Loading...
HomeMy WebLinkAbout20210564 Ver 1_CAMA Application_20210304NORTH CAROLINA Environmental Qualitr March 4,2021 MEMORANDUM: FROM: SUBJECT: Applicant: Project Location: Proposed Project ROY COOPER Governor MICHAEL S. REGAN Secretary BRAXTON DAVIS Director, Division of Coastal Management Gregg Bodnar, Assistant Major Permits Coordinator NCDEQ - Division of Coastal Management 400 Commerce Ave., Morehead City, NC 28557 Fax: 252-247-3330 (Courier 04-16-33) gregg.bodnar Wricdenr.gov CAMA Major Permit Application Review Ferry View Partners, LLC. on Irvin Garrish Highway adjacent to the Ocracoke Ferry Dock in Silver Lace on Ocracoke The applicant proposes install 3 new mooring piles in existing slips in existing Marina. Please indicate below your agency's position or viewpoint on the proposed project and return this form to Grep_p Bodnar at the address above by March 24,2021. If you have any questions regarding the proposed project, contact Shane Staples (252)948-3950 when appropriate, in-depth comments with supporting data is requested. REPLY: This agency has no objection to the project as proposed. **Additional comments may be attached** This agency has no comment on the proposed project. PRINT NAME AGENCY SIGNATURE DATE This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. State of North Carolina I Environmental Quality I Coastal Management 400 Commerce Ave. Morehead City, NC 28557 (252) 808-2808 March 4,2021 MEMORANDUM: FROM: SUBJECT: Applicant: Project Location: Proposed Project: ROY COOPER u, . MICHAEL S. REGAN .Saere,m'v BRAXTON DAVIS Dirrolar. pirisinn../(oc,tnl A'lnnagesten, Gregg Bodnar, Assistant Major Permits Coordinator NCDEQ - Division of Coastal Management 400 Commerce Ave., Morehead City, NC 28557 Fax: 252-247-3330 (Courier 04-16-33) QreQQ. bodnar(o)ncdenr.gov CAMA Major Permit Application Review Ferry View Partners, LLC. on Irvin Garrish Highway adjacent to the Ocracoke Ferry Dock in Silver Lace on Ocracoke The applicant proposes install 3 new mooring piles in existing slips in existing Marina. Please indicate below your agency's position or viewpoint on the proposed project and return this form to Grego Bodnar at the address above by March 24,2021. If you have any questions regarding the proposed project, contact Shane Staples (252)948-3950 when appropriate, in-depth comments with supporting data is requested. REPLY: This agency has no objection to the project as proposed. "Additional comments may be attached" This agency has no comment on the proposed project. PRINT NAME AGENCY SIGNATURE DATE This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. State of North Carolina I Environmental Quality I Coastal Management 400 Cononeme Are. Morehead Cit), NC 28557 (252) 808-2808 DIVISION OF COASTAL MANAGEMENT FIELD INVESTIGATION REPORT 1. APPLICANT'S NAME: Ferry View Partners, LLC 2. LOCATION OF PROJECT SITE: Project site is located on Irvin Garrish Highway adjacent to the Ocracoke Ferry Dock in Silver Lake on Ocracoke. GPS Coordinates: Latitude — 35' 06' 54" Longitude — 75' 59' 06" 3. INVESTIGATION TYPE: CAMA 4. INVESTIGATIVE PROCEDURE: Dates of Site Visit —January 13, 2021 Was Applicant Present - No 5. PROCESSING PROCEDURE: Application Received Complete — February 19, 2021 Office - Washington 6. SITE DESCRIPTION: (A) Local Land Use Plan - Hyde County Land Classification from LUP - Community (B) AEC(s) Involved: Estuarine Water, Public Trust Area (D) Water Dependent: Yes (D) Intended Use: Private Residential (E) Wastewater Treatment: N/A (F) Type of Structures: I 1-Slip Docking Facility (G) Estimated Annual Rate of Erosion: None 7. HABITAT DESCRIPTION: [AREA] DREDGED FILLED OTHER (A) Vegetated Wetlands (B) Non -Vegetated Wetlands (Silver Lake Bottom) 3ftz (C) Uplands (D) Total Area Disturbed: 3ft2 (E) Primary Nursery Area: No (F) Water Classification: SC Open: No 8. PROJECT SUMMARY: The applicant proposes install 3 new mooring piles in existing slips in an existing Marina. Ferry View Partners, LLC Additional Mooring Pilings Hyde County Proiect Settin The subject property is located at 58 Water Plant Road on Ocracoke Island in Hyde County. The docking facility for the private development is located east of the reserve ferry slip at the Ocracoke Ferry Terminal in Silver