HomeMy WebLinkAbout20201521 Ver 1_B-5619_Permit Drawings_20210305(Version 2.08; Released April 2018)45574.1.1TIP No.:B-5619County(ies):Lenoir Page 1 of 2TIP Number:Date:Phone:Phone:Email:Email:County(ies):CAMA County?YesDesign/Future:Year:2040Existing:Year:Aquatic T&E Species?YesComments:NoNoNoN/ADeck Drains Discharge Over Water Body?(If yes, provide justification in the General Project Narrative) (If yes, describe in the General Project Narrative; if no, justify in the General Project Narrative)(If yes, provide justification in the General Project Narrative)ac.2-lane minor collector with about 10' wide lanes with minimal to no shoulder widths. 11' lanes are before the other existing overflow bridge that was recently replaced.3000roger.weadon@meadhunt.comProject Includes Bridge Spanning Water Body?Deck Drains Discharge Over Buffer?Dissipator Pads Provided in Buffer?NRTR Stream ID:Annual Avg Daily Traffic (veh/hr/day):Existing SiteProject Length (lin. miles or feet): ac.Surface Water Body (1): Water Supply IV (WS-IV)NCDWR Surface Water Classification for Water BodyNeuseBuffer Rules in Effect:SA18502-lane minor collector with 12' lanes. 5' full depth paved shoulders, and guardrail between bridges. Fill slopes between 4:1 and 3:1. Overflow bridge has 6.25' shoulders and main bridge has 5.5' shoulders.Waterbody Information2020NCDWR Stream Index No.:45574.1.1Impairments:Other Stream Classification: Primary Classification: Project Built-Upon Area (ac.)The proposed project involves replacing the Neuse River bridge (530052) and southern overflow bridge (5300152) along SR 1389 (Hardy Bridge Road) in Lenoir County. The Neuse River is subject to Buffer Rules. The Neuse River Overflow is not subject to Buffer Rules and is considered a wetland. The Neuse River bridge will be replaced with the use of a temporary work bridge and the southern overflow bridge will be replaced utilizing top-down construction. Proposed roadway improvements include lane and shoulder widening along with adding guardrail between the bridges and at the bridge approaches. The project starts starts between SR 1307 (Pine Bush Rd.) and SR 1300 (Davis Hardy Rd.) and is a total length of 0.284 miles long. For the Neuse River bridge, the stormwater will be treated through storm pipe systems at each end and that will outlet into preformed scour holes. Preformed scour holes are being used to help with preventing erosion in Buffer Zones. Stormwater from the southern overflow bridge will outlet onto a rip rap pad, outside of wetlands. The roadway improvements are mostly contained within the existing roadway embankment and right of way, minimizing wetland impacts. Wetlands delineated through the Neuse River Overflow are separated at the existing southern overflow bridge, and wetlands are not considered to be present underneath the bridge. Therefore wetland impacts have been shown on each side of the bridge to the proposed width of the new structure.111 E. Hargett StreetNorth Carolina Department of TransportationHighway Stormwater Program STORMWATER MANAGEMENT PLAN FOR NCDOT PROJECTSProject Type:1581 Mail Service CenterAddress:General Project InformationB-5619WBS Element:Bridge ReplacementWBS Element:Mead & Hunt / Roger Weadon, PENCDOT Contact:(919)-707-6442Suite 300Raleigh, NC 27601Contractor / Designer:(919)-714-8669dstutts@ncdot.govAddress:2/15/2021LenoirSeven SpringsDavid Stutts, PERaleigh, NC 27699-1581River Basin(s): City/Town:0.9Typical Cross Section Description: Surrounding Land Use: General Project Narrative:(Description of Minimization of Water Quality Impacts)NoMostly Agricultural with some ResidentialNeuse River27-(104)0.80.28Project DescriptionProposed ProjectNeusePrimary Nursery AreasSupplemental Classification: Atlantic SturgeonNutrient Sensitive Waters (NSW)Wetlands within Project Limits?Submitted 3/5/2021
