HomeMy WebLinkAbout090210_POA_20210223r-ICHRUy Number.,
�
Far,Mty Mama: o���V l � � t7(�Ci�r 0 f�
FI
r`lln� ,I!ir
certified Operator Name: _ L,3a V-V-\ ��erat®fl• ;�
1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon lowest point on the top of the dam for lagoons without spillways; and from the current lit uido the
in the lagoon to the bottom of the spillway for Lagoons with spillways, 1 levol
Structure 1 Structure 2 Structure 3 Structure 4 Structure 6 Structure 6
Lagoon Name/identifier (ID):
Spillway (Yes or No).
Level (inches):
-------------
2. Check ail applicable items
J Liquid leve
l el is within the designed structural freeboard elevations of one or more structures, Five
and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within
acceptable ranges.
Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day
Plan of Action ie Athanhed. Agronomic balance is within acceptable range.
Waste is to be pumped and hauled to- off site locations. Volume and PAN content of waste to
pumped and hauled is reflected in section ill tables. included within this plan is a list of the
proposed sites with related facility number(s), number acres and receiving crop information.
Contact and secure appYovall from the Division of water uaiaty Sri®r ® ransfeP of waste
to a site not covered in the facility's certified anima' waste management pian.
Operation will be partially or fully depopulated.
- attach a complete schedule with corresponding animal units and dates for depopulation
- if animals are to be moved to another permitted facility, provide facility number, lagoon
freeboard levels and herd population for the receiving facility
3. Earliest possible date to begin land application of waste: �•t 9%51 �1
� PP ,
herei'oy cwtifry that i have reviewed the onformiRtaon listed above and iincludled within the attached Ran
of Action, and to the Wiest of my knowiedage and abMdy, the information ils accurate and correct.
LA V
oo OU a G ��
Lc� 6 _ o
Facility ®uvnetrll[Wanager (print)
Date: . ,
FacRy Owner/Manager (signature)
PoA Cover P299 2121100
Il. TOTAL VOLUME OF WASTE STORED WITHIN STRUCTURAL FREEBOARD ELEVATIONS
FOR ALL WASTE STRUCTURES FOR FACILITY
1. structure ID: David Gooden 2 line I = 161804 gallons
2. structure ID: 0 line I = gallons
3. structure ID: line I = gallons
4. structure ID: line I = gallons
5. structure ID: line I = gallons
6. structure ID: line I = gallons
n. lines 1 +2+3+4+5+6=
o. line n / 27154 =
161804 gallons
5.96 acre -inches
III. TOTAL ACRES AVAILABLE TO RECEIVE WASTE DURING 5 DAY DRAW DOWN PERIOD' 2
'While this section deals with hydraulic loading capacities, applications cannot exceed
agronomic rate for receiving crop according to its certified waste plan.
2Fields with no remaining PAN balance, no receiving crop, and/or completely saturated are
not considered available to receive waste.
p. tract #
q. field #
r. soil type
s. crop
t. acres
u. remaining
IRR-2 PAN
balance
(lb/acre)
v. maximum
application rate
(in/hr)
w. maximum
application
amount (inches)
4696
19A
NoB
overseed graze
1.91
25
0.5
4696
19B
NoB
overseed graze
2.92
25
0.5
4696
6 A and B
NoA
overseed graze
5.00
25
0.5
4696
7A
NoA
overseed graze
1.00
25
0.5
4696
7B
NoA
overseed graze
2.50
25
0.5
4696
7C
NoA
overseed graze
2.50
25
0.5
4696
9A
GbA
overseed graze
1.85
25
0.5
4696
9B
GbA
overseed graze
2.75
25
0.5
4696
14A
WaB
overseed graze
3.70
25
0.5
4696
14B
WaB
overseed graze
3.60
25
0.5
4696
15A
WaB
overseed graze
3.30
25
0.5
4696
15B
WaB
overseed graze
3.30
25
0.5
x. total acres available during 5 day draw down (sum of column t) = 34.33 acres
IV. FACILITY'S PoA OVERALL HYDRAULIC LOAD TO BE LAND APPLIED PER ACRE
y. line o = 0.17 inches per acre to be applied within 5 days
line x
If hydraulic load listed in line y, list course of action here including pump
and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options,
recalculate new hydraulic load based on new information.
Plan to land apply hydraulic load:
1. Describe moisture conditions of fields? (e.g. Is there water standing in field; does irrigation
equipment mar down in field; "trafficability" across soils; will soils absorb application without runott, etc.
Fields are still wet. Will pump on dryest fields first.
2. Date and amount of last rainfall event?
DATE: 1 02/22/21
3. Uates of last waste application event per vela:
AMOUNT: 0.30 inches
4. Given optimum soil and weather conditions, is irrigation equipment capable of applying the volume in
line "n" at appropriate seasonal (i.e. winter) application rates within t) aays-�
If fields dry out and no more rain, can get back in compliance.
.ri Irrinatinn cr.htzrlidt= fnr next 5 dav-. - include daily schP_dule' nronnsed application rates and amounts
per irrigation event; changes made in gun sizes, nozzles, "o" rings, operating time, travel speed, etc. to
meet proposea changes in application rates ana arneunis, a[JU any Ut.ne► iniUttrtauUtt tut L;unWuctauuti.
Will pump as fields dry out.
PoA (5 Day) 2/21 /00
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
FIVE (5) DAY DRAW DOWN PERIOD
I. TOTAL VOLUME TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/Identifier (ID): I David Gooden 1
2. Current liquid volume in structural freeboard
a. current liquid level according to marker 10.0 inches
b. designed structural freeboard zone 12.0 inches
(Normally 12 inches or greater)
c. line b - line a (inches within structural freeboard) = 2.0 inches
d. top of dike surface area according to design
(area at below structural freeboard elevation) 95836 ft2
e. line c/12 x line d x 7.48 gallons/W 119476 gallons
3. Projected volume of waste liquid produced during draw down period
f. temporary storage period according to structural design 180 days
g. volume of waste produced according to structural design 145388 Ift3
h. current herd # 1 4410 certified herd #1 4410
actual waste produced = current herd # x line g =
certified herd #
i. volume of wash water according to structural design
j. excess rainfall over evaporation according to design
k. (lines h + i + j) x 7.48 x 5 days/line f =
4. Total volume of waste to be land applied during 5 day draw down
I. total volume to be land applied line e + line k =
145388 ft'
ft3
58333 1ft3
42329 gallons
161804 gallons
REPEAT SECTION 1 FOR EACH WASTE STRUCTURE ON SITE WITH A LIQUID LEVEL WITHIN
THE STRUCTURAL FREEBOARD ELEVATIONS. (Click on the next Structure tab shown below)
PoA (5 Day) 2/21 /00