Lake along Irvin Garrish Highway. Existing shoreline development includes an 1 I -slip marina that services a residential community. Being next to the Ocracoke Ferry Dock the slips in the marina are subject to heavy prop wash and current that occurs due to the activities of the NCDOT ferries. Silver lake is designated is classified as SC, NSW by the Environmental Resources Commission. Proiect Description The applicant is proposing to install 3 new mooring piles at the terminal end of the existing docking facility. The new pilings are to be installed 14 feet waterward of existing pilings in Slip 1 and Slip 2(see drawing). The purpose of the new pilings is to provide more secure mooring for vessels up to 50 feet in length. The new pilings will not result in new slips, will not exceed the current pier head line and will not be within the 15-foot riparian setback of either adjacent property. Anticipated Impacts The project as proposed would have bottom impacts limited to the placement of the three pilings and the marina footprint would expand by 5602. Temporary impacts would include noise and turbidity resulting from the driving of pilings. Shane Staples — February 26, 2021 Ferry View Partners, LLC CAMA Permit Project Narrative 12/1 /20 Project Scope: Add three pilings as depicted in Attachment 1 "Proposed". Pilings will be added to the slips on the end of the dock, labeled in Attachment 1 as slips 1 & 2. These pilings will be used as additional tie pilings to better secure vessels while in the slip. Pilings will be approximately 12" diameter, 29' long, and protrude +-9' above NWL. No additional slips will be created during this project. Project Timeline: Construction should take no more than 1 day. Construction will begin following permit approval. ON MP-1 APPLICATION for Major Development Perm (last revised 12127106) it North Carolina DIVISION OF COASTAL MANAGEMENT RECEIVED FEB 19 2021 DCII4_W,4RO 252.808-2808 :: 1.888-4RCOAST :: www.necoastaimanagement.net Form DCM MP-1 (Page 2 of 6) APPLICATION for Maior DevelODment Permit 1. Primary Applicant/ Landowner Information Business Name Project Name (if applicable) Ferry View Partners, LLC Applicant 1: First Name MI Last Name Robert C Orr Applicant 2: First Name MI Last Name If additional applicants, please attach an additional pages) with names listed. Mailing Address PO Box city Slate PO Box 1373 Ocracoke NC ZIP Country Phone No. FAX No. 27960 USA 910 - 612 - 6673 ext. - - Street Address (if different from above) City State ZIP 68 Water Plant Rd Ocracoke NC - - 27960 Email info@theberkleymanor.com 2. Agent/ContractorInformation Business Name Agent/ Contractor 1: First Name Robert Orr- Same info as above MI Last Name Agent/ Contractor 2: First Name MI Last Name Mailing Address PO Box City l State ZIP Phone No. 1 - - ext. Phone No. 2 - - ext. FAX No. Contractor It Street Address (if different from above) City State ZIP Email <Form continues on back> RECEIVED FEB 19 2021 DCM-WAR® Form DCM MP-1 (Page 3 of 6) APPLICATION for Major Development Permit 3. Project Location County (can be multiple) Street Address State Rd. # Hyde N/A- Docks on Irving garish highway, across from Berkley Manor Subdivision Name City State Zip Berkley Club Ocracoke NC - 27960 Phone No. Lot No.(s) (if many, attach additional page with list) ext. I I I , a. In which NC river basin is the project located? b. Name of body of water nearest to proposed project Sliver Lake, Ocracoke Harbor, Pamlico Sound c. Is the water body identified in (b) above, natural or manmade? d. Name the closest major water body to the proposed project site. Natural Manmade Unknown Some of both Pamlico Sound e. Is proposed work within city limits or planning jurisdiction? f. If applicable, list the planning jurisdiction or city limit the Hyde County planning proposed work falls within. 