(Version 2.08; Released April 2018)TIP No.:B-5619County(ies):Lenoir Page 2 of2Sheet No.Station & Coordinates (Road and Non Road Projects)Surface Water BodyRiprap TypeDrainage Area(ac)Conveyance Structure-L- 21+79 RT-L- 28+37 RT-L- 33+35 RTPreformed Scour Holes and Energy Dissipators15PSH Class 'B' 0.2 PipeYesYes1.3Pipe1.3151.60.70.7WBS Element:Class 'B'5(1)Neuse RiverNeuse River Overflow4Highway Stormwater ProgramAdditional CommentsNorth Carolina Department of TransportationPSH0.25(1)Neuse RiverV10(fps)Energy Dissipator TypeRip Rap PadSTORMWATER MANAGEMENT PLANFOR NCDOT PROJECTSBMP Associated w/ Buffer Rules?Pipe0.2Class 'B'Q10(cfs)Pipe/Structure Dimensions(in)1.3No15* Refer to the NCDOT Best Management Practices Toolbox (2014), NCDOT Standards, the Federal Highway Administration (FHWA) Hydraulic Engineering Circular No. 14 (HEC-14), Third Edition, Hydraulic Design of Energy Dissipators for Culverts and Channels (July 2006), as applicable, for design guidance and criteria.The Preformed Scour Holes are located at outlets in the vicinity of buffer zones near Site 3. They will dissapate the stormwater flow at these pipe outlets before entering the buffer zone. The velocities listed in the table are velocities exiting the preformed scour holes.Submitted 3/5/2021
Submitted 3/5/2021
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
REVISIONS HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
R/W SHEET NO.
SHEET NO.PROJECT REFERENCE NO.8/17/99DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
18-FEB-2021 18:31R:\Hydraulics\PERMITS_Environmental\Drawings\B5619_Hyd_prm_wet_psh_4.dgn1784rjdBRIDGE APPROACH SLAB MATCHLINE -L- STA. 26+50 SEE SHEET 5FOR STRUCTURE PLANS, SEE SHEET S-? THRU S-?
FOR -L- PROFILE, SEE SHEET 6
B-5619 4
NC License No. F-1235
919-714-8670 | meadhunt.com
Raleigh, North Carolina 27601
111 E. Hargett Street, Suite 300
NAD 83/ NA 2011WETLAND AND SURFACE WATER IMPACTS PERMIT
WETLAND
DENOTES FILL INFF
SITE 1
HC HC
CLEARING
DENOTES HAND
E
E
E
E
F
SITE 1
F
E E IN WETLAND
DENOTES EXCAVATION
T
SR 1389 (HARDY BRIDGE RD.)
HEDGE
W
OO
D
SWOODS
WOODS WOODS
WOODS
WOODS
WOODS13' SOILCONC CONC
CONCCONC
18' BST
R/W MON.
42" CMP
42" CMP
WB 17-E 268
RESTORATION SYSTEMS LLC
DB 1228 PG 638
2
3
4
EXISTING R/W
EXISTING R/WEXISTING R/W
EXISTING R/W
OVERFLOW
NEUSE RIVER
OVERFLOW
NEUSE RIVER
WOODS
60.00'60.00'N 50°04'22" W362.67'N 27°45'38" E1304.04'N 31°45'38" E587.60'
MB 13 PG 9
MB 13 PG 9
MB 13 PG 9
CONC WW
CONC WW
CONC WW
CONC WWCONC RETAINING WALL
CONC RETAINING WALL
DB 1777 PG 198
WALL
RETAINING
CONC
DIANE H. LYNCH
JIMMY P LYNCH &
REGINA HARDY ZANE
WB 17-E 268
MB 13 PG 9
REGINA HARDY ZANE
WB 17-E 268
REGINA HARDY ZANE
CONC RETAINING WALL
JOYCE HARDY AVERY LIFE TRUST
DB 1021 PG 37
MB 13 PG 9
-L- STA. 20+50.00
BEGIN TIP PROJECT B-5619
-L-
-L- PT Sta. 17+00.00
-L- STA. 22+00.19
BEGIN BRIDGE
-L- STA. 24+12.81
END BRIDGE
GREU TL-3
GREU TL-3
-L- STA. 21+89.31
BEGIN APPROACH SLAB
-L- STA. 24+23.69
END APPROACH SLAB152025POT Sta. 10+00.00PC Sta. 10+18.22-L- STA. 19+75.00
BEGIN CONSTRUCTION
TYPE-III
TYPE-III
TYPE-III
TYPE-III
1
1
3
1
ENCROACHMENT ALLOWED.
