Loading...
HomeMy WebLinkAbout20120805 Ver 1_401 Application_20120812SAMPLE AGENT AUTHORIZATION FORM PROPERTY LEGAL DESCRIPTION: LOT NO. I �Z PLAN NO. STREET ADDRESS: Please print: Property Owner:1 Property Owner: PARCEL ID: 113-�00- 69/ The undersigned, registered property owners of the above noted property, do hereby authorize (3eaL'1oj s)yly,04 of 1 v I (Contractor / Agent) (Name of nsulting firm) to act on my behalf and take all actions necessary for the processing, issuance and acceptance of this permit or certification and any and all standard and special conditions attached. Property Owner's Address (if different than property above): Telephone: S12 - -? 3 ,6-1-1 We hereby certify the above information submitted in this application is true and accurate to the best of our knowledge. Authorized Signature Date: 0 00' W AiF9oG 201 2080 5 Office Use Only - Corps action ID no. DWQ project no. Form Version 1.4 January 2009 Page 1 of 10 PCN Form — Version 1.4 January 2009 Pre - Construction Notification (PCN) Form A. Applicant Information 1. Processing 1 a. Type(s) of approval sought from the Corps: ❑ Section 404 Permit ❑Section 10 Permit 1b. Specify Nationwide Permit (NWP) number: or General Permit (GP) number: 1c. Has the NWP or GP number been verified by the Corps? ❑ Yes ❑ No 1d. Type(s) of approval sought from the DWQ (check all that apply): ❑ 401 Water Quality Certification — Regular ❑ Non -404 Jurisdictional General Permit [] 401 Water Quality Certification — Express Q�Riparian Buffer Authorization 1e. Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification: ❑ Yes ❑ No For the record only for Corps Permit: ❑ Yes ❑ No 1f. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in -lieu fee program. ❑ Yes 1 g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h below. ❑ Yes o 1h. Is the project located within a NC DCM Area f Environmental Concern (AEC)? RYes ❑ No 2. Project Information / 2a. Name of project: 2b. County: (� 2c. Nearest municipality / town: 2d. Subdivision name: �' �01ve'c 2e. NCDOT only, T.I.P. or state project no: 3. Owner Information 3a. Name(s) on Recorded Deed: 3b. Deed Book and Page No. 0 q0 00 3 c. Responsible Party (for LLC if applicable): D 3d. Street address: 3e. City, state, zip: 3f. Telephone no.: �f'Q c- _ P1 02 7 �O 3g. Fax no.: ww wqx 3h. Email address: Page 1 of 10 PCN Form — Version 1.4 January 2009 4. Applicant Information (if different from owner) 4a. Applicant is: EAgent ❑ Other, specify: 4b. Name: 4c. Business name (if applicable): y) n 4d. Street address: C> 4e. City, state, zip: 4f. Telephone no.: r 4g. Fax no.: (Cr _ S 4h. Email address: 5. Agent/Consultant Information (if applicable) 5a. Name: 5b. Business name (if applicable): 5c. Street address: 5d. City, state, zip: 5e. Telephone no.: 5f. Fax no.: 5g. Email address: Page 2 of 10 B. Project Information and Prior Project History 1. Property Identification f Doc) 1a. Property identification no. (tax PIN or parcel ID): I I = 1 b. Site coordinates (in decimal degrees): I Latitude: S" Longitude: 1 c. Property size: acres „ 2. Surface Waters 2a. Name of nearest body of water to proposed project: CJ 2b. Water Quality, Classification of nearest receiving water: 77 O'�' - t"'al iyS' t-,� 2c. River basin: r,{ 3. Project Description 3a. Describe the existing conditions on the site ano the general land use in the vicinity of the project att•the time of this 1 application: -T l 1 � Y) l �E' M l'�I �t 'Nil SC CSY) ► T Y? G II (� I,�?e, c�xx� Ike r S Y�. 