Loading...
HomeMy WebLinkAbout20120723 Ver 1_More Info Received_20120822Homewood, Sue From: Thomas, John T JR SAW [ John .T.Thomas.JR @usace. army. mi1] Sent: Wednesday, August 22, 2012 3:35 PM To: Homewood, Sue Subject: FW: Village Point Lake Greenway (UNCLASSIFIED) Attachments: CLEMMONS PCN rev page 5_21Aug12.pdf; Wetland Impacts_21Aug12.pdf; Wetland Temporary Impacts.pdf Classification: UNCLASSIFIED Caveats: NONE Sue See attachment updates to Clemmons' Village Point Lake Greenway project. I have not reviewed the attachments yet; however, if they have complied with what I recommended then I will be moving forward with a nwp verification. Village Point is the old Reynolds Lake we verified a dam repair and forebay construction a few years back. I think 7ewell Engineering was the agent for that project. •II I•u. - - - -- Original Message---- - From: Chris Brown [mailto:chris .brown @mcgillengineers.com] Sent: Wednesday, August 22, 2012 3:23 PM To: Thomas, john T 7R SAW Cc: mike.norris @mcgillengineers.com Subject: Village Point Lake Greenway Dear Mr. Thomas, Based on our previous telephone conference last week, we have revised our design for the Village of Clemmons' Greenway Project to further avoid wetland impacts as you suggested. We have extended the proposed boardwalk on the east side steam crossing of the lake to reduce the wetland impact. Please see attached documents. This reduction result is .035 acres of impacted area for this greenway project. The impact plus the previous wetland impact for the forebay construction of 0.63 acres results in a total overall permanent impact of .098 acres. I am also now including temporary impacts for extending our access for construction at the pipe impact area. These two minimal impact areas will be fully restored back to their original state once the temporary access for construction is no longer needed. I am attaching page 5 of the PCN which has been changed to designate the revised impacts. Please let us know what else you may need from us. if you would like. Thank -you for your time. Christine D. Brown, CPSWQ, CPESC 1 We can also send hard copies in the mail Senior Engineering Technician McGill Associates, P.A. 1240 19th Street, Lane NW I Hickory, NC 28601 Phone: 828.328.2024 1 Fax: 828.328.3870 Email: chris.brown(@mcgillengineers.com < mailto: chris .brown(@mcgillengineers.com> Website: www.mcgillengineers.com < http : / /www.mcgillengineers.com /> Classification: UNCLASSIFIED Caveats: NONE 2 C. Proposed Impacts Inventory 1. Impacts Summary 1 a. Which sections were completed below for your project (check all that apply): ® Wetlands ® Streams - tributaries ❑ Buffers ❑ Open Waters ❑ Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. 2b. 2c. 2d. 2e. 2f. Wetland impact Type of jurisdiction number — Type of impact Type of wetland Forested (Corps - 404, 10 Area of impact Permanent (P) or (if known) DWQ — non -404, other) (acres) Temporary T W1 ®P ❑ T 10' wide asphalt ❑ Yes ® Corps .0008 greenway ® No ❑ DWQ W2 ® P ❑ T 10' wide asphalt ❑ Yes ® Corps .015 greenway ® No ❑ DWQ W3 ®P ❑ T 10' wide asphalt ❑ Yes ® Corps greenway ® No ❑ DWQ .012 W4 ® P ❑ T 10' wide asphalt ❑ Yes ® Corps .007 greenway ® No ❑ DWQ W5 ❑ P ®T Temp construction ❑ Yes ® Corps crossing ® No ❑ DWQ .0005 W6 ❑ P ® T Temp construction El Yes ® Corps crossing ® No ❑ DWQ .0056 2g. Total wetland impacts .041 2h. Comments: Total permanent impacts = .035 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. 3b. 3c. 3d. 3e. 3f. 3g. Stream impact Type of impact Stream name Perennial Type of jurisdiction Average Impact number - (PER) or (Corps - 404, 10 stream length Permanent (P) or intermittent DWQ — non -404, width (linear Temporary (T) (INT)? other) (feet) feet) S1 ❑ P ®T pipe for temporary unnamed ® PER ® Corps unknown 10' road crossing ❑ INT ® DWQ S2 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S3 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S4 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S5 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S6 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ 3h. Total stream and tributary impacts 10' 3i. Comments: Page 5 of 11 PCN Form — Version 1.3 December 10, 2008 Version 1 -w J3 , 11 C� mf3 LLI � II II I h" Lo LO m Lo E. w .� 7 �o \ Zv .. C%4 m 0 7 � C%4 m C%4 w 1 -w J3 , 11 C� mf3 LLI � II II I h" Lo LO m Lo E. w .� 7 �o \ Zv 7 � w ti�/ C%4 s. CO s.