Loading...
HomeMy WebLinkAboutWQ0003475_Staff Report_20210315State of North Carolina Division of Water Resources Water Quality Regional Operations Section Environmental Staff Report Quality To: ❑ NPDES Unit ❑ Non -Discharge Unit Attn: Poonam Giri From: Jane Bernard Raleigh Regional Office Application No.: WQ0003475 Facility name: 1723 I-85 Service Road SFR Note: This form has been adal2ted from the non -discharge facility staff report to document the review of both non - discharge and NPDES permit applications and/or renewals. Please complete all sections as they are appjicable. I. GENERAL AND SITE VISIT INFORMATION 1. Was a site visit conducted? ® Yes or ❑ No a. Date of site visit: March 10, 2021 b. Site visit conducted by: Jane Bernard c. Inspection report attached? ❑ Yes or ® No d. Person contacted: Jose Silva and their contact information: (9l9) 697 - 1448 ext. e. Driving directions: 2. Discharge Point(s): Latitude: Longitude: Latitude: Longitude: 3. Receiving stream or affected surface waters: Classification: River Basin and Subbasin No. Describe receiving stream features and pertinent downstream uses: H. PROPOSED FACILITIES: NEW APPLICATIONS 1. Facility CIassification: (Please attach completed rating sheet to be attached to issued permit) Proposed flow: Current permitted flow: 2. Are the new treatment facilities adequate for the type of waste and disposal system? ❑ Yes or ❑ No If no, explain: 3. Are site conditions (soils, depth to water table, etc) consistent with the submitted reports? ❑ Yes ❑ No ❑ N/A If no, please explain: 4. Do the plans and site map represent the actual site (property lines, wells, etc.)? ❑ Yes ❑ No ❑ N/A If no, please explain: __ _ _ 5. Is the proposed residuals management plan adequate? ❑ Yes ❑ No ❑ N/A If no, please explain: 6. Are the proposed application rates (e.g., hydraulic, nutrient) acceptable? ❑ Yes ❑ No ❑ N/A If no, please explain: FORM: WQROSSR 04-14 Pagel of4 7. Are there any setback conflicts for proposed treatment, storage and disposal sites? ❑ Yes or ❑ No If yes, attach a map showing conflict areas. S. Is the proposed or existing groundwater monitoring program adequate? ❑ Yes ❑ No ❑ NIA If no, explain and recommend any changes to the groundwater monitoring program: 9. For residuals, will seasonal or other restrictions be required? ❑ Yes ❑ No ❑ NIA If yes, attach list of sites with restrictions (Certification B) Describe the residuals handling and utilization scheme: 10. Possible toxic impacts to surface waters: 11. Pretreatment Program (POTWs only): M. EXISTING FACILITIES: MODIFICATION AND RENEWAL APPLICATIONS 1. Are there appropriately certified Operators in Charge (ORCs) for the facility? ❑ Yes ❑ No ® NIA ORC: Certificate #: Backup ORC: Certificate #: 2. Are the design, maintenance and operation of the treatment facilities adequate for the type of waste and disposal system? ® Yes or ❑ No If no, please explain: Description of existing facilities: Proposed flow: Current permitted flow: Explain anything observed during the site visit that needs to be addressed by the permit, or that may be important for the permit writer to know (i.e., equipment condition, function, maintenance, a change in facility ownership, etc.) 3. Are the site conditions (e.g., soils, topography, depth to water table, etc) maintained appropriately and adequately assimilating the waste? ® Yes or ❑ No If no, please explain: 4. Has the site changed in any way that may affect the permit (e.g., drainage added, new wells inside the compliance boundary, new development, etc.)? ❑ Yes or ® No If yes, please explain: 5. Is the residuals management plan adequate? ® Yes or ❑ No If no, please explain: 6. Are the existing application rates (e.g., hydraulic, nutrient) still acceptable? ® Yes or ❑ No If no, please explain: 7. Is the existing groundwater monitoring program adequate? ❑ Yes ❑ No ® NIA If no, explain and recommend any changes to the groundwater monitoring program: 8. Are there any setback conflicts for existing treatment, storage and disposal sites? ® Yes or ❑ No If yes, attach a map showing conflict areas. 9. Is the description of the facilities as written in the existing permit correct? ® Yes or ❑ No If no, please explain: 10. Were monitoring wells properly constructed and located? ❑ Yes ❑ No ® NIA If no, please explain: FORM: WQROSSR 04-14 Page 2 of 4 11. Are the monitoring well coordinates correct in BIMS? ❑ Yes ❑ No ® NIA If no, please complete the following ex and table if necessary): Monitoring Well Latitude Longitude o r rr � r rr 12. Has a review of all self -monitoring data been conducted (e.g., DMR, NDMR, NDAR, GW)? ❑ Yes or ❑ No Please summarize any findings resulting from this review: Provide input to help the permit writer evaluate any requests for reduced monitoring, if applicable. 13. Are there any permit changes needed in order to address ongoing BIMS violations? ❑ Yes or ® No If yes, please explain: 14. Check all that apply: ® No compliance issues ❑ Current enforcement action(s) ❑ Currently under JOC ❑ Notice(s) of violation ❑ Currently under SOC ❑ Currently under moratorium Please explain and attach any documents that may help clarify answer/comments (i.e., NOV, NOD, etc.) If the facility has had compliance problems during the permit cycle, please explain the status. Has the RO been working with the Permittee? Is a solution underway or in place? Have all compliance dates/conditions in the existing permit been satisfied? ® Yes ❑ No ❑ NIA If no, please explain: 15. Are there any issues related to compliance/enforcement that should be resolved before issuing this permit? ❑ Yes ®No❑N/A If yes, please explain: 16. Possible toxic impacts to surface waters: 17. Pretreatment Program (POTWs only): IV. REGIONAL OFFICE RECOMMENDATIONS 1. Do you foresee any problems with issuance, -"renewal of this permit? ❑ Yes or ® No If yes, please explain: 2. List any items that you would Iike the NPDES Unit or Non -Discharge Unit Central Office to obtain through an additional information request: FORM: WQROSSR 04-14 Page 3 of 4 3. List specific permit conditions recommended to be removed from the permit when issued: 4. List specific special conditions or compliance schedules recommended to be included in the permit when issued: Condition Reason 5. Recommendation: ❑ HoId, pending receipt and review of additional information by regional office ❑ Hold, pending review of draft permit by regional office ❑ Issue upon receipt of needed additional information ® Issue ❑ Deny {Please state reasons: 6. Signature of report preparer: Signature of regional supervisor: Date: 3/15/2021 ADDITIONAL REGIONAL STAFF REVIEW ITEMS FORM: WQROSSR 04-14 Page 4 of 4