0', '� 9� on be �� � o 3b. List the total estimated acreage of all existing wetlands on the property: j ({? , 3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the pr perty: r / 3d. Explain the purpose of the proposed project: ly, d aV►, tA FOD/ �' V' Imo' l� (J 1 3e. Describe the overall project in detail, including the type of equipment to be used: --Q17 r(DAOd Ck, 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / project (including all prior phases) in the past? 9KYes ❑ No ❑ Unkn wn , Comments: ��► j k �. 4b. If the Corps made the jurisdictional determination, what type of determination was made? ❑ Preliminary ❑ Final 4c. If yes, who delineated the jurisdiction Name (if known): C� I reas� Agency /Consultant Company: Other: ) �� 4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. 5. Project History 5a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past? LrJ Yes El No ❑ Unknown 5b. If yes, explain in detail according to "help file" instructions. C' I d CIS ►�� )�� ��� i �� V '^mot 6. Future Project Plans 6a. Is this a phased project? ❑ Yes tKo 6b. If yes, explain. Page 3 of 10 PCN Form — Version 1.4 January 2009 C. Proposed Impacts Inventory 1. Impacts Summary 1 a. Which sections were completed below for your project (ch k all that apply): El Wetlands El Streams — tributaries Buffers ❑ Open Waters ❑ Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. Wetland impact number Permanent (P) or Temporary T 2b. Type of impact 2c. Type of wetland 2d. Forested 2e. Type of jurisdiction Corps (404,10) or DWQ (401, other) 2f. Area of impact (acres) W1 Choose one Choose one Yes/No - W2 Choose one Choose one Yes/No W3 - Choose one Choose one Yes/No W4 - Choose one Choose one Yes/No W5 Choose one Choose one Yes/No - W6 Choose one Choose one Yes /No 2g. Total Wetland Impacts: 2h. Comments: 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. Stream impact number Permanent (P) or Temporary (T) 3b. Type of impact 3c. Stream name 3d. Perennial (PER) or intermittent (INT)? 3e. Type of jurisdiction 3f. Average stream width (feet) 3g. Impact length (linear feet) S1 Choose one S2 - Choose one S3 - Choose one S4 Choose one S5 - Choose one S6 - Choose one 3h. Total stream and tributary impacts 3i. Comments: Page 4 of 10 PCN Form — Version 1.4 January 2009 Page 5 of 10 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then indivii ualfy list all open water impacts below. 4a. 4b. 4c 4d 4e. Open water Name of waterbody impact number Permanent (P) or (if applicable) Type of impact Waterbody Area of impact (acres) Temporary T type 01 Choose one Choose 02 - Choose one Choose 03 - Choose one Choose 04 - Choose one Choose 4f. Total open water impacts 4g. Comments: S. Pond or Lake Construction If pond or lake construction proposed, the complete the chart below. 5a. 5b. 5c. 5d. 5e. Pond ID number Proposed use or Wetland Impacts (acres) Stream Impacts (feet) Upland purpose of pond (acres) Flooded Filled Excavated Flooded Filled Excavated P1 Choose one P2 Choose one 5f. Total: 5g. Comments: 5h. Is a dam high hazard permit required? ❑ Yes ❑ No If yes, permit ID no: 5i. Expected pond surface area (acres): 5j. Size of pond watershed (acres): 5k. Method of construction: 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If any impacts require miti ation, then You MUST fill out Section D of this form. 6a. Project is in which protected basin? euse ❑ Tar - Pamlico ❑ Catawba ❑ Randleman ❑ Other: 6b. Buffer Impact 6c. Reason for impact 6d. Stream name 6e. Buffer 6f. Zone 1 6g. Zone 2 number — Permanent (P) or mitigation impact impact Temporary required? (square (square feet ) feet 61 Yes/No B2 - a/ ., Pn�ta `,{AYE Ye o L7 B3 - Yes/No B4 - Yes /No B5 - Yes/No B6 - Yes /No 6h. Total Buffer Impacts: 6i. Comments: Page 5 of 10 D. Impact Justification and Mitigation 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. S 15 6 Oo 1 b. Specifically describe measur s taken to void or mi imize the proposed impacts through construction techniques. ccx CW." . 