4. Site Description a. Total length of shoreline on the tract (ft.) b. Size of entire tract (sq.ft.) 160 5000 c. Size of individual lots) d. Approximate elevation of tract above NHW (normal high water) or N W L (normal water level) (If many lot sizes, please attach additional page with a list) NHW or NWL e. Vegetation on tract Grass, cedars f. Man-made features and uses now on tract Bulkhead, 11 slip boat dock, gazebo roof over small part of dock. g. Identify and describe the existing land uses adjacent to the proposed project site. Emergency Ferry Repair Slip West Side Private dock on East side h. How does local government zone the tract? i. Is the proposed project consistent with the applicable zoning? (Attach zoning compliance certificate, if applicable) Commercial/Residential Yes j. Is the proposed activity part of an urban waterfront redevelopment proposal? No k. Has a professional archaeological assessment been done for the tract? If yes, attach a copy. Not that I'm aware of I. Is the proposed project located in a National Registered Historic District or does it involve a No National Register listed or eligible property? RECEIVED <Form continues on next page> FEB 19 2021 DCM-WARD Form DCM MP-1 (Page 4 of 6) APPLICATION for Major Development Permit m. (1) Are there wetlands on the site? No (ii) Are there coastal wetlands on the site? No (Ili) If yes to either (i) or (ii) above, has a delineation been conducted? Yes No (Attach documentation, if available) n. Describe existing wastewater treatment facilities. N/A o. Describe existing drinking water supply source. Town Water p. Describe existing storm water management or treatment systems. N/A 5. Activities and Impacts a. Will the project be for commercial, public, or private use? Zoned Commercial/Residential Private/Community b. Give a brief description of purpose, use, and daily operations of the project when complete. Boat slips as a part of the Berkley Club subdivision c. Describe the proposed construction methodology, types of construction equipment to be used during construction, the number of each type of equipment and where it is to be stored. Drive/jet pilings - 1 Small barge will be used. Will be slipped at current dock d. List all development activities you propose. Insert three additional pilings on end slips e. Are the proposed activities maintenance of an existing project, new work, or both? Both f. What is the approximate total disturbed land area resulting from the proposed project? N/A Sq.Ft or Acres g. Will the proposed project encroach on any public easement, public accessway or other area that the public has established use of? No h. Describe location and type of existing and proposed discharges to waters of the state. N/A I. Will wastewater or stormwater be discharged into a wetland? NO Yes No NA If yes, will this discharged water be of the same salinity as the receiving water? Yes No NA j. Is there any mitigation proposed? NO Yes No NA If yes, attach a mitigation proposal. RECEIVED <Form continues on back> FEB 19 2021 DCM-WARO Form DCM MP-1 (Page 5 of 6) APPLICATION for Major Development Permit 6. Additional Information In addition to this completed application form, (MP-1) the following Items below, if applicable, must be submitted in order for the application package to be complete. Items (a) — (I) are always applicable to any major development application. Please consult the application Instruction booklet on how to property prepare the required items below. a. A project narrative. b. An accurate, dated work plat (including plan view and cross -sectional drawings) drawn to scale. Please give the present status of the proposed project. Is any portion already complete? If previously authorized work, clearly indicate on maps, plats, drawings to distinguish between work completed and proposed. c. A site or location map that is sufficiently detailed to guide agency personnel unfamiliar with the area to the site. d. A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected properties. e. The appropriate application fee. Check or money order made payable to DENR. f. A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such owners have received a copy of the application and plats by certified mail. Such landowners must be advised that they have 30 days in which to submit comments on the proposed project to the Division of Coastal Management. Chip & Helena Stevens PO Box 279 Ocracoke, NC 27960 2529210408 National Park Service ATTN: Dave Hallac Cape Hatteras National Seashore 1401 National Park Dr, Manteo, NC 27954 252-475-9032 g. A list of previous state or federal permits issued for work on the project tract. Include permit numbers, permittee, and