Loading...
HomeMy WebLinkAboutU-4438 (4)RE U 4438 Pasquotank Bridge Project Page I of 1 i F RE U -4438 Pasquotank Bridge Project v ? Ward, Garcy Sent Wednesday August 08 2012 9 51 AM r To Willis Thomas C Williams Paul C Biddlecome William J SAW (William J Biddlecome @usace army mil) Cc Carrillo Sonia Wainwright David ' Clay Condition 6 of the 401 specifically prohibits betting without prior written approval # from DWQ This e -mail can serve as approval with the following conditions (1) Approval } from the following agencies including the Corps DCM WRC and DMF and (2) I would l c like to be present for at least the first jetting attempt ! I see that WRC DMF and the Corps have responded I 11 wait to hear of any concerns that DCM may have Thanks Garcy Ward Environmental Senior Specialist North Carolina Division of Water Quality Washington Regional Office - - - -- Original Message---- - From Willis Thomas C Sent Monday August 06 2012 4 34 PM j To Williams Paul C Biddlecome William J SAW (William J Biddlecome @usace army mil) Ward Garcy Subject U -4438 Pasquotank Bridge Project Y Guys r The contractor has been having trouble trying to pull the old concrete bridge piles out He has a 220 ton crane and they have tried to vibrate the piles out multiple times and cannot get them to move They used a hollow steel pile and vibrated it down around the existing concrete pile to loosen the compaction around the pile This still dial not work and now the only option is to place a turbidity curtain around the pile and run a single water het down the side of the pile to break the freeze on the pile Hopefully once they complete this on a few of the piles the soil will give some and allow the rest of the piles to come up without the betting The contractor will deploy a turbidity curtain around each pile that uses a single het to break the pile free , The only other option is to cut the piles of below the mud line but this will mean we need to redesign some of the new pile positions to avoid hitting the old piles remaining in the mud which is not a very good option Do you guys have any concerns with this technique? Thanks Clay NCDOT Division One Environmental Supervisor 252 - 339 -0112 tcwillis @ncdot gov Email correspondence to and from this sender is subject to the N C Public Records Law and may be disclosed to third parties https //mail nc gov /owa/ ?ae= Item &t =IPM Note &id= RgAAAADMSzLcd9W2TJH14 %2bm 8/9/2012