NO DISTURBANCE OR
CONSERVATION EASEMENT,
MITIGATION SERVICES
*NOTE: DIVISION OF
15" RCP-IV
TB 2GI
TB 2GI
STRUCTURE PAY ITEM
CLASS II RIP RAP
STRUCTURE PAY ITEM
CLASS II RIP RAP
ELB
ELB
W/ 2 ELBOWS
15"
EST. 5 SY GEOTEXTILE
EST. 1 TONS
CLASS B RIP RAP
PI Sta 13+65.31
D
L = 681.78'
T = 347.09'
R = 1,475.00'
-L- CURVE DATA
F
F F
F
F
F
SHEET 2 OF 12
PERMIT DRAWING
Submitted 3/5/2021
333434343535
35353535 3535353535
35
363636363636
363636
36
3737 3737
3
7
373 7
373737
3737373737
37
37373737373737373737373838383838
383838
38
38383838 3838
383838383
8
3838 38383838383838 383838
38383838383838
383
8
383838383838383
8 38383838 3838 383838
383838
3
838
38
38
38
38383838383839
39
3939
3939
39
39
39
3939393939393939
39
39393939 393939393939393
9
3939 393939
3939393939393939
3939
393
9
3939 393939393939393939393939393939 3939
3939393939393939393939
39 3939393939393939393940404040
4040404040
40 404040 4040404040
40 4040404040
40
40
40404040404040
40
40404040
4040
4040
404040
40
40 404040404040404040404
04040 404040 40 40404040
404040 40
40
40
40
40404040404040
404040404040404040404040404040
4
0
40
40 40404040404
0
40404 0
4040404040
404040404040404040404040404040
4040
404040404040404040
404040404040404040404040404040404041
41414141414141
41414141 4141 41414
1
4141
4141 414
1
414141
41 41414141
4141414141414
1
414141414141424242424242
4242
42
42424242
4
24242
4242424242
42424242424242 42
4242
42
4242 4242424
2 424242
42424
2
42 4242424242424243434343
4343
43
43 43434343434343
434343434343434343434343
4343434343434344444444444444444444
44
4444444444
44444444454545454545454545454545
45
45
45
45
45
45
4
545
45
45 454545454646464646464646
46
46
46 464647
47
47
47
474747474747
47 474748
48
48 48
48 48484848484848
48 494949
49
49
49 49
494949494949 505050
50
50
505050505151 51
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
REVISIONS HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
R/W SHEET NO.
SHEET NO.PROJECT REFERENCE NO.8/17/99DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
18-FEB-2021 18:32R:\Hydraulics\PERMITS_Environmental\Drawings\B5619_Hyd_prm_wet_con_psh_4.dgn1784rjdBRIDGE APPROACH SLAB MATCHLINE -L- STA. 26+50 SEE SHEET 5FOR STRUCTURE PLANS, SEE SHEET S-? THRU S-?
FOR -L- PROFILE, SEE SHEET 6
B-5619 4
NC License No. F-1235
919-714-8670 | meadhunt.com
Raleigh, North Carolina 27601
111 E. Hargett Street, Suite 300
NAD 83/ NA 2011WETLAND AND SURFACE WATER IMPACTS PERMIT
WETLAND
DENOTES FILL INFF
SITE 1
HC HC
CLEARING
DENOTES HAND
SITE 1
E
E
E
E
F F
E E IN WETLAND
DENOTES EXCAVATION
T
SR 1389 (HARDY BRIDGE RD.)
HEDGE
W
OO
D
SWOODS
WOODS WOODS
WOODS
WOODS
WOODS13' SOILCONC CONC
CONCCONC
18' BST
R/W MON.
