Loading...
HomeMy WebLinkAbout20201521 Ver 1_ePCN Application_20210305 I I DWR Division of Water Resources Pre-Construction Notification (PCN) Form October 26,2020 Ver 3.3 Initial Review Has this project met the requirements for acceptance in to the review process?* 6 Yes ✓ No Is this project a public transportation project?* G Yes r No Change only if needed. BIMS#Assigned* Version#* 20201521 1 Is a payment required for this project?* ✓ No payment required 6 Fee received Reviewing Office* ✓ Fee needed-send electronic notification Washington Regional Office-(252)946-6481 Select Project Reviewer* Garcy Ward:eads\gpward Information for Initial Review 1a.Name of project: Replacement of Bridge no.52 over the Neuse River and Bridge No.152 over the Neuse River overflow on SR1389(Hardy Bridge Road) 1a.Who is the Primary Contact?* NCDOT lb.Primary Contact Email:* 1c.Primary Contact Phone:* driffey@ncdot.gov (919)707-6151 Date Submitted 3/5/2021 Nearest Body of Water Neuse River Basin Neuse Water Classification WS-N;NSW Site Coordinates Latitude: Longitude: 35.224615 -77.766738 Pre-Filing Meeting Information ID# Version 20201521 1 Pre-fling Meeting or Request Date* 9/28/2020 Attach documentation of Pre-Filing Meeting Request here:* Pre-Filing Notification Letter and List for 12 MLL.pdf 304.57KB A. Processing Information C^U County(or Counties)where the project is located: Lenoir Is this a NCDMS Project C- Yes f No Is this project a public transportation project?* 6 Yes r No Is this a NCDOT Project?* 6 Yes r No (NCDOT only)T.I.P.or state project number: B-5619 WBS#(2) 45574.1.1 1a.Type(s)of approval sought from the Corps: (7 Section 404 Permit(wetlands,streams and waters,Clean Water Act) fJ Section 10 Permit(navigable waters,tidal waters,Rivers and Harbors Act) Has this PCN previously been submitted?* C- Yes 6' No lb.What type(s)of permit(s)do you wish to seek authorization? fJ Nationwide Permit(NWP) f7 Regional General Permit(RGP) f-Standard(IP) 1c.Has the NWP or GP number been verified by the Corps? (7 Yes C No Nationwide Permit(NWP)Number: 12-Utility Lines NWP Numbers(for multiple NWPS): NW 57 Regional General Permit(RGP)Number: 201902350-Work associated with bridge construction,widening,replacement,and interchanges RGP Numbers(for multiple RGPS): Id.Type(s)of approval sought from the DWR: 17 401 Water Quality Certification-Regular 1 401 Water Quality Certification-Express f-Non-404 Jurisdictional General Permit 17 Riparian Buffer Authorization f- Individual Permit le.Is this notification solely for the record because written approval is not required? * For the record only for DWR 401 Certification: r Yes 6 No For the record only for Corps Permit: r Yes 6 No If.Is this an after-the-fact permit application?* C- Yes r No 1g.Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts? CYes 6' No 1g.Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts? C- Yes C- No Acceptance Letter Attachment lh.Is the project located in any of NC's twenty coastal counties? CYes 6No 1j.Is the project located in a designated trout watershed? C- Yes r No B. Applicant Information Id.Who is applying for the permit? 17 Owner f-Applicant(other than owner) le.Is there an Agent/Consultant for this project?* r Yes r No 2.Owner Information 2a.Name(s)on recorded deed: Mutiple Properties 2b.Deed book and page no.: 2c.Responsible party: 2d.Address Street Address 1598 Mail Service Center Address Line 2 (Sty State/Bovine/legion Raleigh NC Postal/Zip Code Country 27699-1598 USA 2e.Telephone Number: 2f.Fax Number: (919)707-6000 2g.Email Address:* pharris@ncdot.gov C. Project Information and Prior Project History e). 1. Project Information 1b.Subdivision name: (if appropriate) 1c.Nearest municipality/town: La Grange 2. Project Identification 2a.Property Identification Number: 2b.Property size: 2c.Project Address Street Address Address Line 2 IDLY State/Province/legion Postal/Zip(ode Country 3.Surface Waters 3a.Name of the nearest body of water to proposed project:* Neuse River 3b.Water Resources Classification of nearest receiving water:* WS-IV;NSW 3c. What river basin(s)is your project located in?* Neuse 3d.Please provide the 12-digit HUC in which the project is located. 030202020206 4. Project Description and History 4a.Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application:* Bridge 52(Neuse River)and Bridge 152(Neuse River Overflow)were built in 1954.Bridge 52 is approximately 451 feet long,26.2 feet wide and consists of nine spans.Bridge 152 is approximately 200 feet long,26.2 feet wide and consists of four spans.There are no existing pedestrian or bicycle facilities along SR 1389 in the project study area inclusive of Bridge 52 and Bridge 152.State bike route number 7,Ocracoke Option,is located within the project study area at both bridge locations.The Mountains-to-Sea Trail(MST)planned corridor also identifies a paddle route section along the Neuse River at Bridge 52. Land use in the project study area is a combination of maintained roadsides,residential,agricultural and undeveloped natural areas.The project study area is rural and predominantly undeveloped with maintained/mowed road right-of-way,open stream channel flanked by floodplain and forested wetland and agricultural fields toward the northern and southern (upland)ends of the project study area.The Bear Creek-Mill Branch Mitigation Bank is under a conservation easement.After coordination with the USAGE it was determined that a existing utility pole can be replaced in place,within the conservation easement boundary. 4b.Have Corps permits or DWR certifications been obtained for this project(including all prior phases)in the past?* c Yes r No r Unknown 4c.If yes,please give the DWR Certification number or the Corps Action ID(exp.SAW-0000-00000). NW6-SAW-2019-01183 July 2,2019 Project History Upload 4d.Attach an 8 1/2 X 11 excerpt from the most recent version of the USGS topographic map indicating the location of the project site.(for DWR) 4e.Attach an 8 1/2 X 11 excerpt from the most recent version of the published County NRCS Soil Survey map depicting the project site.(for DWR) 4f.List the total estimated acreage of all existing wetlands on the property: 12.69 4g.List the total estimated linear feet of all existing streams on the property: 1,901 4h.Explain the purpose of the proposed project:* Bridge 52 is considered functionally obsolete due to deck geometry and has a posted weight limit of 30 tons.Bridge 152 is considered structurally deficient due to the appraisals of the superstructure and substructure conditions.Safety is a factor for both bridges. 4i.Describe the overall project in detail,including indirect impacts and the type of equipment to be used:* The proposed replacement of Bridges No.52 over the Neuse River and No.152 over the Neuse River Overflow and their approaches will be on existing alignment.Traffic will be rerouted and maintained along a 16.5-mile off-site detour during construction.Proposed replacement Bridge 52 will have a minimum 35-foot clear roadway with 12-foot lanes and minimum 5-foot shoulders on both sides of the bridge with 5 spans and 42-inch high bridge railings to accommodate bicyclists.Proposed replacement Bridge 152 will have a minimum 36 feet and six inches of clear roadway width that includes two 12-foot lanes with minimum 6-foot three-inch shoulders on both sides of the bridge with 4 spans and 42-inch high bridge railings to accommodate bicyclists.The replacement Bridge 52 will be approximately 460 feet long and Bridge 152 will be approximately 220 feet long.Standard road building equipment,such as trucks,dozers,and cranes will be used. 4j.Please upload project drawings for the proposed project. B-5619_Permit Drawings.pdf 3.53MB B-5619_Buffer Drawings.pdf 1.68MB B-5619 Utility Permit Narrative.pdf 92KB B-5619_Utility Permit Drawings.pdf 4.77MB 5.Jurisdictional Determinations 5a.Have the wetlands or streams been delineated on the property or proposed impact areas?* 6 Yes r No r Unknown Comments: 5b.If the Corps made a jurisdictional determination,what type of determination was made?* F Preliminary r Approved r Not Verified r Unknown r N/A Corps AID Number: SAW-2019-01183 5c.If 5a is yes,who delineated the jurisdictional areas? Name(if known): Connor Makepeace Agency/Consultant Company: Mead&Hunt Other: 5d.List the dates of the Corp jurisdiction determination or State determination if a determination was made by the Corps or DWR Verification visit on March 25,2019.JD on July 2,2019 via NW 6 5d1.Jurisdictional determination upload B-5619 NWP 6_JD.pdf 294.3KB 6. Future Project Plans 6a.Is this a phased project?* r- Yes r No Are any other NWP(s),regional general permit(s),or individual permits(s)used,or intended to be used,to authorize any part of the proposed project or related activity? D. Proposed Impacts Inventory 1. Impacts Summary 1a.Where are the impacts associated with your project?