HomeMy WebLinkAbout820303_Structure Evaluation Inspection_20210112e �li�121
o;oOJ ?7/
Structure Evaluation Inspection
Facility Number: Ba_ Date: i 1 L
Time in: j 0 l O Time out: 10 0
Farm Name: WCUU
2,0
Farm 911 address:
Owner Name: c4ct1 e L a t e r`> Phone
Facility Contact:
Onsite Representative: Integrator:CA ifhfj-e 14
Certified Operator: Cert. Number
Is storage capacity less than adequate? Yes No
If yes is waste level into the structural freeboard? Yes ` No
Was non -compliant level reported to DWR
POA received
Structure: 1 2 3 4 5 6
Identifier: 2_
Spillway?
Designed Freeboard (in.):
Observed Freeboa d (in.): 1 i v,
Nete (co )
Are there any immediate threats to t Mi to . rit of of the structures
g Y any
observed? Yes No . �cortoeS
Do any structures lack adequate markers as required by the permit? Yes
Does any part of the waste. management system need repair Yes No
Condition of field's .�.�_
re
ceiving of crop I Vie of
Comments: