Loading...
HomeMy WebLinkAbout20210331 Ver 1_PreFiling Email 30-Day Clock Reached Email_20210315Strickland, Bev From: laserfiche@ncdenr.gov Sent: Monday, March 15, 2021 12:02 AM To: tgulley@gmail.com Cc: Mairs, Robb L Subject: Pre -Filing Time Clock has been reached for Highland Forest Townhomes - 20210331 Ver 1 Attachments: DWR Pre -Filing Meeting Request Form.pdf The North Carolina Division of Water Resources has received the Pre -Filing Meeting Request Form for Highland Forest Townhomes that you submitted on 2/12/2021. The ID number for that project is 20210331, Version 1. Your Pre -Filing Meeting Request has now reached the 30 calendar days' requirement and your application can now be accepted. When you submit your application please upload a copy of the attached document in this email. This email was automatically generated by Laserfiche workflow. Please do not respond to this email address, as responses are not monitored ID#* 20210331 Version* 1 Regional Office* Wilmington Regional Office - (910) 796-7215 Reviewer List* Robb Mairs Pre -Filing Meeting Request submitted 2/12/2021 Contact Name * Contact Email Address* Project Name* Project Owner* Project County* Owner Address: Tom Gulley tgulley@gmail.com Highland Forest Townhomes Shallotte Property Holdings, LLC - Bobby Harrelson Brunswick Street Address 115 N 3rd St, STE 300 Address Line 2 aty Wilmington Fbstal / Zip Code 28401 Is this a transportation project?* r Yes r No State / Province / Region NC Country USA Type(s) of approval sought from the DWR: W 401 Water Quality Certification - F- 401 Water Quality Certification - Regular Express r- Individual Permit r- Modification r- Shoreline Stabilization Does this project have an existing project ID#?* r Yes r No Do you know the name of the staff member you would like to request a meeting with? Robb Mairs Please give a brief project description below. Requesting 0.12 acres of 404-wetland fill for the construction of townhomes off Frontage Road in Brunswick County. The proposed townhomes will be located off Highlands Glen Drive and Stirling Drive, which are existing and an extension of Stirling Drive. The requested fill is for the construction of the buildings and 10' beyond the side and rears of the buildings to allow access around the buildings and the placement of the mechanical units and other items required for the buildings. This impact has also been minimized by the use of a retaining wall to reduce the total footprint of the wetland fill. Compensatory mitigation is proposed with the purchase of 0.30 acres of credits from the Stone Farm Mitigation Bank. Some maps for this project are attached. There is an approved JD for this project, SAW- 2017-01371, which expires on Sept. 19, 2022. Please give a couple of dates you are available for a meeting. 2/15/2021 2/18/2021 2/19/2021 Please attach the documentation you would like to have the meeting about. Frontage Road PCN Docs.pdf 8.88MB pdf only By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: • This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. • I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing meeting request. • I also understand that DWR is not required to respond or grant the meeting request. Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an application. Signature J TKO Submittal Date 2/12/2021