Loading...
HomeMy WebLinkAbout820505_POA_202102162/18/2021 Mail - Fontenot, Katie - Outlook FW: [External] 5 Day POA's for 9-139, 9-54, and 82-505 Guyton, Steve <steve.guyton@ncdenr.gov> Thu 2/18/2021 2:01 PM To: Fontenot, Katie <katie.fontenot@ncdenr.gov> From: James Lamb [mailto:jlamb@prestagefarms.com] Sent: Tuesday, February 16, 2021 12:16 PM To: Guyton, Steve <steve.guyton@ncdenr.gov> Subject: [External] 5 Day POA's for 9-139, 9-54, and 82-505 CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES Facility Number: 82-505 County: Sampson Facility Name: P-8 Certified Operator Name: William M. Warren Operator Number: 17927 1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the lowest point on the top of the dam for lagoons without spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Lagoon 1 Lagoon Name/ID: 1 Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5 Spillway(Y or N): N Level(inches): 10 2. Check all applicable items Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations, Volume and PAN content of waste to be pumped and hauled is reflected in section III tables. Included within this plan is a list of the proposed sites with related facility numbers, number of acres and receiving crop information. Contact and secure approval from the DWQ prior to transfer of waste to a site not covered in the facility's CAWMP. Hauled to facilty # 82-407 Operation will be partially or fully depopulated. *Attach a complete schedule with corresponding animal units and dates fro depopulation *if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3. Earliest possible date to begin land application of waste: Started hauling on 2/16/21. I hereby certify that I have reviewed the information listed above and included within the attached Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct. https://outlook.office365.com/mail/inbox/id/AAQkAGM2NWE3OTJmLThiOWMtNGNINC1 hYTkOLTJIZjMzZDM2ZDU1YwAQAMhwi%2Fx%2BfUXorTfjn... 1/3