Loading...
HomeMy WebLinkAbout20120774 Ver 1_Comment Memo Mit Plan Review_20120824REPLY TO .ATTENTION OF DEPARTMENT OF THE ARMY WILMINGTON DISTRICT, CORPS OF ENGINEERS 69 DARLINGTON AVENUE WILMINGTON, NORTH CAROLINA 28403 -1343 CESAW- RG /Crumbley August 24, 2012 SUBJECT: NCIRT Comments During 30 -day Mitigation Plan Review Purpose: The comments listed below were posted to the NCEEP Mitigation Plan Review Portal during the 30 -day comment period in accordance with Section 332.8(8) of the 2008 Mitigation Rule. NCEEP Project Name: Jacobs Ladder Stream Mitigation Site (EEP -IMS# 95023), Rowan County, NC USACE AID #: SAW 2012 -01007 30 -Day Comment Deadline: August 23, 2012 1. 8/22/2012- N.C. Division of Water Quality; Eric Kulz: No comments or concerns regarding this property, pending a site visit by DWQ (Alan Johnson - MRO), along with a visit to Jacob's Landing. 2. 8/23/2012- U.S. Environmental Protection Agency; Jeffrey Garnett: I would like to reiterate comments that I made on the Jacob's Landing bank: The plan calls for some reconstructed culverted crossings. I request that the Provider submit detailed plans of culvert installations that adequately ensure that passage for aquatic life is achievable. Additionally, one of the goals of the project is to "reduce the sediment supply entering Irish Buffalo Creek." Monitoring channel forms over the first five years of the bank only serves as a surrogate that sediment loads are decreasing. The assumption is being made that improving the channel will reduce sediment loads, but no quantifiable way to test this is being presented. The Provider should develop a quantifiable plan to directly measure success of the project goal. For example, simple turbidity measurements could be taken on a regular basis (during base flows and bank full events) both upstream and downstream of the site. These measurements should be taken before restoration, during restoration, and for a minimum of five years post - restoration in order to document achievement of the goal. 3. 8/23/2012 -U.S. Army Corps of Engineers; Tyler Crumbley and Todd Tugwell: a. Please ensure that the performance standards for channel dimension [(as described in Sections 9 and 10 of the document (pgs. 35 -38)], are in accordance with the 2003 Stream Mitigation Guidelines (1 cross - section per 20 bankfull width lengths) and that the performance standard for Bed Materials is instituted to show a change to a pre- determined desired composition, rather than purely an evaluation of sediment transport. b. Section 9.0, pg. 35 reads: "The purpose of monitoring..." please change to "The purpose of geomorphological monitoring ..." c. Section 9.0, pg. 36, vegetation: Please add "planted, living stems per acre." Also, please remove the year 4 performance standard of 288 stems per acre. d. Site Plan and Profile, (sheet 11 of 23), Sta. 119 +25: A 50' crossing is proposed. Please ensure that all crossings on the project are wide enough to allow for future planned uses on the property, including any municipal or DOT mandated road widths, if anticipated.