(check all that apply): f7 Wetlands f7 Streams-tributaries f7 Buffers r Open Waters I- Pond Construction 2.Wetland Impacts 2a.Site#*(?) 2a1 Reason(?) 2b.Impact type*(?) 2c.Type of W.* 2d.W.name* 2e.Forested* 2f.Type of 2g.Impact Jurisdicition*(?) area* Site 1 Excavation P Riverine Swamp Forest WA Yes Both 0.020 (acres) Site 1 Excavation P Non-Riverine Swamp Forest WC Yes Both 0.020 (acres) Site 1 Fill P Riverine Swamp Forest WA Yes Both 0.002 (acres) Site 1 Fill P Non-Riverine Swamp Forest WC Yes Both 0.002 (acres) Site 2 Fill P Non-Riverine Swamp Forest WC Yes Both 0.003 (acres) 2g.Total Temporary Wetland Impact 2g.Total Permanent Wetland Impact 0.000 0.047 2g.Total Wetland Impact 0.047 2h.Comments: There will be a total of 0.309 acre of hand clearing.Site 1:0.12 acre of hand clearing for overflow bridge and 0.083 acre for aerial line;Site 2:0.004 acre for driveway access;Site 4:0.099 acre for aerial line;Site 5:0.003 acre for aerial line. 3.Stream Impacts 3a.Reason for impact(?) 3b.Impact type* 3c.Type of impact* 3d.S.name* 3e.Stream Type* 3f.Type of 3g.S.width* 3h.Impact (?) Jurisdiction* length* S1 Work bridge-Site 3 Temporary Other Neuse Perennial Both 282 70 Average(feet) (linear feet) 31.Total jurisdictional ditch impact in square feet: 0 31.Total permanent stream impacts: 3i.Total temporary stream impacts: 0 70 31.Total stream and ditch impacts: 70 3j.Comments: There will be<0.01 acre of temporary surface water impact for drill shaft casings for Site 3 at Neuse River and 0.18 acre of temporary fill for the work bridge. 6. Buffer Impacts(for DWR) 6a.Project is in which protect basin(s)? (heck all that apply. 17 Neuse r Tar-Pamlico I-Catawba r Randleman C Goose Creek r Jordan Lake [Other 6b.Impact Type 6c.Per or Temp 6d.Stream name 6e.Buffer mitigation required? 6f.Zone 1 impact 6g.Zone 2 impact Bridge P Neuse No 5,903 3,951 6h. Total buffer impacts: Zone 1 Zone 2 Total Temporary impacts: 0.00 0.00 Zone 1 Zone 2 Total Permanent impacts: 5,903.00 3,951.00 Zone 1 Zone 2 Total combined buffer impacts: 5,903.00 3,951.00 6i.Comments: Supporting Documentation E. Impact Justification and Mitigation 1.Avoidance and Minimization la.Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project: Impacts were minimized by using an offsite detour and only one temporary bridge as opposed to two temporary bridges.Design Standards in Sensitive Watersheds will be utilized. lb.Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques: The Neuse River Overflow Bridge will be replaced using top-down construction.Stormwater will outlet onto a riprap pad outside the wetlands for the Overflow Bridge.Stormwater for the Neuse River Bridge will be treated at each end and will outlet into preformed scour holes.Preformed scour holes will help prevent erosion in buffer zones.Roadway improvements were contained as much as possible within the existing roadway embankment and right of way to minimize impacts to wetlands. An in-water work moratorium from 2/15-9/30 will be adhered to due to the Neuse River being an Inland Primary Nursery as well as Critical Habitat for the Atlantic sturgeon at this location. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a.Does the project require Compensatory Mitigation for impacts to Waters of the U.S.or Waters of the State? ✓ Yes ( No 2b.If this project DOES NOT require Compensatory Mitigation,explain why: Impacts fall below mitigation thresholds. F. Stormwater Management and Diffuse Flow Plan (required by DWR) L) 1. Diffuse Flow Plan 1a.Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? (z Yes r No What type of SCM are you providing? n Level Spreader n Vegetated Conveyance(lower SHWT) n Wetland Swale(higher SHWT) n Other SCM that removes minimum 30%nitrogen I7 Proposed project will not create concentrated stormwater flow through the buffer Diffuse Flow Documentation 2.Stormwater Management Plan 2a.Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250?* ( Yes r No Comments: G. Supplementary Information 1. Environmental Documentation 1a.Does the project involve an expenditure of public(federal/state/local)funds or the use of public(federal/state)land?* ( Yes rNo lb.If you answered"yes"to the above,does the project require preparation of an environmental document pursuant to the requirements of the National or State(North Carolina) Environmental Policy Act(NEPA/SEPA)?