Loading...
HomeMy WebLinkAbout090131_POA_20210224Facility Name: PLAN OF CTOM (RDA) FOR c=GGH FRMAAT I FACill Fac.oloty Number: j u L f Y (1 ; DC) � . sf cf � E }1f,V s. t THS Certified Operator Name: LEA An > i�i `�, �'ii ,�. t r�, c_! 1. Current liquid level(s) in inches as measured from the current liquid Level in the lowest point oil the top of the dam for lagoons without spillways; and from ther lagoon to the in the lagoon to the bottom of the spillway for lagoons with spillways, curi enT liquid level Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Lagoon Name/Identifier (ID): Spillway (Yes or No); Level (inches): 2. Check all applicable items otnsfbr) Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. Liquid level is within the 25 year 22; hour storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste to pumped and hauled is reflected in section III tables. Included within this plan is a list of the proposed sites with related facility number(s), number acres and receiving crop information. Contact and secure��: � the approval fr.m the Division of Water Quality prior to transfer of waste to a site not covered in the facility's certified animai waste management � plane Operation will be partially or fully depopulated. attach a complete schedule with corresponding animal units and dates for depopulation - if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3. Earliest possible date to begin land application of waste: hereby certify that L have reviewed the information listed above and included within the attached Milan of Action, and to the best of my knowiedQe and ability, the information is accurate and correct. Facility Ovgierrfiifianager (print) VA Facility Owner/Manager (signature) Phone: r 0 t �. C.'l, PoA Cover Page 2/21/00 II. TOTAL VOLUME OF WASTE STORED WITHIN STRUCTURAL FREEBOARD ELEVATIONS FOR ALL WASTE STRUCTURES FOR FACILITY 1. structure ID: 2. structure ID: 3. structure ID: 4. structure ID: 5. structure ID: 6. structure ID: White Plains 0 n. lines 1 +2+3+4+5+6= o. line n / 27154 = line I = 74913 gallons line I = gallons line I = gallons line I = gallons line I = gallons line I = gallons 74913 gallons 2.76 acre -inches III. TOTAL ACRES AVAILABLE TO RECEIVE WASTE DURING 5 DAY DRAW DOWN PERIOD1'2 'While this section deals with hydraulic loading capacities, applications cannot exceed agronomic rate for receiving crop according to its certified waste plan. 2Fields with no remaining PAN balance, no receiving crop, and/or completely saturated are not considered available to receive waste. p. tract # q. field # r. soil type s. crop t. acres u. remaining IRR-2 PAN balance (lb/acre) v. maximum application rate (in/hr) w. maximum application amount (inches) 4742 1 ExA overseed 5.35 30 0.35 1 4742 2 ExA overseed 4.51 30 0.35 1 **guestimate on PAN*** x. total acres available during 5 day draw down (sum of column t) = 9.86 acres IV. FACILITY'S PoA OVERALL HYDRAULIC LOAD TO BE LAND APPLIED PER ACRE y. line o = line x 0.28 inches per acre to be applied within 5 days If unable to land apply hydraulic Toad listed in line y, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new hydraulic load based on new information. is adding fields in a temporary amendament for additional pumping PoA (5 Day) 2/21/00 Plan to land apply hydraulic load: 1. Describe moisture conditions of fields? (e.g. Is there water standing in field; does irrigation equipment mar down in field; "trafficability" across soils; will soils absorb application without runoff, etc.) fields are still wet hopefully will dry out later this week. Aerwayed on added field in a temporary amendment near the farm. Are selecting the dryest loactions to pump for 15 minutes or so.. Plans to irrigate this week. 2. Date and amount of last rainfall event? DATE: 3. Dates of last waste application event per field: 02/19/21 AMOUNT: —4 inches aerway Monday and Tuesday. ran solid set about 15 minutes two days. 4. Given optimum soil and weather conditions, is irrigation equipment capable of applying the volume in line "n" at appropriate seasonal (i.e. winter) application rates within 5 days? Hopefully depending on how quickly fields dry out. Aerwaying on temporary amendment field. 5. Irrigation schedule for next 5 days - include daily schedule; proposed application rates and amounts per irrigation event; changes made in gun sizes, nozzles, "o" rings, operating time, travel speed, etc. to meet proposed changes in application rates and amounts; and any other information for consideration. No changes to equipment. Plan using solid set this rest of this week as field conditions allow. PoA (5 Day) 2/21/00 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES FIVE (5) DAY DRAW DOWN PERIOD I. TOTAL VOLUME TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): White Plains 2. Current liquid volume in structural freeboard a. current liquid level according to marker b. designed structural freeboard zone (Normally 12 inches or greater) c. line b - line a (inches within structural freeboard) = d. top of dike surface area according to design (area at below structural freeboard elevation) e. line c/12 x line d x 7.48 gallons/ft3 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design g. volume of waste produced according to structural design h. current herd # 6060 certified herd # 10.0 12.0 inches inches 2.0 inches 48000 ft2 59840 gallons 180 44543 6060 actual waste produced = current herd # x line g = certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 5 days/line f = 4. Total volume of waste to be land applied during 5 day draw down I. total volume to be land applied line e + line k = days ft3 44543 ft3 0 28000 ft3 ft3 15073 gallons 74913 gallons REPEAT SECTION 1 FOR EACH WASTE STRUCTURE ON SITE WITH A LIQUID LEVEL WITHIN THE STRUCTURAL FREEBOARD ELEVATIONS. (Click on the next Structure tab shown below) PoA (5 Day) 2/21/00