2. Compensatory Mitigation f Im acts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for ❑ Yes o impacts to Waters of the U.S. or Waters of the State? 2b. If yes, mitigation is required by (check all that apply): ❑ DWQ ❑ Corps ❑ Mitigation bank 2c. If yes, which mitigation option will be used for this project? ❑ Payment to in -lieu fee program ❑ Permittee Responsible Mitigation 3. Complete if Using a Mitigation Bank 3a. Name of Mitigation Bank: Type: Choose one Quantity: 3b. Credits Purchased (attach receipt and letter) Type: Choose one Quantity: Type: Choose one Quantity: F4Compomments: lete if Making a Payment to In -lieu Fee Program 4a. Approval letter from in -lieu fee program is attached. ❑ Yes 4b. Stream mitigation requested: linear feet Choose one square feet 4c. If using stream mitigation, stream temperature: 4d. Buffer mitigation requested (DWQ only): 4e. Riparian wetland mitigation requested: acres 4f. Non - riparian wetland mitigation requested: acres 4g. Coastal (tidal) wetland mitigation requested: acres 4h. Comments: 5. Complete if Using a Permittee Responsible Mitigation Plan 5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan. Page 6 of 10 PCN Form — Version 1 4 January 2009 u 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ 6a. Will the project result in an impact within a protected riparian buffer that requires /� buffer mitigation? ❑ Yes M No 6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required. 6c. 6d. 6e. Zone Reason for impact Total impact Multiplier Required mitigation (square feet) (square feet) Zone 1 3 (2 for Catawba) Zone 2 1.5 6f. Total buffer mitigation required: 6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in -lieu fee fund). y 14-; J I, t .o lil 6h. Comments: Page 7 of 10 E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan 1 a. Does the project include or is it adjacent to protected riparian buffers identified dyes �No within one of the NC Riparian Buffer Protection Rules? 1 b. if yes, then is a diffuse flow plan included? If no, explain why. -T , Iy✓tro:I` G-'� np nevi( 40 []Yes �o 2. Stormwater Management Plan 2a. What is the overall percent imperviousness of this project? 2b. Does this project require a Stormwater Mana ement Plan? ❑,Yes VNo m 2c. If this project DOES NOT require a Stormwater Managee n, explain why: C kb-r- C1* 2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan: . IL/)q 2e. Who will be responsible for the review of the Stormwater Management Plan? 3. Certified Local Government Stormwater Review 3a. In which local government's jurisdiction is this roeect? ❑ Phase II 3b. Which of the following locally- implemented stormwater management programs ❑ NSW apply (check all that apply): ❑ USMP n Water Supply Watershed ❑ Other: 3c. Has the approved Stormwater Management Plan with proof of approval been ❑ Yes ❑ No attached? 4. DWQ Stormwater Program Review ❑Coastal counties 4a. Which of the following state - implemented stormwater management programs apply ❑HQW ❑ORW (check all that apply): []Session Law 2006 -246 []Other: 4b. Has the approved Stormwater Management Plan with proof of approval been [] Yes ❑ No attached?. 