HomeMy WebLinkAbout20120781 Ver 1_Comments to CAMA_20120817Beverly Eaves Perdue Braxton C. Davis Dee Freeman
Governor Director Secretary
TO: Mrs. Amy Adams
Division of Water Quality
1vIEMORANDUM AUG 15 2012
FROM: Doug Huggett Respond to Doug Huggett
Major Permits Processing Coordinator Morehead City Office
Coastal Management Division
400 Commerce Avenue
Morehead City NC 28557
DATE: 14 August 2012
SUBJECT: CAMA Application Review
APPLICANT: Harry T. Phelps & Shirley C. Phelps
PROJECT LOCATION: Project site is located at 234 Albemarle Shores Extension (off SR 1237) near
Columbia, adjacent a man -made U- shaped basin connected to Albemarle Sound in Tyrrell County, North
Carolina.
PROPOSED PROJECT: Applicant proposes to conduct new channel & canal entrance excavation in
order to deepen the existing, eroded shallow water connection to an existing man-made U- shaped basin,
and construct a bulkhead, boat ramp, two boat lifts, and a building with a lean to within & adjacent to the
basin, respectively.
Please indicate below your position or viewpoint on the proposed project and return this form by 3
September 2012. Please contact Kim Hedrick at 252- 948 -3936, if you have any questions regarding the
proposed project. When appropriate, in depth comments with supporting data are requested.
REPLY �� This office has no objection to the project as proposed.
This office has no comment on the proposed project.
This office approves of the proposed project only if the recommended changes
are incorporated. See attached.
This office objects to the proposed project for reasons described in the attached