HomeMy WebLinkAbout20120523 Ver 1_Staff Comments_2012082012 -0523 Riverbrooke — Phases II -IV — SW CONDITION
AML comments
August 20, 2012
1. Stormwater Management Plan (Approval by the DWQ Stormwater Unit required.)
You are required to obtain approval from the DWQ Stormwater Unit before any
impacts authorized in this certification occur. The SMP may not be modified without
prior written authorization from the DWQ Stormwater Unit. A copy of the approval
letter and the modified SMP must be submitted to the DWQ Webscape Unit prior to
the commencement of the modifications.
Lucas, Annette
From:
Lucas, Annette
Sent:
Monday, August 20, 2012 11:25 AM
To:
Turlington, Chad
Cc:
Lucas, Annette
Subject:
RE: Riverbrooke SD; S &EC Job No. 9087; DWQ No. 12 -0523
Attachments:
12 -0523 Riverbrooke — Phases II-IV — SW CONDITION.docx
Chad,
I was working on it when I received your email! I wrote a very short one because the SW unit will take care of all the
details we usually put into our certification (and actually will be a lot more detailed about it). Let me know if you think it
looks OK.
Thanks,
A
From: Turlington, Chad
Sent: Monday, August 20, 2012 11:18 AM
To: Lucas, Annette
Subject: RE: Riverbrooke SD; S &EC Job No. 9087; DWQ No. 12 -0523
Annette,
Do you have some example language for this condition?
From: Lucas, Annette
Sent: Thursday, August 16, 2012 12:09 PM
To: Nikki Thomson
Cc: dbcooper @mkrinc.com; Turlington, Chad; Lowther, Brian
Subject: RE: Riverbrooke SD; S &EC Job No. 9087; DWQ No. 12 -0523
Nikki,
An approval from the SPU will meet the 401 stormwater conditions as well. I just spoke with Brian and he is awaiting a
response to his latest comments on the stormwater management plan (due tomorrow). I will ask Chad to approve the
project with a condition that they obtain their approval from the SPU prior to impacts.
Thanks,
Annette
From: Nikki Thomson [mailto:nthomson(aOsandec.com]
Sent: Monday, August 13, 2012 10:42 AM
To: Lucas, Annette
Cc: dbcooper @mkrinc.com
Subject: Riverbrooke SD; S &EC Job No. 9087; DWQ No. 12 -0523
Hi Annette!
I wanted to bring this project back around again. Back in June, DWQ placed the project on hold for
Stormwater requirements. I wanted to let you know that Douglas Cooper (cc -ed on this email) — who is the
Project Engineer for Riverbrook — submitted a packet to Brian Lowther with the DENR Stormwater Permitting Unit
to satisfy the Phase II requirements. I was wondering if by chance this submittal to the SPU would satisfy the
1 1
DWQ 401 stormwater conditions? If that is the case, is there any chance you would be willing to check in with
Bryan related to that submittal? I don't want this project to be returned because you all think we aren't
working to move it forward; I didn't know about the submittal to the SPU until this morning.
Please advise if there is something else you'd like /need us to do, ok?
Thanks so much!
Nik
Nicole Thomson
Regulatory Specialist
foil & Environmental Consultants, PA
I 10 1 o Raven Ride Road
Raleigh, NC 27614
E -Mail: NThomson @5andEC.com
Phone: (919) 846 -5900
Fax: (9 19) 846 -9467
MOIDile: (919)723-0085
Visit us at 5andEC.com
This electronic communication, including all attachments, is intended only for the named addressee (s) and may contain
confidential information. This electronic communication may not have passed through our standard review /quality control
process. Design data and recommendations included herein are provided as a matter of convenience and should not be used for
final design. Rely only on final, hardcof+y materials bearing the consultant's original signature and seal. If you are not the named
addressee (s), any use, dissemination, distribution or copying of this communication is prohi6ited. If you have received this
electronic communication in error, please notify the sender by return e -mail and delete the original communication from your
system. Thank you.