Loading...
HomeMy WebLinkAbout090014_POA_20210218laS Facility Number: Facility Name: Certified Operator Name: PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANU ': AL FACILITIES I `t County: Accms rAmb-t,t)L Operator* (2O 1. Current liquid level(s) in inc ies as measured from the current Iiquid level in the lagoon to the lowest point on the top of the dam for lagoons without spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Lagoon Name/Identifier (ID): Spillway (Yes or No): Level (inches): 2. Check all applicable items Structure I Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Liquid level is within the designed structural freeboard elevations of one or more structures Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. Liquid level is within the 25year 24 hour storm elevations for one orstructures, more A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste to , pumped and hauled is reflected in section ill tables. Included. within this plan is a list of the proposed sites with related facility number(s), number acres and receiving crop information. Contact and secure approval from the Division of Water Quality prior to transfer of waste to a site not covered in the facility's certified animal waste rnanagement plan. Operation will be partially or fully depopulated. - attach a complete schedule with corresponding animal units and dates for depopulation - if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3. Earliest Pp possible date to begin land application of waste: /(2°/°2- 9 I hereby certify that I have reviewed the cnrorrd«Lion listed above and included within the attached Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct cu.) nrarot,tx„ Phone: `"Lin'"74 a109�% Facili1 Owner/Manager (print) a /l 8 �1 Date: Facility Owner/Manager (signature) PoA Cover Page 2/21/00 11. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: 2. Structure ID: 3. Structure ID: 4. Structure ID: 5. Structure ID: 6. Structure ID: Marlowe Finisher n.lines 1+2+3+4+5+6= line m = 790.9 Ib PAN line m = Ib PAN line m = Ib PAN line m = Ib PAN line m = Ib PAN line m = Ib PAN 790.9 Ib PAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN ING THIS 30 DAY PERIOD. o. tract # p. field # q. crop r. acres s. remaining IRR-2 PAN balance (Ib/acre) t. TOTAL PAN BALANCE FOR FIELD (Ibs.) column r x s u. application window' 2,6 1 overseed grazed 2.58 25.00 64.5 Oct -Mar 2 2 overseed grazed 3.08 25.00 77.0 Oct -Mar 4,1 3 overseed grazed 2.98 25.00 74.5 Oct -Mar 1 4 overseed grazed 3.55 25.00 88.8 Oct -Mar 4,1 5 overseed grazed 3.34 25.00 83.5 Oct -Mar 1 6 overseed grazed 3.10 25.00 77.5 Oct -Mar 1 7 overseed grazed 3.55 25.00 88.8 Oct -Mar 2,6 1 bermuda 2.58_ 190.00 490.2 Mar -Sept _ ** guestimate on PAN left, used 1 field in bermuda since opens Mar 1State current crop ending application date or next crop application beginning date for available receiving crops during 30 day draw down period. v. Total PAN available for all fields (sum of column t) _ IV. FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied (line n from section II) = x. Crop's remaining PAN balance (line v from section III) = y. Overall PAN balance (w - x) = 1044.7 Ib. PAN 790.9 lb. PAN 1044.7 Ib. PAN -254 Ib. PAN Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new information. If newfields are to be included as an option for lowering lagoon level, add thesefieldsto the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the receiving facility. NARRATIVE: Will pump as soon as conditions allow. t off uay) ziz-uuu PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): Marlowe Finisher 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker b. designed 25 yr./24 hr. storm & structural freeboard c. line b - line a (inches in red zone) = d. top of dike surface area according to design (area at below structural freeboard elevation) e. line c/12 x line d x 7.48 gallons/ft3 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design g. volume of waste produced according to structural design h. current herd # 6200 certified herd # 18.0 19.0 inches inches 1.0 inches 148216 ft2 92388 gallons 180 214151 6480 actual waste produced = current herd # x line g = certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated m. ((lines e + k)/1000) x line l = 9/24/20 REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) days ft3 204898 ft3 0 89833 ft3 ft3 367431 gallons 1.72 lbs/1000 gal. 790.9 lbs. PAN PoA (30 Day) 2/21 /00