Loading...
HomeMy WebLinkAbout820303_Structure Evaluation Inspection_20210112e �li�121 o;oOJ ?7/ Structure Evaluation Inspection Facility Number: Ba_ Date: i 1 L Time in: j 0 l O Time out: 10 0 Farm Name: WCUU 2,0 Farm 911 address: Owner Name: c4ct1 e L a t e r`> Phone Facility Contact: Onsite Representative: Integrator:CA ifhfj-e 14 Certified Operator: Cert. Number Is storage capacity less than adequate? Yes No If yes is waste level into the structural freeboard? Yes ` No Was non -compliant level reported to DWR POA received Structure: 1 2 3 4 5 6 Identifier: 2_ Spillway? Designed Freeboard (in.): Observed Freeboa d (in.): 1 i v, Nete (co ) Are there any immediate threats to t Mi to . rit of of the structures g Y any observed? Yes No . �cortoeS Do any structures lack adequate markers as required by the permit? Yes Does any part of the waste. management system need repair Yes No Condition of field's .�.�_ re ceiving of crop I Vie of Comments: