Loading...
HomeMy WebLinkAbout20201981 Ver 1_External_ SAW-2013-01037_20210217 Carpenter,Kristi From:Bailey, David E CIV USARMY CESAW (USA) <David.E.Bailey2@usace.army.mil> Sent:Wednesday, February 17, 2021 4:16 PM To:Parker, Jerry A; Wanucha, Dave Cc:Carpenter,Kristi; Archer III, Wright Subject:\[External\] SAW-2013-01037 (NCDOT Div. 7 / B-5346, Bridge 3 / SR 1529 / Dry Creek / Durham Street Ext. / Alamance County) Attachments:2017NWP03.pdf Follow Up Flag:Follow up Flag Status:Flagged CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. All, Although the PCN for the above referenced project (dated 1/22/2021) requested the use of NWP 14, based on the PCN and plans the above referenced bridge replacement project is authorized under Nationwide Permit 3 and does not require notification. Based on my conversation with Jerry Parker this afternoon, NCDOT is amenable to using NWP 3 non-reporting for this project instead of NWP 14. Please note that the project must be accomplished in strict accordance with the attached conditions and your submitted description, and any violation of the attached conditions or deviation from your submitted description may subject the permittee to a stop work order, a restoration order and/or appropriate legal action. Attached is a copy of the NWP 3 and the applicable permit conditions. The Action Identification Number for this project is SAW-2013-01037. Note that NCDOT is still responsible for the following conditions pertaining to the Northern long-eared bat as this project occurs in NCDOT Divisions 1-8: The U.S. Fish and Wildlife Service’s (USFWS’s) Programmatic Biological Opinion (PBO) titled, “NCDOT Program Effects on the Northern Long-eared Bat in Divisions 1-8”, dated November 6, 2020, contains agreed upon conservation measures for the NLEB. As noted in the PBO, applicability of these conservation measures varies depending on the location of the project. Your authorization under this Department of the Army permit is conditional upon your compliance with all applicable agreed upon conservation measures in the PBO, which are incorporated by reference in this permit. Failure to comply with the applicable these conservation measures would constitute non-compliance with your Department of the Army permit. The USFWS is the appropriate authority to determine compliance with the terms and conditions of its PBO, and with the ESA." Please let me know if you have any questions regarding the above information. Sincerely, Dave Bailey --- David E. Bailey, PWS Regulatory Project Manager US Army Corps of Engineers 1 CE-SAW-RG-R 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 Phone: (919) 554-4884, Ext. 30. Fax: (919) 562-0421 Email: David.E.Bailey2@usace.army.mil We would appreciate your feedback on how we are performing our duties. Our automated Customer Service Survey is located at: http://corpsmapu.usace.army.mil/cm_apex/f?p=136:4:0 Thank you for taking the time to visit this site and complete the survey. 2