Loading...
HomeMy WebLinkAboutNCG070193_Inspection Report_20210315 }, n ROY COOPER Governor - =C� MICHAEL S.REGANn Secretary BRIAN WRENN NORTH CAROLINA Director Environmental Quality March 15, 2021 Appalachian Stone Company Inc. Attention: Daniel Ray Post Office Box 1598 Marion, North Carolina 28752 Subject: Compliance Evaluation Inspection Appalachian Stone Company- Marion Mine Permit: NCG070000 Certificate of Coverage: NCG070193 McDowell County, North Carolina Dear Mr. Ray: Enclosed please find a copy of the Compliance Evaluation Inspection Report for the inspection I conducted at the subject facility on March 3, 2021. The report should be self-explanatory; however, should you have any questions concerning this report, please do not hesitate to contact me at (828) 296-4500 or by email at Isaiah.reed@ncdenr.gov. Since Isaiah Reed, EI, CPSWQ MS4CEC Environmental Specialist Land Quality Section Enclosure: Inspection Report �FQ North Carolina Department of Environmental Quality I Divlslon of Energy,Mineral and Land Resources Asheville Regional Office 1 2090 U.S.Highway 701 Swannanoa,North Carolina 28778 um.uaxin 828.296.4500 Compliance Inspection Report Permit:NCG070193 Effective: 06/01/18 Expiration: 05/31/23 Owner: Appalachian Stone Company Inc SOC: Effective: Expiration: Facility: Appalachian Stone Company-Marion Mine County: McDowell 4582 Hwy 221 N Region: Asheville Marion NC 28752 Contact Person:Daniel Ray Title: Phone:828-286-2541 Directions to Facility: System Classifications: SWNC, Primary ORC: Certification: Phone: Secondary ORC(s): On-Site Representative(s): Related Permits: Inspection Date: 03/03/2021 Entry Time 01:OOPM Exit Time: 01:30PM Primary Inspector:Isaiah L Reed Phone: 828-296-4614 Secondary Inspector(s): j Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Stone, Clay, Glass, and Concrete Products Stormwater Discharge COC i Facility Status: ❑ Compliant Not Compliant Question Areas: Storm Water li I (See attachment summary) Page 1 of 3 permit: NCG070193 Owner-Facility:Appalachian Stone Company Inc Inspection Date: 03/03/2021 Inspection Type:Compliance Evaluation Reason for Visit: Routine Inspection Summary: Inspection Summary: On March 3, 2021 this facility was inspected for compliance. I met with Daniel Ray on site. During the inspection,the following issues were noted: 1)The Stormwater Pollution Prevention Plan on site was not complete and has not been maintained. The permittee shall immediately begin maintaining the Stormwater Pollution Prevention Plan as outlined in the NCG070000 General Permit. 2) Qualitative Monitoring has not been conducted and documented. The permittee shall immediately begin qualitative monitoring efforts as outlined in the NCGO60000 General Permit. Please give the above items your immediate attention. If you have any questions, please contact this office at(828)296-4614 C i Page 2 of 3 Permit: NCG070193 Owner-Facility:Appalachian Stone Company Inc Inspection Date: 03/03/2021 Inspection Type:Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? 0 ❑ ❑ ❑ #Does the Plan include a General Location(USGS)map? ❑ 0 ❑ ❑ #Does the Plan include a"Narrative Description of Practices"? 0 ❑ ❑ ❑ #Does the Plan include a detailed site map including outfall locations and drainage areas? 0 ❑ ❑ ❑ #Does the Plan include a list of significant spills occurring during the past 3 years? ❑ 0 ❑ ❑ #Has the facility evaluated feasible alternatives to current practices? ❑ 0 ❑ ❑ #Does the facility provide all necessary secondary containment? 0 ❑ ❑ ❑ #Does the Plan include a BMP summary? ❑ ❑ ❑ #Does the Plan include a Spill Prevention and Response Plan (SPRP)? ❑ ❑ ❑ #Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? ❑ ❑ ❑ #Does the facility provide and document Employee Training? ❑ N ❑ ❑ #Does the Plan include a list of Responsible Party(s)? 0 ❑ ❑ ❑ #Is the Plan reviewed and updated annually? ❑ 0 ❑ ❑ #Does the Plan include a Stormwater Facility Inspection Program? ❑ 0 ❑ ❑ Has the Stormwater Pollution Prevention Plan been implemented? ❑ 0 ❑ ❑ i Comment: The Stormwater Pollution Prevention Plan on site is not complete and has not been maintained. Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring semi-annually? ❑ E ❑ ❑ Comment: Qualitative Monitoring has not been conducted and documented. Permit and Outfalls Yes No NA NE #Is a copy of the Permit and the Certificate of Coverage available at the site? ❑ 0 ❑ ❑ #Were all outfalls observed during the inspection? 0 ❑ ❑ ❑ i #If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ 0 ❑ #Has the facility evaluated all illicit(non stormwater)discharges? ❑ E ❑ ❑ Comment: Page 3 of 3