Loading...
HomeMy WebLinkAbout20201521 Ver 1_B-5619_Buffer Drawings_20210305SITE 3 RIGHT OF WAY DATE: LETTING DATE: PROJECT ENGINEER NCDOT CONTACT PROJECT DESIGN ENGINEER = = =D T V = = = = = = % % MPH ADT ADT FUNC CLASS = 0 0 0 PROFILE (HORIZONTAL) PROJECT LENGTH STATE STATE PROJECT REFERENCE NO. STATE PROJ. NO.F. A. PROJ. NO.DESCRIPTION NO. TOTAL SHEETS N.C. SHEET 1 DESIGN DATA SIGNATURE: SIGNATURE: P.E. P.E. GRAPHIC SCALES PLANS PROFILE (VERTICAL) ENGINEER ROADWAY DESIGN LOCATION: TYPE OF WORK:09/08/99DIVISION OF HIGHWAYS STATE OF NORTH CAROLINA 0 00 CONTRACT:TIP PROJECT:ARTMEN N ASO H DEPT O F TRA S PORTTIONTATEOFNRTCAR O LI NAENGINEER HYDRAULICS Prepared for NCDOT in the Office of: K 50 25 50 100 50 25 50 100 10 5 10 20 DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED VICINITY MAP See Sheet 1B For Conventional Plan Sheet Symbols See Sheet 1A For Index of Sheets 02-MAR-2021 14:01R:\Hydraulics\PERMITS_Environmental\Drawings\B5619_Hyd_prm_buf_tsh.dgn1784rjdLENOIR COUNTY B-5619RICK DECOLA, PE SR 1389 (HARDY BRIDGE ROAD) BRIDGE NO. 152 OVER NEUSE RIVER OVERFLOW ON BRIDGE NO. 52 OVER NEUSE RIVER AND GRADING, DRAINAGE, PAVING, AND STRUCTURE B-5619 TOTAL LENGTH TIP PROJECT B-5619 LENGTH STRUCTURE TIP PROJECT B-5619 LENGTH ROADWAY TIP PROJECT B-5619 SUB-REGIONAL TIER MINOR COLLECTOR NC License No. F-1235 919-714-8670 | meadhunt.com Raleigh, North Carolina 27601 111 E. Hargett Street, Suite 300 60 N/A45574.1.1 PE TO NC 55 -L- STA. 22+00.19 BEGIN BRIDGE -L- STA. 24+12.81 END BRIDGE % *6 NEUSE RI VEROVERFLOW NEUSE RIVER 10 70 OFF-SITE DETOUR ROW PLANS -L- STA. 20+50.00 BEGIN TIP PROJECT B-5619 -L- STA. 35+50.00 END TIP PROJECT B-5619 -L- STA. 33+10.79 END BRIDGE -L- STA. 28+49.21 BEGIN BRIDGE -L- SR 1389 ROAD HARDY BRIDGE -DR2- -DR1- TO US 70 * TTST =2%DUAL =4% 2020 2040 1850 3000 2018 STANDARD SPECIFICATIONS SURAJ SANGHANI, EI 70 70 55 55 55 LOCATION PROJECTWAYNE COUNTYLENOIR COUNTY903 903 903 0.284 MILES 0.128 MILES 0.156 MILES RIVER NEUSE DAVID STUTTS, PE MAY 18, 2021 THIS PROJECT IS NOT WITHIN ANY MUNICIPAL BOUNDARIES. CLEARING ON THIS PROJECT SHALL BE PERFORMED TO THE LIMITS ESTABLISHED BY METHOD II. THERE IS NO CONTROL OF ACCESS ON THIS PROJECT. 45574.2.1 BRZ-1389(003)R/W & UTILITY -L- STA. 18+19.00 BEGIN CONSTRUCTION -L- STA. 37+95.00 END CONSTRUCTION C204475SEPTEMBER 15, 2020 BUFFER IMPACTS PERMIT SHEET 1 OF 4 BUFFER DRAWING-L- STA. 35+50.00 END TIP PROJECT B-5619 -L- STA. 20+50.00BEGIN TIP PROJECT B-5619 -L- POT Sta. 38+00.00 -L- PT Sta. 17+00.00-L- STA. 22+00.19 BEGIN BRIDGE -L- STA. 24+12.81 END BRIDGE-L- STA. 28+49.21 BEGIN BRIDGE-L- STA. 33+10.79 END BRIDGE -DR1- POT Sta. 10+00.00 -DR2- PRC Sta. 10+58.71 -DR2- PT Sta. 10+95.25 -DR1- PC Sta. 10+99.80 -DR2- PC Sta. 10+31.00-DR1- PT Sta. 11+55.70 -DR1- PRC Sta. 11+33.05 -DR2- POT Sta. 12+99.95-DR2- POT Sta. 10+00.00 -DR1- POT Sta. 11+86.70 =-L- Sta. 27+50.00 = -DR2- STA. 10+95.00 END CONSTRUCTION-DR1- STA. 11+00.00 BEGIN CONSTRUCTION -L- STA. 21+89.31 BEGIN APPROACH SLAB -L- STA. 24+23.69 END APPROACH SLAB-L- STA. 28+35.04 BEGIN APPROACH SLAB -L- STA. 33+24.96 END APPROACH SLAB POT Sta. 10+00.00 PC Sta. 10+18.22 -L- STA. 19+75.00BEGIN CONSTRUCTION -L- STA. 37+95.00 END CONSTRUCTION -L- STA. 21+74.31BEGIN SBG LT & RT -L- STA. 28+20.04 BEGIN SBG LT & RT -L- STA. 33+39.96END SBG LT & RT EXISTINGTAPER TOREMOVE EXISTING GUARDRAIL REMOVE EXISTING GUARDRAILS.CaswellSt.4 5 NA 2011 NAD 83/ Submitted 3/5/2021 SITE 3 WORK BRIDGE DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED REVISIONS HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO. SHEET NO.PROJECT REFERENCE NO.8/17/99DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED 02-MAR-2021 14:01R:\Hydraulics\PERMITS_Environmental\Drawings\B5619_Hyd_prm_buf_psh_5.dgn1784rjdBRIDGE APPROACH SLABMATCHLINE -L- STA. 26+50 SEE SHEET 4FOR STRUCTURE PLANS, SEE SHEET S-? THRU S-? B-5619 5 NOTE: ALL DRIVEWAY RADII ARE 10' NC License No. F-1235 919-714-8670 | meadhunt.com Raleigh, North Carolina 27601 111 E. Hargett Street, Suite 300 NAD 83/ NA 2011 FOR -L-, -DR1- & -DR2- PROFILES, SEE SHEET 6 BUFFER IMPACTS PERMIT ALLOWABLE IMPACTS ZONE 1 ALLOWABLE IMPACTS ZONE 2 SHEET 2 OF 4 BUFFER DRAWING WOODS WOODS 11' SOIL9' SOIL18' BST BL-3 5 N 31°45'38" ENEUSE RI VER60.00'EXISTING R/W EXISTING R/W GARY EUGENE JONES DB 1668 PG 340 CHESTER B. HOOTEN DB 800 PG 670 DB 1768 PG 863 DB 872 PG 860 BL-4 MTL MTL MTL MTL P ROP ERTY LI NE ALONG NEUS E RI VERP ROP ERTY LI NE ALONG NEUS E RI VERPROPERTY LI NE ALONG NEUSE RI VERPROPERTY LI NE ALONG NEUSE RI VER67SR 1389 (HARDY BRIDGE RD.) MB 13 PG 9 MB 13 PG 9 DB 1777 PG 198 DIANE H. LYNCH JIMMY P LYNCH & WB 17-E 268 REGINA HARDY ZANE DB 1777 PG 198 DIANE H. LYNCH JIMMY P LYNCH & WB 17-E 268 REGINA HARDY ZANE WOODS -L- STA. 35+50.00 END TIP PROJECT B-5619 -L- POT Sta. 38+00.00 -L- GREU TL-3 GREU TL-3 -L- STA. 28+49.21 BEGIN BRIDGE -L- STA. 33+10.79 END BRIDGE -DR1- POT Sta. 10+00.00 -DR2- PRC Sta. 10+58.71 -DR2- PT Sta. 10+95.25 -DR1- PC Sta. 10+99.80 -DR2- PC Sta. 10+31.00 -DR1- PT Sta. 11+55.70 -DR1- PRC Sta. 11+33.05 -DR2- POT Sta. 12+99.95 -DR2- POT Sta. 10+00.00 -DR1- POT Sta. 11+86.70 = -L- Sta. 27+50.00 = -DR2- STA. 10+95.00 END CONSTRUCTION -DR1- STA. 11+00.00 BEGIN CONSTRUCTION GREU TL-3 GREU TL-3 -L- STA. 28+35.04 BEGIN APPROACH SLAB -L- STA. 33+24.96 END APPROACH SLAB30 35-L- STA. 37+95.00 END CONSTRUCTION TYPE B-77 TYPE B-77 TYPE