Loading...
HomeMy WebLinkAbout090102_POA_20210215FLAK OF A Facility Number: CIO N (PoA) F017 HOGH FREE Of E 4D AT G m i b ✓VFacility Name: �) fal (OCtSofl c vL l NB AL FACHUTOES E � County: ��) J en Certified Operator Name: LYS QLOIJ/401L/ �. Current liquid Level q (s) in inches s measured from the current lowest point on the top of the dam for lagoons without spillways; in the lagoon to the bottom of the spillway for lagoons with spillwa Operator # liquid level in the lagoon to the and from the current liquid level ys. Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Lagoon Name/Identifier (ID): Spillway (Yes or No): Level (inches): 2. Check all applicable items .r- Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste to pumped and hauled is reflected in section Ill tables. Included within this plan is a list of the proposed sites with related facility number(s), number acres and receiving crop information. Contact and secure approval from the Division of Water Quality prior to transfer of waste to a site not covered in the facility's certified animal waste management plan. Operation will be partially or fully depopulated. - attach a complete schedule with corresponding animal units and dates for depopulation - if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3. Earliest possible date to begin land application of waste: - 1 2. l hereby certify that l have reviewed the information listed above and included within the attached Plan of Actiok and to the best of my knowledce and abilitvn_theformation is accurate and correct. • .QJ ` Jsor % F o c i i j' E f' orttu r1r, a s pj 'a' cc:iilEl 2e.7t gc-,: ar3 ?r6-2er (s, Gee cure-,) PoA Cover Page 2/21/00 t ft0 — 'hone: Date: 0 t0 II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: 2. Structure ID: 3. Structure ID: 4. Structure ID: 5. Structure ID: 6. Structure ID: Neill Jackson n. lines 1 +2+3+4+5+6= line m = 8.0 Ib PAN line m = Ib PAN line m = Ib PAN line m = Ib PAN line m = Ib PAN line m = Ib PAN 8.0 Ib PAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD. o. tract # p. field # q. crop r. acres s. remaining IRR- 2 PAN balance (Ib/acre) t. TOTAL PAN BALANCE FOR FIELD (Ibs.) column r x s u. application window 903 5368 Small grain overseed 10.50 30.00 315.0 10/1 - 3/31 ***guestimate on PAN remaining - sample is 0.04 PAN 'State current crop ending application date or next crop application beginning date for available receiving crops during 30 day draw down period. v. Total PAN available for all fields (sum of column t) = IV. FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied (line n from section II) = x. Crop's remaining PAN balance (line v from section III) = y. Overall PAN balance (w - x) = NARRATIVE: 315.0 Ib. PAN 8.0 Ib. PAN 315.0 Ib. PAN -307 Ib. PAN Will begin pumping as soon as field conditions permit. PoA (30 Day) 2/21/00 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): Neill Jackson 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker b. designed 25 yr./24 hr. storm & structural freeboard c. line b - line a (inches in red zone) = d. top of dike surface area according to design (area at below structural freeboard elevation) e. line c/12 x line d x 7.48 gallons/ft3 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design g. volume of waste produced according to structural design h. current herd # 3804 certified herd # 16.0 19.0 inches inches 3.0 inches 55517 ft2 103817 gallons 180 43255 3804 actual waste produced = current herd # x line g = certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated m. ((lines e + k)/1000) x line I = 12/22/2020 REPEAT SECTION 1 FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) days ft3 43255 ft3 0 34653 ft3 ft3 97125 gallons 0.04 lbs/1000 gal. 8.0 lbs. PAN PoA (30 Day) 2/21/00