August 7 2012
Email imidgettr&ncdot goy
Mr Randy W Midgett P E Resident Engineer
North Carolina Department of Transportation
1929 A North Road Street
Elizabeth City NC 27909
RE Contract C202823 WBS 33791 3 1
FHWA No BRSTP 17(41) TIP No B 4599
Bridges #1 and #2 over Knobb s Creek
US 17/158 — Pasquotank Co NC
Subject Plan for Temporary Access to the Bridge Site
Dear Mr Midgett
In order to begin the structure work on Stage 1 of Bridge B 4599 we propose the following plan
for temporary access to the bridge site
Phase 1 Access
a Place crane mats in the foot print of Stage 1 section of the new bridge as shown on
the attached sketch The access will extend from End Bent #2 to Bent 96 or as far as
the existing overhead electric lines will allow The access will be no wider than 30
feet
b Starting with Bent #6 (or where OHE lines permit) drive the H piles and build the
cap
c Upon completion of Bent #6 back up to begin work on Bent #7 The crane mats
between Bents 6 & 7 will be moved west out of the bridge footprint to the location
shown for Phase 2 access on the attached drawings
d This sequence will be continued working toward End Bent #2 until the OHE lines
have been relocated
2 Phase 2 Access
a When the overhead electric lines have been relocated move the remaining mats on
the footprint of the bridge west to the Phase 2 location adjacent to the new bridge
b Complete the bridge from Bents 6 to 11 This will include any remaining
substructure work setting concrete girders and pouring the deck from the Phase 2
Access
Mr Randy Midgett PE Resident Engineer
NCDO7
Page Two (Plan for Temporary Access to the Bi idge Site)
August 7 2012
3 Phase 3 Access
a Evaluate if remaining bridge can be constructed by continuing the crane mat access
from the north side or if a work bridge should be constructed to gain access from the
south side
b We request permission to install a work bridge across Knobb s Creek as an option to
gain access from the south side The work bridge consists of 40 foot spans supported
on pipe piles Since the work bridge spans are 160 % longer than the required 25
foot opening we request the option of leaving the work bridge in place until the
completion of Stage 1 construction
If further information is needed please do not hesitate to contact us at 434 845 0301
Sincerely
W C ENGLISH Incorporated
R Baxter Gordon PE
Project Manager
RBG /sl I
Enclosure
cc John Jordan
Job 1610
ST pG6 Ti
r
W
Wo �
t -J. w
m
z
_ � w
al I rv�
n.
w t
N Y
a iL �J m
'^
8 LL, ` Roll
m \ \
r LLI = z \
L 7
t ° w
a -
�_
\�
~I
Z
W
m
f
N
ILz� W�
a \
i \
h
a �
� 1 \
1O r \
m
�y
O
h
H
�n
N
\ Q
E4
i�
w�
a
a g
N
x
F
9
z J
w
f.a ;w
cn
O
a
-mom
a
o
X
m
yyw
3a
Ir
CD
Z
7
}
O Zoo
F-
O
N
�
LLo�
Q wmr
am v
O
2
i
Ir n
O
V Q
°
a
z mY�
o�✓�i
fO-I
C�
o
a
a W
�n
o
dr �
h
H
�n
N
\ Q
E4
i�
w�
a
a g
N
x
F
9
z
Z
Q
a
N
g
HI ml
r
Z
LLI /1 m
f
= aw 1
a
� m
~� rl
LLI z
W
�Wm t r m
Z) �\ 6
0. a
r �
m Z o
O
a�
LL
z ps
a H
U i
W
o N
z
1 w)
m
z
a
r
tiI z
m
ai
a
`
z
a��
st II o,
Q1
O
G O
1
i
a
0
`�o�o
}-'4 r`cn-
m
Ln
Q
11
i
ul M
O
tiI W
0]
X
N
F
d
ig
as
CL
�S
s
G
a
`
—R-
Z
st II o,
Q1
O
G O
=
o
a
0
`�o�o
}-'4 r`cn-
m
Ln
Q
O
7r,
O
X
N
�z4
w
Co
Z
Ln
+
"
¢
D ZKb
OUZ
H
N
1 z
w
cr HpM_
L
a
Z
e
6
LLJ
Z �Yfr
r
Q
k
6
�jWV1
W
H
(.7
15y
O
4 ,y
o
F
d
ig
as
CL
�S
s
G
z
z
Li
g 0- c _
m �
$ o I \\ w mow of
U y � Nin ff1
x�l z
O
o�gc w i a
W _ m V)
Z �
rir m
z
m
o �
b
S
9 q �
r w
--P
O I
ti
cn O a rWKt
cn U
1�
N "wv�i
N IQ Ow
a
Y CC
z F o��o
n
+
+ UZ
1 3 l5 IS 37Y1S Q CV
w
O
ANN O Z
Z om
O:Z
'�
3
'" of
O Z
M
Iv
p
w C a 0 oW"
O
7
O Q p
r
z
Li
g 0- c _
m �
$ o I \\ w mow of
U y � Nin ff1
x�l z
O
o�gc w i a
W _ m V)
Z �
rir m
z
m
o �
b
S
9 q �