Loading...
HomeMy WebLinkAboutNCC200952_NOT Closeout Documents_20210312North Carolina Department of Environmental Quality Land Resources: Systel Building, 225 Green Street, Suite 714, Fayetteville, NC 28301-5094 (910) 433-3300 County: Cumberland Project: Greystone Farms, Lot 194 Person financially responsible: Loyd Builders of Fayetteville — F.Royal Loyd, Owner Address: 4140 Ferncreek Drive, Suite 101, Fayetteville, NC 1. Project Location: Touchstone Drive, Fayetteville Pictures: No 2. Weather and soil conditions: sunny, workable soils 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A. and rules? Yes 5. Violations: River basin: Cape Fear Project #: CUMBE-2020-131 COC: NCC200952 Initial inspection: No If no, check violations below: 6. Is the site in compliance with NPDES Permit NCGO10000 Construction Stormwater requirements? Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply) Degree of damage: 8. Contact made with (name): Inspection report: Sent Report 9. Corrective action needed: 10. Comments: Title: Date given/sent: March 11, 2021 Permanent ground cover sufficient to restrain erosion has been established. No additional self -monitoring or self -inspections are required. Project is in compliance and released under the SPCA. Termination of coverage under the NPDES General Stormwater Permit for Construction Activities (NCGO1) must be requested by the permittee via a Notice of Termination (NOT). The NOT is available at: https://edocs.deq.nc.gov/Forms/NCG01-Termination. Please note that this correspondence must be uploaded as part of completing the NOT process. Reported by: Lori Britt Others present: Date of inspection: March 05, 2021 Time arriving on site: 3:31 PM Time leaving site: 3:35 PM cc: Yes