42" CMP
42" CMP
WB 17-E 268
RESTORATION SYSTEMS LLC
DB 1228 PG 638
2
3
4
EXISTING R/W
EXISTING R/WEXISTING R/W
EXISTING R/W
OVERFLOW
NEUSE RIVER
OVERFLOW
NEUSE RIVER
WOODS
60.00'60.00'N 50°04'22" W362.67'N 27°45'38" E1304.04'N 31°45'38" E587.60'
MB 13 PG 9
MB 13 PG 9
MB 13 PG 9
CONC WW
CONC WW
CONC WW
CONC WWCONC RETAINING WALL
CONC RETAINING WALL
DB 1777 PG 198
WALL
RETAINING
CONC
DIANE H. LYNCH
JIMMY P LYNCH &
REGINA HARDY ZANE
WB 17-E 268
MB 13 PG 9
REGINA HARDY ZANE
WB 17-E 268
REGINA HARDY ZANE
CONC RETAINING WALL
JOYCE HARDY AVERY LIFE TRUST
DB 1021 PG 37
MB 13 PG 9
-L- STA. 20+50.00
BEGIN TIP PROJECT B-5619
-L-
-L- PT Sta. 17+00.00
-L- STA. 22+00.19
BEGIN BRIDGE
-L- STA. 24+12.81
END BRIDGE
GREU TL-3
GREU TL-3
-L- STA. 21+89.31
BEGIN APPROACH SLAB
-L- STA. 24+23.69
END APPROACH SLAB152025PC Sta. 10+18.22-L- STA. 19+75.00
BEGIN CONSTRUCTION
TYPE-III
TYPE-III
TYPE-III
TYPE-III
1
1
3
1
ENCROACHMENT ALLOWED.
NO DISTURBANCE OR
CONSERVATION EASEMENT,
MITIGATION SERVICES
*NOTE: DIVISION OF
15" RCP-IV
TB 2GI
TB 2GI
STRUCTURE PAY ITEM
CLASS II RIP RAP
STRUCTURE PAY ITEM
CLASS II RIP RAP
ELB
ELB
W/ 2 ELBOWS
15"
EST. 5 SY GEOTEXTILE
EST. 1 TONS
CLASS B RIP RAP
PI Sta 13+65.31
D
L = 681.78'
T = 347.09'
R = 1,475.00'
-L- CURVE DATA
F
F F
F
F
F
SHEET 3 OF 12
PERMIT DRAWING
Submitted 3/5/2021
WETLAND
DENOTES FILL INFF
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
REVISIONS HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
SHEET NO.PROJECT REFERENCE NO.18-FEB-2021 18:32R:\Hydraulics\PERMITS_Environmental\Drawings\B5619_Hyd_prm_wet_psh_4_inset.dgn1784rjd8/17/99DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
GRAPHIC SCALE
0'75'25'50'25'
B-5619 4 - INSET
R/W SHEET NO.
NAD 83/ NA 2011
NC License No. F-1235
919-714-8670 | meadhunt.com
Raleigh, North Carolina 27601
111 E. Hargett Street, Suite 300
HC HC
CLEARING
DENOTES HAND
SITE 1 SITE 12323
SITE 1
SITE 1 - WETLAND IMPACTS
SITE 1
SITE 1 - WETLAND IMPACTS
E E IN WETLAND
DENOTES EXCAVATION
3334343535
353535353535 36363636
373
737
37
38
38 3838
39 3940
4040 4041 414242444545 4546464747 474848 4949
50
505050 51
E
E
E
E
F F
T
WOODS
CONC CONC
CONCCONC
4
OVERFLOW
NEUSE RIVER
OVERFLOW
NEUSE RIVER
CONC WW
CONC WW
CONC WW
CONC WW
TYPE-III
TYPE-III
TYPE-III
TYPE-III
O
STRUCTURE PAY ITEM
CLASS II RIP RAP
STRUCTURE PAY ITEM
CLASS II RIP RAP
ELB
ELB
E
E
E
E
F F
T
WOODS
CONC CONC
CONCCONC
4
OVERFLOW
NEUSE RIVER
OVERFLOW
NEUSE RIVER
CONC WW
CONC WW
CONC WW
CONC WW
TYPE-III
TYPE-III
TYPE-III
TYPE-III
O
STRUCTURE PAY ITEM
CLASS II RIP RAP
STRUCTURE PAY ITEM
CLASS II RIP RAP
ELB
ELB
SHEET 4 OF 12
PERMIT DRAWING
Submitted 3/5/2021
00
00
1010
1010
2020
2020
3030
3030
4040
4040