issuing dates. Major Came permit for construction of existing dock was issued to prior owner. No permit details conveyed with purchase of land. h. Signed consultant or agent authorization form, if applicable. i. Wetland delineation, if necessary. j. A signed AEC hazard notice for projects in oceanfront and inlet areas. (Must be signed by property owner) k. A statement of compliance with the N.C. Environmental Policy Act (N.C.G.S. 113A 1-10), if necessary. If the project involves expenditure of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act. 17. Certification and Permission to Enter on Land I I understand that any permit issued in response to this application will allow only the development described in the application. The project will be subject to the conditions and restrictions contained in the permit. I certify that I am authorized to grant, and do in fact grant permission to representatives of state and federal review agencies to enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up monitoring of the project. I further certify that the information provided in this application is truthful to the best of my knowledge. �+ Date 215/21 Print Name -Robert Orr �tECEIVE® Signature FEB 19 2021 Please indicate application attachments pertaining to your proposed project. DC p -W fl n O DCM MP-2 Excavation and Fill Information DCM MP-5 Bridges and Culverts l4d rv! NYs9r! Form DCM MP-1 (Page 6 of 6) APPLICATION for DCM MP-3 Upland Development DCM MP-4 Structures Information Major Development Permit RECEIVED FEB 19 2021 DCM-WARO Form DCM MP-4 STRUCTURES (Construction within Public Trust Areas) Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. RECEIVED FEB 19 2021 DCM-WAR® 252-808.2808 :: 1-888-4RCOAS7 :: www.nccoastaimanaaement.net revised: 12/27/06 1. DOCKING FACILITY/MARINA CHARACTERISTICS This section not applicable a. (i) Is the docking facility/marina: b. (I) Will the facility be open to the general public? Commercial Public/Government Private/Community Yes No c. (i) Dock(s) and/or pier(s) (if) Number (iii) Length (iv) Width (v) Floating Yes No e. (i) Are Platforms included? Yes No If yes: (ii) Number (ill) Length (iv) Width (v) Floating Yes No Note: Roofed areas are calculated from dripline dimensions. g. (1) Number of slips proposed 0 (ii) Number of slips existing 11 I. Check the proposed type of siting: Land cut and access channel Open water; dredging for basin and/or channel Open water; no dredging required Other; please describe: k. Typical boat length: 35' m. (i) Will the facility have tie pilings? Yes No (it) If yes number of tie pilings? d. (i) Are Finger Piers included? Yes No If yes: (ii) Number (ill) Length (iv) Width (v) Floating Yes No f. (1) Are Boatlifls included? Yes No If yes: (ii) Number (iii) Length (iv) Width h. Check all the types of services to be provided. Full service, including travel lift and/or rail, repair or maintenance service Dockage, fuel, and marine supplies Dockage ("wet slips") only, number of slips: 11 Dry storage; number of boats: Boat ramp(s); number of boat ramps: Other, please describe: j. Describe the typical boats to be served (e.g., open runabout, charter boats, sail boats, mixed types). Small pleasure power boats, sail boats, charter boats I. (1) Will the facility be open to the general public? Yes No 2. DOCKING FACILITY/MARINA OPERATIONS This section not applicable a. Check each of the following sanitary facilities that will be included in the proposed project. Office Toilets Toilets for patrons; Number: Location: Showers Boatholding tank pumpout; Give type and location: RECEIVED FEB 19 2021 DCM-WARO 36 b. Describe treatment type and disposal location for all sanitary wastewater. c. Describe the disposal of solid waste, fish offal and trash. d. How will overboard discharge of sewage from boats be controlled? a. (i) Give the location and number of "No Sewage Discharge" signs proposed. (if) Give the location and number of "Pumpout Available" signs proposed. f. Describe the special design, if applicable, for containing industrial type pollutants, such as paint, sandblasting waste and petroleum products. g. Where will residue from vessel maintenance be disposed oft h. Give the number of channel markers and "No Wake" signs proposed. i. Give the location of fuel -handling facilities, and describe the safety measures planned to protect area water quality. I. What will be the marina policy on overnight and live -aboard dockage? k. Describe design measures that promote boat basin flushing? I. If this project is an expansion of an existing marina, what types of services are currently provided? RECEIVED m. Is the marina/docking facility proposed within a primary or secondary nursery area? FEB Y 9 2021 Yes No n. Is the marina/docking facility proposed within or adjacent to any shellfish harvesting area? t�y� r �I Yes No 4.