5. DWQ 401 Unit Stormwater Review 5a. Does the Stormwater Management Plan meet the appropriate requirements? ❑ Yes ❑ No 5b. Have all of the 401 Unit submittal requirements been met? [] Yes ❑ No Page 8 of 10 PCN Form — Version 1.4 January 2009 F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) 1 a. Does the project involve an expenditure of public (federal /state /local) funds or the ❑ Yes El No use of public (federal /state) land? 1 b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State ❑Yes ❑ No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1c. If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval letter.) ❑ Yes ❑ No Comments: 2. Violations (DWQ Requirement) 2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, ❑ Yes or Riparian Buffer Rules (15A NCAC 213 .0200)? 2b. Is this an after - the -fact permit application? ❑ Yes o 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s): 3. Cumulative Impacts (DWQ Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in additional development, which could impact nearby downstream water quality? n Yes blqo 3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy. If you answered "no," provide a short narrative description. 4. Sewage Disposal (DWQ Requirement) 4a. Clearly detail the ultimate treatment methods and disposition (non - discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. Page 9 of 10 PCN Form — Version 1.4 January 2009 S. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or habitat? ❑ Yes ❑ No 5b. Have you checked with the USFWS concerning Endangered Species Act impacts? ❑ Yes ❑ No 5c. If yes, indicate the USFWS Field Office you have contacted. - 5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as essential fish habitat? ❑ Yes ❑ No 6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat? 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? ❑ Yes ❑ No 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? B. Flood Zone Designation (Corps Requirement) -T 8a. Will this project occur in a FEMA- designated 100 -year floodplain? ❑ Yes ❑ No 8b. If yes, explain how project meets FEMA requirements: 8c. What source(s) did you use to make the floodplain determination? Applicant/Agent's Printed Name Date pplicant/Agent's Signature (Agent's signature is valid only if an authorization letter from the applicant is provided.) Page 10 of 10 SCIR1'EM RS OsLEAMR' 011, °� 3 EIP R=504.95 THIS WAS ISSUED AND ,SEALED BY JNMY C. SARBOUR, PLS, UCENS F THIS PLAT IS A CORRECT REPRESENTA77ON GE THE LAND SURVEYED, 183.02 CH= 182.01 HOM£VER, A NORTH CAROLINA LICENSED ATRRNEY SHOULD BE CONSULTED - \ �G \ SSMH- SANITARY SEWER MANHOLE CONCERNING CORRECT ONNERSN /P, (MOTH AND LOCATION OF ANY EASEMENTS RIGHTS �� I SCO -SEWER CLEANOUT v OF WAY, CEMETERIES OR FAMILY BURIAL GROUNDS NOT SHORN ON RECORDED OR /[ABLE ICV- IRRIGA77ON CONTROL VALVE CALE 1 ° -40 Q a MAPS DEEDS MADE A ✓A TO THIS SURVEYOR BY THE RECENT ORNER(S) AT THE 77ME OF THIS SURVEY AND 07YER OUES77ONS THAT MAY REVISED 8 -24 -2012 ryV� CTV -CABLE TV PEDESTAL BE REVEALED BY THE 777LE EXAM /NA RON INCLUDING ANY RE57RIC77W A 50" RIPARIAN BUFFER BY LAUREN yT (7 CONENANM NO RESPON578IUTY O' ANY NA7URE /S ASSUMED BY THIS R/W- -RIGHT OF WAY OF WATER OUALITY 919 791 -4251 SURVEYOR FOR ANY CONDITIONS RH /CH MAY PRESENRY EXIST BUT ARE UNKNORN, SUCH AS CEMETERIES FAMILY BURIAL GROUNDS 7DXIC OR GRA PHI C SCALE 50' RIPARIAN BUFFER BEGINS AT EDGE 2SVE- Two STORY DWELLING HAZARDOUS WASTE MAIER/ALSIVIES RE7ZANDS FLOOD HAZARD AREAS ETD., OR ANY THING ELSE THAT IN THE R£S7R1C71V£ IN ` v IcNS MAY BE COVENANTS ALSO AS USED THE SURVETLIRS