HomeMy WebLinkAboutNCC200885_NOT Closeout Documents_20210315SEDIMENTATION INSPECTION REPORT
New Hanover County
Engineering Department
230 Government Center Drive • Suite 160
Wilmington, North Carolina 28403
TELEPHONE (910)-798-7139
Beth E. Wetherill, C.P.E.S.C.
Soil Erosion Specialist
Email: bwetherill@nhcgov.com
Project Name & Location: Bella Port- McKee Homes 139 Bella Port Ln (Lot 4)
Grading Permit #: 59-16
Revision 4
Financially Responsible Party & Address: McKee Homes- 109 Hay Street, Ste. 301, Fayetteville NC 28301
Pictures: ❑ Yes ❑X No
Weather & Soil Conditions: Sunny, Dry conditions, 73F
Inspection Type: ❑ Initial ❑ Periodic N Final ❑ Complaint
Date Report Sent:
3/12/2021
Contact Made With: N/A
Inspection report to be sent/given, including financially responsible party: Kelsey Rivera-
krivera@mckeehomesnc.com
Has this project been issued and NOV? ❑ Yes ❑X No
Potential NPDES violation? ❑ Yes ❑X No
Degree: Choose an item.
NPDES Type: Choose an
item.
Is there offsite sediment? El Yes ❑X No
Degree: Choose an item.
Location: Click or tap here
to enter text.
Part 1: Please take immediate corrective action for the following items within 7-10 days of this inspection for
the site to be in compliance with the Erosion and Sedimentation Control Ordinance:
N N/A
Part 2: Please take corrective action for the following items prior to next periodic inspection for the site to be
in compliance with the Erosion and Sedimentation Control Ordinance:
N N/A
Part 3: Additional Comments: Permanent ground cover sufficient to restrain erosion has been established.
No additional self -monitoring or self -inspections are required. Project is in compliance and released under
the SPCA. The New Hanover County Land Disturbing Permit is now closed for GP#59-16 Revision 4.
Termination of coverage under the NPDES General Stormwater Permit for Construction Activities (NCG01)
must be requested by the permittee via a Notice of Termination (NOT). The NOT is available at:
https://edocs.deq.nc.gov/Forms/NCGO1-Termination. Please note that this correspondence must be
uploaded as part of completing the NOT process.
Report by: Beth Furr
Date of Inspection: 3/10/2021
Others Present: N/A
Bfurr@nhcgov.com
Pictures: N/A
Contact this office with any questions and/or comments about this report and/or project.