B-77 TYPE B-77 TYPE B-77 TYPE B-77 -DR2--DR1- PSH PSH PSH SEE DETAIL P1 PSH SEE DETAIL P1 15" RCP-IV 15" RCP-IV ELB ELB ELB ELB 15" W/ELBOWS 15" W/ELBOWS TB 2GI TB 2GI TB 2GI STRUCTURE PAY ITEM CLASS II RIP RAP STRUCTURE PAY ITEM CLASS II RIP RAP AA W PLAN VIEW SECTION A-A (4'min typ.) PREFORMED SCOUR HOLE *NOT TO SCALE BFILL SLOPEPSRM 2:12:1PIPE (d = 15" OR 18") INFLOW 3/08 D DETAIL P1 FILTER FABRIC RIPRAP WITH LINER: CLASS B NATURAL GROUND AND FLUSH WITH INSTALL LEVEL basin not shown) (Rip Rap in Scour Hole (PSH) Square Preformed Outlet Pipe or Ditch matting (PSRM) Permanent Soil Reinforcement grasses at installation. Seed with native MIN. 1' TUCK -L- STA 33+35 (RT) -L- STA 28+38 (RT) GROUND NATURAL W= 4' D= 2' B= 4' 2GI TB 1 3 3 4 5 1 PI Sta 10+47.60 D L = 27.71' T = 16.60' R = 20.00' PI Sta 10+84.62 D L = 36.54' T = 25.91' R = 20.00' -DR1- CURVE DATA -DR2- CURVE DATA PI Sta 11+19.40 = 76 12' 18.8" (RT)D D = 229 10' 59.2" L = 33.25' T = 19.60' R = 25.00' PI Sta 11+45.76 = 64 53' 11.7" (LT)D D = 286 28' 44.0" L = 22.65' T = 12.71' R = 20.00' F F F F C F F F F F Submitted 3/5/2021 WORK BRIDGE WORK BRIDGE DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED REVISIONS HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER SHEET NO.PROJECT REFERENCE NO.02-MAR-2021 14:05R:\Hydraulics\PERMITS_Environmental\Drawings\B5619_Hyd_prm_buf_psh_5_inset.dgn1784rjd8/17/99DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED GRAPHIC SCALE 0'75'25'50'25' B-5619 5 - INSET R/W SHEET NO. NAD 83/ NA 2011 NC License No. F-1235 919-714-8670 | meadhunt.com Raleigh, North Carolina 27601 111 E. Hargett Street, Suite 300 ALLOWABLE IMPACTS ZONE 1 ALLOWABLE IMPACTS ZONE 2 SITE 3 - BUFFER IMPACTS30NEUSE RI VERWOODS WOODS 11' SOIL9' SOILBL-3 5 N 31°45'38" EP ROP ERTY LI NE ALONG NEUS E RI VERPROPERTY LI NE ALONG NEUSE RI VERPROPERTY LI NE ALONG NEUSE RI VERDB 1777 PG 198 DIANE H. LYNCH JIMMY P LYNCH & GREU TL-3 GREU TL-3 501 502 503 506PSH PSH SEE DETAIL P1 PSH SEE DETAIL P1 15" RCP-IV ELB ELB 15" W/ELBOWS 15" W/ELBOWS TB 2GI TB 2GI STRUCTURE PAY ITEM CLASS II RIP RAP STRUCTURE PAY ITEM CLASS II RIP RAP C SHEET 3 OF 4 BUFFER DRAWING Submitted 3/5/2021 ROAD CROSSING BRIDGEPARALLEL IMPACTZONE 1 (ft2)ZONE 2 (ft2)TOTAL (ft2)ZONE 1 (ft2)ZONE 2 (ft2)TOTAL (ft2)ZONE 1 (ft2)ZONE 2 (ft2)3 5 @ 92' - 36" PCG -L- 28+45 to 32+43 LT X 3765 2419 61843 5 @ 92' - 36" PCG -L- 28+64 to 32+43 RT X 2138 1532 3670TOTAL:5903 3951 9854Note: SHEET 4 OF 4N.C. DEPT. OF TRANSPORTATIONDIVISION OF HIGHWAYS LENOIR COUNTYB-561945574.1.1 2/15/2021IMPACTBUFFER IMPACTS SUMMARYTYPESITE NO.STRUCTURE SIZE / TYPE STATION (FROM/TO)ALLOWABLEMITIGABLEBUFFER REPLACEMENTRev. May 2006Submitted 3/5/2021