5050
5050
6060
6060
7070
7070
8080
8080
9090
9090
100100
100100
110110
110110
120120
120
130130
130
140140
140
150150
150
18-FEB-2021 12:37X:\4306200\180804.01\TECH\Hydraulics\PERMITS_Environmental\Drawings\B5619_Rdy_xpl_L.dgn1784rjdPROJ. REFERENCE NO.SHEET NO.0
6/23/1640 40
50 50
30 30
20+00.00
40 40
50 50
60 60
30 30
20+50.00
40 40
50 50
60 60
21+00.00
40 40
50 50
60 60
21+50.00
40 40
50 50
60 60
22+00.00
40 40
50 50
60
30 3022+50.00
X-1B-5619
-L-
5 10
BLWBLWBLWBLWEXCAVATION LIMITEXCAVATION LIMITFILL LIMITFILL LIMITCLEARING LIMITCLEARING LIMIT49.37
49.62
0.0230.025
49.86 3:13:1 0.0200.020
50.01 2:12:1 0.0200.020
50.11
2:12:1
0.0200.020
END BENT SLOPE
CLASS II RIP RAP FOR
END BENT SLOPECLASS II RI
P RAP FOR36.33
0.0200.020
SHEET 5 OF 12
PERMIT DRAWING
Submitted 3/5/2021
00
00
1010
1010
2020
2020
3030
3030
4040
4040
5050
5050
6060
6060
7070
7070
8080
8080
9090
9090
100100
100100
110110
110110
120120
120
130130
130
140140
140
150150
150
18-FEB-2021 12:37X:\4306200\180804.01\TECH\Hydraulics\PERMITS_Environmental\Drawings\B5619_Rdy_xpl_L.dgn1784rjdPROJ. REFERENCE NO.SHEET NO.0
6/23/1630 30
40 40
50 50
60 60
20 20
23+00.00
30 30
40 40
50 50
60 60
23+50.00
40 40
50 50
60 60
24+00.00
40 40
50 50
60 60
24+12.81
40 40
50 50
60 60
24+50.00
X-2B-5619
-L-
5 10
BLWBLWBLWBLWBLWBLWBLWBLWBLWEXCAVATION LIMITEXCAVATION LIMITEXCAVATION LIMITCLEARING LIMITCLEARING LIMITCLEARING LIMITCLEARING LIMIT34.16
0.0200.020
34.65
0.0200.020
46.86
0.0200.020
50.94 2:12:1
0.0200.020
END BENT SLOPE
CLASS II RIP RAP FOR
END BENT SLOPECLASS II RI
P RAP FOR51.08 3:13:1 0.0200.020
SHEET 6 OF 12
PERMIT DRAWING
Submitted 3/5/2021
Submitted 3/5/2021
Submitted 3/5/2021
Submitted 3/5/2021
Submitted 3/5/2021
Submitted 3/5/2021
HandExisting Existing Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural SiteStationStructureFill In Fill In in Clearing in SW SW Impacts Impacts StreamNo. (From/To)Size / TypeWetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. Design (ac) (ac) (ac) (ac) (ac) (ac) (ac) (ft) (ft) (ft)1 -L- 21+92 to 24+35 LT Proposed Bridge Bents < 0.01 0.02 0.06 1 -L- 21+83 to 24+09 RT Proposed Bridge Bents < 0.01 0.02 0.06 2 -DR2- 10+42 to 11+05 LTFill< 0.01 < 0.01 3 -L- 29+12 to 31+94 RT Temporary Work Bridge 0.18 70 TOTALS*:< 0.01 0.04 0.12 0.18 0 70 0*Rounded totals are sum of actual impactsNOTES:Revised 2018 Feb SHEET 12OF 1296" Drilled Shaft Casings will be used to construct interior bents in Neuse River, with a temporary surface water impact of <0.01 ac. WETLAND AND SURACE WATER IMPACTS SUMMARYWETLAND IMPACTSSURFACE WATER IMPACTSLENOIR COUNTYB-561945574.1.1NC DEPARTMENT OF TRANSPORTATIONDIVISION OF HIGHWAYS2/15/2021Submitted 3/5/2021