Loading...
HomeMy WebLinkAbout090216_POA_20210218I OH FREEBOARD AT Ail M L A C: flT1flES ?UK. OF ACTION (PGA) FO FacilityNumber:. Facility Hanle: • Certified Operator Name: !ha County: 'eJ-8V) Operator g . Current liquid level(s) in inches as measured from the current Iiquid level in the lagoon to the lowest point on the. top of the dam for lagoons without spillways; and from the current Liquid level in the lagoon to the bottom of the spillway for lagoons with spillways, Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Lagoon Name/Identifier (ID): • Spillway (Yes or No): Level (inches): 2. Check ail applicable items Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste to pumped and hauled is reflected in section III tables. Included within this plan is a list of the proposed sites with related facility number(s), number acres and receiving crop information. Contact and secure approval from the Division of Water Resources prior to transfer of waste to a site not covered 'an the facility's certified animal waste management plan. Operation will be partially or fully depopulated. - attach a complete schedule with corresponding animal units and dates for depopulation - if animals are to be moved to another permitted facility, provide facility nurriber, lagoon freeboard levels and herd population for the receiving facility 01/A0/01,1 3. Earliest possible date to begin land application of waste: - s-- -- • it hereby certify that 1-have reviewed the information listed above and induced within the attached Plan of Action, and to the lest of my knowledge and ability, the information is accurate and correct: a1 Jr\mn Facility Own/i ianager (print) Facility Ownerili tanager (signature) Phone:ID;gr)24-32G-1 (0?)02,1 Date: PoA Cover Page 2/21/00 11. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: R & M - Michael Inman line m = 218.3 Ib PAN 2. Structure ID: line m = Ib PAN 3. Structure ID: line m = Ib PAN n. lines 1 +2+3+4+5+6= 218.3 Ib PAN 111. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN DURING THIS 30 DAY PERIOD. 1 `I%IVY. VV O. tract # ■�v ■ r•w • . .rr.+w p. field # . �.. ..-.. . . ..- __ ______ q. crop _ r. acres s. remaining IRR-2 PAN balance (Ib&acre) t. TOTAL PAN BALANCE FOR FIELD (Ibs.) column r x s u. application window' 11170 1A overseed 3.57 25.00 89.3 Oct -Mar 11170 1 B overseed 3.5 25.00 87.5 Oct -Mar 11170 2 overseed 6 25.00 150.0 Oct -Mar ** guestimate on PAN left State current crop ending application date or next crop application beginning date for available receiving crops during 30 day draw down period. v. Total PAN available for all fields (sum of column t) = IV. FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied (line n from section 11) = x. Crop's remaining PAN balance (line v from section 111) = y. Overall PAN balance (w - x) = 326.8 Ib. PAN 218.3 lb. PAN 326.8 Ib. PAN -108 Ib. PAN Line y must show as a deficit. If Tine y does not show as a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new information. If newfields are to be included as an option for lowering lagoon level, add thesefields to the PAN balance table and recalculatethe overall PAN balance. If animal waste is to be hauled to another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the receiving facility. NARRATIVE: will begin pumping as soon as weather permits. PoA (30 Day) 2/21/00 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD 1. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): R & M - Michael Inman 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker b. designed 25 yr./24 hr. storrn & structural freeboard c. line b - line a (inches in red zone) = d. top of dike surface area according to design (area at below structural freeboard elevation) e. line c/12 x line d x 7.48 gallons/ft3 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design g. volume of waste produced according to structural design h. current herd # 6400 certified herd # 29.0 30.0 inches inches 1.0 inches 61200 ft2 38148 gallons 180 46888 6400 actual waste produced = current herd # x line g = certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated m. ((lines e + k)I1000) x line I = 8/17/20 REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) days ft3 46888 ft3 30976 38658 ft3 ft3 145264 gallons 1.19 Ibs/1000 gal. 218.3 lbs. PAN PoA (30 Day) 2/21/00