Loading...
HomeMy WebLinkAboutNCG170423_Inspection Report_20210315 a`STATE aA' o.nA 9 SS ROY COOPER ' o Governor 2C MICHAEL S.REGAN a Secretary BRIAN WRENN NORTH CAROLINA Director Environmental Quality March 15, 2021 Kimberly-Clark Corporation Attention: Raymond Johnson 32 Smyth Avenue Hendersonville, North Carolina 28792 Subject: Compliance Evaluation Inspection Kimberly Clark-Berkeley Mill-Nonwovens Permit: NCG170000 Certificate of Coverage: NCG170423 Henderson County, North Carolina Dear Mr. Johnson: Enclosed please find a copy of the Compliance Evaluation Inspection Report for the inspection I conducted at the subject facility on March 11, 2021. The report should be self-explanatory; however, should you have any questions concerning this report, please do not hesitate to contact me at (828) 296-4500 or by email at Isaiah.reed@ncdenr.gov. Sin y, Isaiah Reed, EI, CPSWQ, MS4CEC Environmental Specialist Land Quality Section Enclosure: Inspection Report Q� North Carolina Department of Environmental Quality I Division of Energy,Mineral and Land Resources Asheville Regional Office 1 2090 U.S.Highway 70 1 Swannanoa,North Carolina 28778 rvoam crv,ourvn o.wry,.maea,00m:ia a.r� /`� 828.296.4500 Compliance Inspection Report Permit:NCG170423 Effective: 08/01/19 Expiration: 05/31/24 Owner: Kimberly-Clark Corporation SOC: Effective: Expiration: Facility: Kimberly Clark-Berkeley Mill-Nonwovens County: Henderson 32 Smyth Ave Region: Asheville Hendersonville NC 28792 Contact Person:Raymond Johnson Title: EHS&S Leader Phone:828-697-4040 Directions to Facility: System Classifications: SWNC, Primary ORC: Certification: Phone: Secondary ORC(s): On-Site Representative(s): Related Permits: NCGNE0087 Kimberly-Clark Corporation-Berkeley Mill Inspection Date: 03/11/2021 Entry Time 10:40AM Exit Time: 12:15PM Primary Inspector:Isaiah L Reed Phone: 828-296-4614 Secondary Inspector(s): i Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Textile Mill Products Stormwater Discharge COC Facility Status: E Compliant ❑ Not Compliant Question Areas: Storm Water I (See attachment summary) Page 1 of 3 Permit: NCG170423 Owner-Facility:Kimberly-Clark Corporation Inspection Date: 03/11/2021 Inspection Type:Compliance Evaluation Reason for Visit: Routine Inspection Summary: On March 11, 2021 this facility was inspected for compliance. I met with Ray Johnson and William Jones on site. No major issues were observed during the inspection. However, it is recommended that the permittee evaluate all potential and current outfall locations and add or remove outfall locations as necessary to include areas with the potential to impact runoff. If you have any questions, please contact this office at(828)296-4614 1 I i I Page 2 of 3 Permit: NCG170423 Owner-Facility:Kimberly-Clark Corporation Inspection Date: 03/11/2021 Inspection Type:Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? 0 ❑ ❑ ❑ #Does the Plan include a General Location (l1SGS)map? 0 ❑ ❑ ❑ #Does the Plan include a"Narrative Description of Practices"? 0 ❑ ❑ ❑ #Does the Plan include a detailed site map including outfall locations and drainage areas? 0 ❑ ❑ ❑ #Does the Plan include a list of significant spills occurring during the past 3 years? 0 ❑ ❑ ❑ #Has the facility evaluated feasible alternatives to current practices? 0 ❑ ❑ ❑ #Does the facility provide all necessary secondary containment? 0 ❑ ❑ ❑ #Does the Plan include a BMP summary? 0 ❑ ❑ ❑ #Does the Plan include a Spill Prevention and Response Plan(SPRP)? E ❑ ❑ ❑ #Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? ❑ ❑ ❑ #Does the facility provide and document Employee Training? ❑ ❑ ❑ #Does the Plan include a list of Responsible Party(s)? M ❑ ❑ ❑ #Is the Plan reviewed and updated annually? 0 ❑ ❑ ❑ #Does the Plan include a Stormwater Facility Inspection Program? 0 ❑ ❑ ❑ Has the Stormwater Pollution Prevention Plan been implemented? 0 ❑ ❑ ❑ Comment: Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring semi-annually? 0 ❑ ❑ ❑ Comment: Permit and Outfalls Yes No NA NE #Is a copy of the Permit and the Certificate of Coverage available at the site? 0 ❑ ❑ ❑ #Were all outfalls observed during the inspection? 0 ❑ ❑ ❑ i #If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ E ❑ i #Has the facility evaluated all illicit(non stormwater)discharges? E ❑ ❑ ❑ j Comment: i Page 3 of 3