Loading...
HomeMy WebLinkAbout090131_POA_20210219-2LAN OF ACTI1ON (PoA FOR H FREEBOARD AT AM F T GES Facility Number: POD-'(f° � �:y County: Facillitty Nameo(Lj0J4 t � lam' Il V U f OperaM or Name: �es/; 1 Qr v \:✓ (r �!'1 Operator # (1 0 0 L t'l �'1J,•-t1 i,�^• '�1 0 4^. Li 1. Current liquid level(s) in inches as measured from lowest point onthe top of the darn for lagoons -wit the current liquid level in the lagoon to the for lagoons spillways; and from the current liquid level in the lagoon to the bottom of the spillwaygoons with spillways. Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Lagoon Name/Identifier (ID): Structure 6 Spillway (Yes or No): Level (inches): 2. Check aJ9 applicable items �� 3Odcwsiby d Liquid level is within the designed structural r g d structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances areacceptable ranges. within Liquid level is within the '25 year 24: hour storm elevations for one or more structures. Plan of Action is attached. Agronomic balance is within acceptable range. A 30 day Waste is to be pumped and hauled to off site locations. Volume pumped and hauled is reflected in section 111 tables. Included within tPAN content of waste to proposed sites with related facility number(s), number acres and receiving glacron s informa list ation. the Contact and secure approval from the Division of Water Qi aiity prior to transfer ., oration. to a site not covered in the facility's certified anirai waste management e'er of waste 1�' Operation will be partially or fully depopulated. - attach a complete schedule with corresponding animal units and dates for depopulation - if animals are to be moved to another permitted facility, freeboard levels and herd population for the receiving facility facility number, lagoon y . Earliest possible date to begin land a ) p n licatio of waste:c' l A 0/ ®�'/ Q hereby certify that i have reviewed the information� and ; ° 9°sled above and inci��ded with n the attached flan of Action, and to the best of My knowledge and ability, the information is accurate and correct tj �i Facility� � b� eL/ arager (print) Facility Owner/i anagerr (signature) Phone: a )20,2/1Laten PoA Cover Page 2/2V00 II. TOTAL VOLUME OF WASTE STORED WITHIN STRUCTURAL FREEBOARD ELEVATIONS FOR ALL WASTE STRUCTURES FOR FACILITY 1. structure ID: 2. structure ID: 3. structure ID: 4. structure ID: 5. structure ID: 6. structure ID: 1 0 n. lines 1 + 2 + 3 + 4 + 5 + 6 = o. line n / 27154 = line I = 194593 gallons line I = gallons line I = gallons line I = gallons line I = gallons line I = gallons 194593 gallons 7.17 acre -inches III. TOTAL ACRES AVAILABLE TO RECEIVE WASTE DURING 5 DAY DRAW DOWN PERIOD''2 'While this section deals with hydraulic loading capacities, applications cannot exceed agronomic rate for receiving crop according to its certified waste plan. 2Fields with no remaining PAN balance, no receiving crop, and/or completely saturated are not considered available to receive waste. p. tract # q. field # r. soil type s. crop t. acres u. remaining IRR-2 PAN balance (lb/acre) v. maximum application rate (in/hr) w. maximum application amount (inches) 4742 1 ExA overseed 5.35 30 0.35 1 4742 2 ExA overseed 4.51 30 0.35 1 **guestimate on PAN*** x. total acres available during 5 day draw down (sum of column t) = 9.86 acres IV. FACILITY'S PoA OVERALL HYDRAULIC LOAD TO BE LAND APPLIED PER ACRE y. line o = line x 0.73 inches per acre to be applied within 5 days If unable to land apply hydraulic load listed in line y, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new hydraulic Toad based on new information. is adding fields in a temporary amendament for additional pumping PoA (5 Day) 2/21/00 Plan to land apply hydraulic load: 1. Describe moisture conditions of fields? (e.g. Is there water standing in field; does irrigation equipment mar down in field; "trafficability" across soils; will soils absorb application without runoff, etc.) fields are still wet hopefully will dry out later this week. They will select the dryest Ioactions to pump. Plans to irrigate Wed or Thursday. Needs about 2 hours to irrigrate and will be out of structural. no rain in forecast until the Friday and 50% then. 2. Date and amount of last rainfall event? DATE: 3. Dates of last waste application event per field: 02/19/21 AMOUNT: -4 inches 4. Given optimum soil and weather conditions, is irrigation equipment capable of applying the volume in line "n" at appropriate seasonal (i.e. winter) application rates within 5 days? Maybe - depending on how quickly fields dry out. fields are still wet. 5. Irrigation schedule for next 5 days - include daily schedule; proposed application rates and amounts per irrigation event; changes made in gun sizes, nozzles, "o" rings, operating time, travel speed, etc. to meet proposed changes in application rates and amounts; and any other information for consideration. No changes to equipment. Plan using solid set this rest of this week as field conditions allow. PoA (5 Day) 2/21/00 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES FIVE (5) DAY DRAW DOWN PERIOD I. TOTAL VOLUME TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): White Plains 2. Current liquid volume in structural freeboard a. current liquid level according to marker b. designed structural freeboard zone (Normally 12 inches or greater) c. line b - line a (inches within structural freeboard) = d. top of dike surface area according to design (area at below structural freeboard elevation) e. line c/12 x line d x 7.48 gallons/ft3 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design g. volume of waste produced according to structural design h. current herd # 6060 certified herd # 6.0 12.0 inches inches 6.0 inches 48000 ft2 179520 gallons 180 44543 6060 actual waste produced = current herd # x line g = certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 5 days/line f = 4. Total volume of waste to be land applied during 5 day draw down I. total volume to be land applied line e + line k = days ft3 44543 ft6 28000 ft3 ft3 15073 gallons 194593 gallons REPEAT SECTION 1 FOR EACH WASTE STRUCTURE ON SITE WITH A LIQUID LEVEL WITHIN THE STRUCTURAL FREEBOARD ELEVATIONS. (Click on the next Structure tab shown below) PoA (5 Day) 2/21/00