespie n. lines 1 +2+3+4+5+6= o. line n / 27154 = line I = 174862 gallons line I = gallons line I = gallons line I = gallons line I = gallons line I = gallons 174862 gallons 6.44 acre-inche: III. TOTAL ACRES AVAILABLE TO RECEIVE WASTE DURING 5 DAY DRAW DOWN PERIOD" 'While this section deals with hydraulic loading capacities, applications cannot exceed agronomic rate for receiving crop according to its certified waste plan. 2Fields with no remaining PAN balance, no receiving crop, and/or completely saturated are not considered available to receive waste. p. tract # q. field # r. soil type s. crop t. acres u. remaining IRR-2 PAN balance (lb/acre) v. maximum application rate (in/hr) w. maximum application amount (inches) 1754 12 Dr overseed 1.6 35 0.4 1 1754 14 GrB overseed 2.1 35 0.5 1 1754 15 Dr overseed 9.2 35 0.4 1 1754 6 GrB overseed 4 35 0.5 1 1754 8 Dr overseed 1.6 35 0.4 1 1754 15 Dr bermuda 9.2 210 0.4 1 x. total acres available during 5 day draw down (sum of column t) = 27.70 acres IV. FACILITY'S PoA OVERALL HYDRAULIC LOAD TO BE LAND APPLIED PER ACRE line o = PoA (5Y ay) 2/21/00 0.23 inches per acre to be applied within 5 days line x If unable to land apply hydraulic load listed in line y, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new hydraulic load based on new information. Plan to land apply hydraulic Toad: 1. Describe moisture conditions of fields? (e.g. Is there water standing in field; does irrigation equipment mar down in field; "trafficability" across soils; will soils absorb application without runoff, etc.) high moisture in fields. Irrigation will take place as soon as weather and land conditions permit. 2. Date and amount of last rainfall event? DATE: 3. Dates of last waste application event per field: 02/15/21 AMOUNT: 2.90 inches pumped on a few hydrants on 2/10. 4. Given optimum soil and weather conditions, is irrigation equipment capable of applying the volume in line "n" at appropriate seasonal (i.e. winter) application rates within 5 days? Soil is saturated. Will try to pump later this week on soil as they dry out and hopefully no rain. Some hogs were sold last week. 5. Irrigation schedule for next 5 days - include daily schedule; proposed application rates and amounts per irrigation event; changes made in gun sizes, nozzles, "o" rings, operating time, travel speed, etc. to meet proposed changes in application rates and amounts; and any other information for consideration. Irrigate as weather and land conditions permit. Will pump short times, on dryer fields later this week. PoA (5 Day) 2/21/00 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES FIVE (5) DAY DRAW DOWN PERIOD I. TOTAL VOLUME TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): Gillespie 2. Current liquid volume in structural freeboard a. current liquid level according to marker b. designed structural freeboard zone (Normally 12 inches or greater) c. line b - line a (inches within structural freeboard) = d. top of dike surface area according to design (area at below structural freeboard elevation) e. line c/12 x line d x 7.48 gallons/ft3 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design g. volume of waste produced according to structural design h. current herd # 2666 certified herd # 9.0 12.0 inches inches 3.0 inches 78408 ft2 146623 gallons 180 105497 3200 actual waste produced = current herd # x line g = certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 5 days/line f = 4. Total volume of waste to be land applied during 5 day draw down I. total volume to be land applied line e + line k = days ft3 87892 fe 0 48020 ft3 ft3 28240 gallons 174862 gallons REPEAT SECTION 1 FOR EACH WASTE STRUCTURE ON SITE WITH A LIQUID LEVEL WITHIN THE STRUCTURAL FREEBOARD ELEVATIONS. (Click on the next Structure tab shown below) PoA (5 Day) 2/21/00 II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: Gillespie 2. Structure ID: 3. Structure ID: 4. Structure ID: 5. Structure ID: 6. Structure ID: n. lines 1 +2+3+4+5+6= line m = 1053.1 Ib PAN line m = Ib PAN line m = Ib PAN line m = Ib PAN line m = Ib PAN line m = Ib PAN 1053.1 Ib PAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD. o. tract # p. field # q. crop r. acres s. remaining IRR- 2 PAN balance (Ib/acre) t. TOTAL PAN BALANCE FOR FIELD (Ibs.) column r x s u. application window' 1754 12 overseed 1.60 35.00 56.0 Oct - March 1754 14 overseed 1.60 35.00 56.0 Oct - March 1754 15 overseed 9.20 35.00 322.0 Oct - March 1754 6 overseed 4.00 35.00 140.0 Oct - March 1754 8 overseed 1.60 35.00 56.0 Oct - March 1754 15 bermuda 9.20 210.00 1932.0 Mar -Sept ** guestimate on OS PAN left 'State current crop ending application date or next crop application beginning date for available receiving crops during 30 day draw down period. v. Total PAN available for all fields (sum of column t) _ IV. FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied (line n from section II) = x. Crop's remaining PAN balance (line v from section III) = y. Overall PAN balance (w - x) = NARRATIVE: 2562.0 Ib. PAN 1053.1 Ib. PAN 2562.0 Ib. PAN -1509 Ib. PAN Will begin pumping as soon as field conditions permit. PoA (30 Day) 2/21/00 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): Gillespie 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker b. designed 25 yr./24 hr. storm & structural freeboard c. line b - line a (inches in red zone) = d. top of dike surface area according to design (area at below structural freeboard elevation) e. line c/12 x line d x 7.48 gallons/ft3 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design g. volume of waste produced according to structural design h. current herd # 2666 certified herd # 9.0 19.0 inches inches 10.0 inches 78408 ft2 488743 gallons 180 105497 3200 actual waste produced = current herd # x line g = certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated m. ((lines e + k)/1000) x line I = 2/3/2021 REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) days ft3 87892 fti 0 48020 ft3 ft3 169437 gallons 1.60 Ibs/1000 gal. 1053.1 Ibs. PAN PoA (30 Day) 2/21/00