GERRRCAROV HEREON, THE RDIRD CERRFY MEANS 70 STATE OR DECLARE O DRIVE A PROFESSIONAL OPINION O CORORONS REGITARDING THOSE FACTS OR RAVINGS RHIO/ ARC THE SUB.ECT OF THE CERORCARON AND DOES NOT CONS777WE A WARRANTY OR GUARANTEE; /MPG/EV. THE MAP OR PLAT HEREON USE EXPRESS AREA BY COORDINATE METHOD ��/ A KIND SHALL NOT BE USED M/7H AN AFRDANT OR LE7)ER Or ANY K /NO FOR REUSE C �� INCLUDIND BUT NOT UMI7ED TO, FUTURE LOAN CLOSINGS PLOT PLANS `+7 R1� CON57RUC770M, LANDSCAPING, PERAR /TANG ETC, IT IS A KOLA 770N OF THE FEDERAL COP74R/GHT ACT TO COPY OR MODIFY AND REUSE 7HIS SURVEY BEYOND J THE DATE AND SCOPE NOTED ON THE MAP "MY BARBOIR SURVEYING, PA., /IS ASSOCIATES. AND /OR AGENTS SHALL NOT BE LIABLE FOR USE OF THIS SURVEY BY ANY OTHER ENRRES OR PERSONS FOR ANY PURPOSE BEYOND THE DATE AND SCOPE AS N07ED ON THIS MAP OR PLAT m V/C /LAITY MAP (NOT TO SCALE) -_ CUR VF DA TA TA RI F S 0�� EIP l SSMH / B,� C� cry / h O Z EIP DRAINAGE EASEMENT SCALED FROM BM 1994, PG 322 12 22, 316 0.512 Q � 'sp 00, SF l �z AC l � m /0 /v Ve SCOp /oQ �/ lCV 4 �3 CONC 2 t SL �S 0 _ o s �N J �v r It l SMNG I < / SET C1 011, °� 3 EIP R=504.95 THIS WAS ISSUED AND ,SEALED BY JNMY C. SARBOUR, PLS, UCENS F A= 183.02 CH= 182.01 CB= S70 02'14 '- Ac 1ps . oo,8ss 0 E/P 1 l rw� oL 6e } � II IMPERVIOUS CALCULAAONS HOUSE -1048 SF INCLUDES PORCH, STEPS CONCRE7F 4J6 SF INCLUDES SIDEWALK, DRIVEWAY TOTAL IMPERVIOUS AREA -1484 SF PERCENTAGE OF IMPERVIOUS AREA -6.65% NOTE. DOCUMENT OR/GNALLY 011, °� 3 EIP LEGEND THIS WAS ISSUED AND ,SEALED BY JNMY C. SARBOUR, PLS, UCENS F /fin D / )PS-IRON PIPE SET EIP- £XIS77NG IRON PIPE FOUND NUMBER L -2855, ONS- 29-12 REV. 8 -2h12 THIS MEDIUM SHALL NOT BE CONSIDERED A CER77RED DOCUMENT. THE ORIGINAL STGVED AND SEALED C/ I Wbf -WATER METER 7P- TELEPHONE PEDESTAL DOCUMENT IS ON FILE AT THE OFF7CE OF XAWY \ �G \ SSMH- SANITARY SEWER MANHOLE BARBOUR SURVEYTNa P. A. 213 SOUTH SECOND �� I SCO -SEWER CLEANOUT STREET, SMITHFIELD, NORTH CAROUNA 27577. JIMMY C. BARBOUR c-J709 21J South Second Street P. O. eox z6 SM/�nLqD NC 27577 919 989 -6542 PHONE 919 989 -6643 FAX ICV- IRRIGA77ON CONTROL VALVE CALE 1 ° -40 NO 7F.- WM -WATER METER REVISED 8 -24 -2012 BRANCH WAS DETERMINED TO BE CTV -CABLE TV PEDESTAL ADDED 50' RIPARIAN BUFFER A 50" RIPARIAN BUFFER BY LAUREN EB- ELECTRICAL TRANSFORMER BOX WITHERSPOON WITH THE NC DEPT. R/W- -RIGHT OF WAY OF WATER OUALITY 919 791 -4251 AC -ACRE SF- SOUARE FEET GRA PHI C SCALE 50' RIPARIAN BUFFER BEGINS AT EDGE 2SVE- Two STORY DWELLING OF TOP OF BANK. with VINYL SIDING 0 20 40 80 STREET ADDRESS. BM -BOOK OF MAPS 4920 B/VENS DRIVE BOOK PG -PAGE RALEIGH, NC 27616 AREA BY COORDINATE METHOD SURREY FOR' tote of North Carolina, JOHNSTON County certify that this mop was drown under pe supervision From on actual survey made under my supervision (deed ascription recorded in Deed Book9740 Page 1900 ar ther referenced source BM 1994, PG 1688,-that the ratio f precision or positional accuracy is I.-10,000+ and hat this map meets the requirements of THE ✓B 9740, PG 1900 �� //s ' or /�' e/ //� / D�L.�O/ // /AH ����� ty PARCEL /D NO 1737008218 URVEYED BY RM LOT 12 REMINGTON PARK PHASE 1 AS RECORDED IN BOOK of MAPS 1994, PAGE 1688 FIELD BOOK 137 TANDARDS of PRACTICE for LAND SURVEYING in North orolina (21 NCAC 56. 1600) Th1s297H day of MAY 2012. IC DA TE 5 -17 -2012 NEUSE T� WAKE COUNTY NC RAWN BY CSS � R P ° JIMMY C. BARBOUR c-J709 21J South Second Street P. O. eox z6 SM/�nLqD NC 27577 919 989 -6542 PHONE 919 989 -6643 FAX _ CALE 1 ° -40 mmy C. Barbour, Professional Land Surveyor Number 2855 WG NO. 12 -070