* ( Yes rNo 1c.If you answered"yes"to the above,has the document review been finalized by the State Clearing House?* ✓ Yes ( No Comments:* Type II CEs due not require State Clearing House review. 2.Violations(DWR Requirement) 2a.Is the site in violation of DWR Water Quality Certification Rules(15A NCAC 2H.0500),Isolated Wetland Rules(15A NCAC 2H.1300),or DWR Surface Water or Wetland Standards or Riparian Buffer Rules(15A NCAC 2B.0200)?* ✓ Yes ( No 3. Cumulative Impacts(DWR Requirement) 3a.Will this project result in additional development,which could impact nearby downstream water quality?* ✓ Yes 6' 3b.If you answered"no,"provide a short narrative description. Due to the ebsting bridge being replaced,this project will neither influence nearby land uses nor stimulate growth. 4.Sewage Disposal(DWR Requirement) 4a.Is sewage disposal required by DWR for this project?* ✓ Yes rNo ( N/A 5. Endangered Species and Designated Critical Habitat(Corps Requirement) 5a.Will this project occur in or near an area with federally protected species or habitat?* ( Yes rNo 5b.Have you checked with the USFWS concerning Endangered Species Act impacts?* ( Yes C No 5c.If yes,indicate the USFWS Field Office you have contacted. Raleigh 5d.Is another Federal agency involved?* ( Yes C No C Unknown What Federal Agency is involved? NOAA-National Marine Fisheries 5e.Is this a DOT project located within Division's 1-8? ( Yes r No 5j.What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? USFWS Environmental Conservation Online System(ECOS)website,NCNHP database along with field surveys,USFWS 2020 Programmatic Biological Opinion for the Northern long-eared bat,and National Marine Fisheries Service Programmatic Biological Evaluation approval for Atlantic sturgeon habitat. Consultation Documentation Upload NOAA Section 7 B-5619.pdf 204.22KB 6. Essential Fish Habitat(Corps Requirement) 6a.Will this project occur in or near an area designated as an Essential Fish Habitat?* C Yes ( No 6b.What data sources did you use to determine whether your site would impact an Essential Fish Habitat?* NMFS County Index 7. Historic or Prehistoric Cultural Resources(Corps Requirement) 7a.Will this project occur in or near an area that the state,federal or tribal governments have designated as having historic or cultural preservation status?* C Yes ( No 7b.What data sources did you use to determine whether your site would impact historic or archeological resources?* NEPA documentation 7c.Historic or Prehistoric Information Upload 8. Flood Zone Designation(Corps Requirement) 8a.Will this project occur in a FEMA-designated 100-year floodplain?* 6 Yes r' No 8b.If yes,explain how project meets FEMA requirements: NCDOT Hydraulics Unit coordination with FEMA. 8c.What source(s)did you use to make the floodplain determination?* FEMA Maps Miscellaneous A Comments The current WQC 4133 for the NW 12 only allows 20'for permanent utility easements in wetlands and streams however a 30'easement is planned for this project.The new WQC 4275 for the upcoming new NW 57 allows for a 30'easement.We'd request an exception for the current WV 12 or issuance under the new NW 57(3/15/2021). Written approval from DWR is required for the GP 50 however with the NW 57 option,it does not appear DWR's authorization will require an Individual 401 WQC as impacts due to utility relocations falling below requirements for written approval. Miscellaneous attachments not previously requested. Signature 17 By checking the box and signing below,I certify that: • The project proponent hereby certifies that all information contained herein is true,accurate,and complete to the best of my knowledge and belief;and • The project proponent hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time. • I have given true,accurate,and complete information on this form; • I agree that submission of this PCN form is a"transaction"subject to Chapter 66,Article 40 of the NC General Statutes(the"Uniform Electronic Transactions Act"); • I agree to conduct this transaction by electronic means pursuant to Chapter 66,Article 40 of the NC General Statutes(the"Uniform Electronic Transactions Act"); • I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature;AND • I intend to electronically sign and submit the PCN form. Full Name: Mack Christopher Rivenbark III Signature ) tae. R a,111 Date 3/5/2021