Loading...
HomeMy WebLinkAbout20210330 Ver 1_PreFiling Email 30-Day Clock Reached Email_20210315Strickland, Bev From: laserfiche@ncdenr.gov Sent: Monday, March 15, 2021 12:01 AM To: DavidLGaines2@gmaiI.com Cc: Turlington, Chad Subject: Pre -Filing Time Clock has been reached for Gaines Property Seawall Replacement - 20210330 Ver 1 Attachments: DWR Pre -Filing Meeting Request Form.pdf The North Carolina Division of Water Resources has received the Pre -Filing Meeting Request Form for Gaines Property Seawall Replacement that you submitted on 2/12/2021. The I D number for that project is 20210330, Version 1. Your Pre -Filing Meeting Request has now reached the 30 calendar days' requirement and your application can now be accepted. When you submit your application please upload a copy of the attached document in this email. This email was automatically generated by Laserfiche workflow. Please do not respond to this email address, as responses are not monitored ID#* 20210330 Version* 1 Regional Office* Fayetteville Regional Office - (910) 433-3300 Reviewer List* Chad Turlington Pre -Filing Meeting Request submitted 2/12/2021 Contact Name * David L Gaines Contact Email Address* DavidLGaines2@gmaiI.com Project Name* Gaines Property Seawall Replacement Project Owner* David L Gaines and Terry H Gaines Project County* Montgomery Owner Address: Street Address 14835 Resolves Ln Address Line 2 aty State / Frovince / Region Charlotte NC Rbstal / Zip Code Country 28277 United States Is this a transportation project?* r Yes r No Type(s) of approval sought from the DWR: r- 401 Water Quality Certification - F- 401 Water Quality Certification - Regular Express r- Individual Permit r- Modification W Shoreline Stabilization Does this project have an existing project ID#?* r Yes r No Do you know the name of the staff member you would like to request a meeting with? Chad Turlington Please give a brief project description below. Requesting permission to replace an existing 255 foot pressure - treated seawall that has suffered damage from increased wave/wake pressure and normal aging. Contractor has proposed placing a new seawall of same size, constructed of pressure -treated lumber, just in front of existing seawall. Rip -rap will be added only if required by Duke Energy guidelines (I have not yet been able to confirm existing requirements, if any, with Duke Energy). No excavation will be required, other than driving in support posts. There is no vegetation along the waterfront. No trees or other vegetation within 50 feet landward should be disturbed. There is an existing stone pathway on the property that will provide access to the work area. Property is located at 147 Lakeland Circle, Mt. Gilead, NC 27306. Latitude 35.237690, longitude-80.078600. Please give a couple of dates you are available for a meeting. 2/16/2021 2/17/2021 2/18/2021 2/19/2021 Please attach the documentation you would like to have the meeting about. NC DWR Pre -Filing Materials - Gaines Property 555.18KB Seawall Replacement.pdf pdf only By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: • This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. • I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing meeting request. • I also understand that DWR is not required to respond or grant the meeting request. Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an application. Signature Submittal Date 2/12/2021