HomeMy WebLinkAbout090210_Plan of Action_20000221PLAN OF ACTION (P®A) FOR HIGH FREEBOARD AT ANIMAL FACUTES
FacilityNumber: _
County:
Facility Name:
Certified Operator Name: David CQ efi
Operator #
1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the
lowest point on the top of the dam for lagoons without spillways; and from the current liquid level
in the lagoon to the bottom of the spillway for lagoons with spillways.
Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6
Lagoon Name/Identifier (ID):
Spillway (Yes or No):
Level (inches): /U
2. Check all applicable items �-4-CVASiPo& �11:51ao.21
Liquid level is within the designed structural freeboard elevations of one or more structures. Five
and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within
acceptable ranges.
Liquid level is within the 25 ear 24 hour storm elevations for one or more structures. A 30 day
y
Plan of Action is attached. Agronomic balance is within acceptable range.
Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste to
pumped and hauled is reflected in section III tables. Included within this plan is a list of the
proposed sites with related facility number(s), number acres and receiving crop information.
Contact and secure approval from the Division of Water Quality prior to transfer of waste
to a site not covered in the facility's certified animal waste management plan.
Operation will be partially or fully depopulated.
- attach a complete schedule with corresponding animal units and dates for depopulation
- if animals are to be moved to another permitted facility, provide facility number, lagoon
freeboard levels and herd population for the receiving facility
3. Earliest possible date to begin land application of waste:
I hereby certify that I have reviewed the information listed above and included within the attached Plan
of Action, and to the best of my knowledge and ability, the information is accurate and correct.
0 v 1`&p �,o a �i . �`�--
Facility Owner/Manager (print)
Facili
ner/Manager (signature)
Phone: 9
Date:
PoA Cover Page 2121100
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
FIVE (5) DAY DRAW DOWN PERIOD
I. TOTAL VOLUME TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/Identifier (ID): JDavid Gooden L 2
2. Current liquid volume in structural freeboard
a. current liquid level according to marker 00.0 inches
b. designed structural freeboard zone 12.0 inches
(Normally 12 inches or greater)
c. line b - line a (inches within structural freeboard) = 2.0 inches
d. top of dike surface area according to design
(area at below structural freeboard elevation) 95836 ft2
e. line c/12 x line d x 7.48 gallons/W 119476 gallons
3. Projected volume of waste liquid produced during draw down period
f. temporary storage period according to structural design 180 days
g. volume of waste produced according to structural design 145388 1ft3
h. current herd # I certified herd #1 4410
actual waste produced = current herd # x line g =
certified herd #
i. volume of wash water according to structural design
j. excess rainfall over evaporation according to design
k. (lines h + i + j) x 7.48 x 5 days/line f =
4. Total volume of waste to be land applied during 5 day draw down
I. total volume to be land applied line e + line k =
145388 ft3
0 ft3
58333 ft3
42329 gallons
161804 gallons
REPEAT SECTION 1 FOR EACH WASTE STRUCTURE ON SITE WITH A LIQUID LEVEL WITHIN
THE STRUCTURAL FREEBOARD ELEVATIONS. (Click on the next Structure tab shown below)
PoA (5 Day) 2/21 /00
II. TOTAL VOLUME OF WASTE STORED WITHIN STRUCTURAL FREEBOARD ELEVATIONS
FOR ALL WASTE STRUCTURES FOR FACILITY
1. structure ID: David Gooden 2 line I = 161804 gallons
2. structure ID: 0 line I = gallons
3. structure ID: line I = gallons
4. structure ID: line I = gallons
5. structure ID: line I = gallons
6. structure ID: line I = gallons
n. lines 1 +2+3+4+5+6=
o. line n / 27154 =
161804 gallons
5.96 acre -inches
III. TOTAL ACRES AVAILABLE TO RECEIVE WASTE DURING 5 DAY DRAW DOWN PERIOD1,2
'While this section deals with hydraulic loading capacities, applications cannot exceed
agronomic rate for receiving crop according to its certified waste plan.
2Fields with no remaining PAN balance, no receiving crop, and/or completely saturated are
not considered available to receive waste.
p. tract #
q. field #
r. soil type
s. crop
t. acres
u. remaining
IRR-2 PAN
balance
(lb/acre)
v. maximum
application rate
(in/hr)
w. maximum
application
amount (inches)
4696
19A
NoB
overseed graze
1.91
25
0.5
4696
19B
NoB
overseed graze
2.92
25
0.5
4696
6 A and B
NoA
overseed graze
5.00
25
0.5
4696
7A
NoA
overseed graze
1.00
25
0.5
4696
713
NoA
overseed graze
2.50
25
0.5
4696
7C
NoA
overseed graze
2.50
25
0.5
4696
9A
GbA
overseed graze
1.85
25
0.5
4696
913
GbA
overseed graze
2.75
25
0.5
4696
14A
WaB
overseed graze
3.70
25
0.5
4696
14B
WaB
overseed graze
3.60
25
0.5
4696
15A
WaB
overseed graze
3.30
25
0.5
4696
15B
WaB
overseed graze
3.30
25
0.5
x. total acres available during 5 day draw down (sum of column t) = 34.33 acres
IV. FACILITY'S PoA OVERALL HYDRAULIC LOAD TO BE LAND APPLIED PER ACRE
y. line o = 0.17 inches per acre to be applied within 5 days
line x
If ur t0!1d c240* hydraulic load listed in line y, list course of action here including pump
and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options,
recalculate new hydraulic load based on new information.
Plan to land apply hydraulic load:
1. Describe moisture conditions of fields? (e.g. Is there water standing in field; does irrigation
equipment mar down in field; "trafficability" across soils; will soils absorb application witnout runott, etc.
Fields are still wet. Will pump on dryest fields first.
2. Date and amount of last rainfall event?
DATE: 1 02/19/21
last waste application event per tiela:
AMOUNT: —4 linches
4. Given optimum soil and weather conditions, is irrigation equipment capable of applying the volume in
line "n" at appropriate seasonal (i.e. winter) application rates witnin b aays-!
If fields dry out and no more rain, can get back in compliance.
ti Irrinntinn crharii din fnr nPut F riavc - inrh Ain daily schPciule- nrnnnsed annlication rates and amounts
_ . _ . .. J __ _. - _ _ . - _ - _ _ - _ J I . .
per irrigation event; changes made in gun sizes, nozzles, "o" rings, operating time, travel speed, etc. to
meet proposed changes in application rates ana amounts; ana any otner inrormation ror consiUerauUn.
Will pump as fields dry out.
PoA (5 Day) 2/21 /00