> CM -WARD 252-808.2808 :: 1.888.4RCOAST :: www.nccoastalmanaeement.net revised: 12/27106 46 o. Is the marina/docking facility proposed within or adjacent to coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. CW SAV SB WL None p. Is the proposed marina/docking facility located within or within close proximity to any shellfish leases? Yes No If yes, give the name and address of the leaseholder(s), and give the proximity to the lease. 3. BOATHOUSE (including covered lifts) This section not applicable a. (1) Is the boathouse structure(s): Commercial Public/Government Private/Community (it) Number (!it) Length (iv) Width Note: Roofed areas are calculated from dripline dimensions. 4. GROIN (e.g., wood, sheetpile, etc. If a rock groin, use MP-Z Excavation and Fill.) This section not applicable a. (1) Number (it) Length (iii) Width 5. BREAKWATER (e.g., wood, sheetpile, etc.) This section not applicable a. Length b. Average distance from NHW, NWL, or wetlands c. Maximum distance beyond NHW, NWL or wetlands 6, MOORING PILINGS and BUOYS This section not applicable a. Is the structure(s): b. Number Commercial Public/Government Private/Community c. Distance to be placed beyond shoreline Note: This should be measured from marsh edge, if present. e. Arc of the swing 7. GENERAL d. Description of buoy (color, inscription, size, anchor, etc.) RECEIVED FEB 19 2021 DCM-WARO 282-808-2808 :: 1.888.4RCOAST :: vvvvw.nccoastalmanaaement.net revised: 12127106 56 a. Proximity of structure(s) to adjacent riparian property lines Existing Dock is approximately 25' from Stevens 8 18' from national seashore. Proposed pilings will. Be further from property lines than existing dock. Note: For buoy or mooring piling, use arc of swing including length of vessel. c. Width of water body Silver Lake, Ocracoke e. (1) Will navigational aids be required as a result of the project? Yes No NA (it) If yes, explain what type and how they will be implemented. b. Proximity of structure(s) to adjacent docking facilities. Closest new piling to Stevens dock approximately 30' Closest new piling to Cape Hatteras national seashore dock approximately 37' d. Water depth at waterward end of structure at NLW or NWL 10, 8. OTHER This section not applicable a. Give complete description: RECEIVED FEB 19 2021 DCM-WARO 252-808-2808 :: 1-888-4RCOAST :: www.nccoastalmanaaement.net revised: 12/27/06 2/5/21 Date Berkley Dock Piling Addition Project Name Robed Orr Applicant Name E Applicant Signature RECEIVED FEB 19 2021 DCM-WARO . § ` .,-,A V� le \ \ . -x - ».<x � � 1B''. iNMillltl LF 'ON PoMN. LR Lax wr Nn R Ifie 'tl1 i IM - WIO >•1 1 iV 8 BulaAH - pleogeeg .1 �Bu uue � s YN7708Y.7 xiaov ,i.LNnOJ 38.[N — dIBSNN Ot 3X0.7tR7,70 J77 91777 .f37X8.78 WNNO WHO AHEg 7X838 _ FL yL A 1Yk11N'ENg8�5 ��a xa OH 199.R �ZwR a� � z�VI U•$ 1 ��d .n.�n•�".... FR - '�g9rvT12y� IT, `y=' ��x� v l' 5 0e204]' E l.lb 'b^hs y $L � - -.g qi a � 1•s _ mF=Ise w, P @a° g�•aa �' a E ie'e ,o WW]czz sou_ i✓ oporv°o,'a, .,� RaKSx E°• 2�E€€S<n ga£sa£ �!' �'S;' •0 ZU ooTa� \ -53 05 W 66 W' .19 1— a q 2,v H a /ti4 LI dJYA C39 .. qV` ._ lom iu„Cg 'Ei f3 O �r Oo z a V gspg�g€ /g�•; / 4%��e/•`l� Ana u •u s�'�c m s 53 xi��t £fa€�� 4 Y m d t m i t \ � Hn 0J M ,�.` t p., O ¢ be iaa � .�� _ " � e�•.a � E cva ma 'Jb� V•'e�� _ W O Z vi db q ,9 a'`P"r `\ qqL N Fb 1p11p 7e .�11E1tl eW s a P-N L'--w �°l 41 $ g ffi m 3'y a�r scl`p ^ c IVED no 1-14 FEB 1 9 241 r�ti' DCM-WARO L u u n w? o 0 N ova N rc� az N R Q Lil REC o FEB: Q CCM-WARO k ° ATTACHMENT 1 O' O 2020' Modification Legend O = Piling To Be Added All of cin wings/deplotlons are existing structure 6 V U cqz O w a J W 20� W ax rn rn �IVED 14 _. 1 9 2021