HomeMy WebLinkAbout20210547 Ver 1_CAMA Application_20210226ROY COOPER Governor MICHAEL S. REGAN Secretary BRAXTON C. DAVIS Director February 26, 2021 MEMORANDUM. NORTH CAROLINA Environmental Quality FROM: Gregg Bodnar, Assistant Major Permits Coordinator NCDEQ - Division of Coastal Management 400 Commerce Ave., Morehead City, NC 28557 Fax: 252-247-3330 (Courier 04-16-33) gregg.bodnar@ncdenr.gov SUBJECT_ CAMA/Dredge & Fill Application Review Applicant: Charles and Doris Hudnall Project Location: 226 Mulberry Hill Lane in Chowan County Proposed Project: Bulkhead replacement and repair storm damaged pier Please indicate below your agency's position or viewpoint on the proposed project and return this form to GreggBodnarat the address above by March 19, 2021. If you have any questions regarding the proposed project, contact Cynthia Rountree (252-264-3901, ext. 234) when appropriate, in- depth comments with supporting data is requested. REPLY: This agency has no objection to the project as proposed_ **Additional comments may be attached** PRINT NAME AGENCY SIGNATURE DATE This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. NOfli ri D E Q om�// ibwrtnent of &rvhmvyvtfer qwi� North Carolina Department of Environmerntal Quality I Division of Coastal Management Elizabeth City Office 1 401 South Griffin Street, Suite 300 1 Elizabeth City, North Carolina 27909 252,264.3901 DIVISION OF COASTAL MANAGEMENT FIELD INVESTIGATION REPORT 1. APPLICANT'S NAME: Charles and Doris Hudnall 2. LOCATION OF PROJECT SITE: 226 Mulberry Hill Lane, Edenton, Chowan County, adjacent to Albemarle Sound Latitude: 36' 0'32.13"N Longitude: - 76°31'57.57"W 3. INVESTIGATION TYPE: CAMA & Dredge and Fill 4. INVESTIGATIVE PROCEDURE: Dates of Site Visit — July 17, 2020 Was Applicant Present — yes 5. PROCESSING PROCEDURE: Application Received Complete — February 22, 2021 Office — Elizabeth City 6. SITE DESCRIPTION: (A) Local Land Use Plan — Chowan County Land Classification From LUP — R-25 Medium Density Residential (B) AEC(s) Involved: Public Trust Area, Estuarine Waters, Estuarine Shorelines (C) Water Dependent: Yes (D) Intended Use: Private/Community (E) Wastewater Treatment: Existing — on site septic system Planned - NIA (F) Type of Structures: Existing — Single family residence, bulkhead, pier, boathouse with a boatlift, riprap Planned - replacement bulkhead, repairs to dock (G) Estimated Annual Rate of Erosion: NIA Source - 7. HABITAT DESCRIPTION: [AREA] DRFDGFD FILLED SHADED (A) Shallow Bottom (EW, PTA) 735 sgft (B) Open Water (EW, PTA) (C) High Ground (ES) 3,340 sqft (D) Total Area Disturbed: 4,075 square feet (E) Primary Nursery Area: No (F) Water Classification: SB Open to shellfishing: No Charles and Doris Hudnall Field Investigation Report Page 2 PROJECT SUMMARY: The applicant proposes to construct a replacement bulkhead two feet waterword of the existing alignment for 104 feet and seven feet out for 81 feet. Additionally, repairs are proposed to an existing storm damaged docking facility. Proiect Setting The property proposed for development is located at 226 Mulberry Hill Lane in Chowan County and consists of approximately 54,014 square feet or 1.24 acres, and is adjacent to the Albemarle Sound. The property currently contains a single family residence, a storm damaged pier with a platform and boatlift, a failing bulkhead and riprap along the shoreline. The property to the east is a single family residence and the property to the west is a vacant lot. Vegetation on the site includes, but is not limited to, indigenous yard grasses, ornamental Shrubs and trees. Soil Types include Yeopim Loam (YeB) and Chapanoke Silt (Ch). The property has an elevation of approximately 4-11 feet above normal water level (NWL) along the shoreline. The shoreline is 185 feet in length and is irregularly shaped due to that approximately half the width of the property is recessed approximately 22 feet landward of the other half. It has been hardened by a failing bulkhead along its entirety and riprap exists in front of approximately 81 feet. The water classification for this area is Primary Recreation, Salt Water (SB), and are coastal waters that are closed to shellfishing. The water depths along the alignment average - 3.5 feet. Submerged Aquatic Vegetation (SAV) was not observed growing within the proposed alignment. Development Proposal The applicant proposes to replace an existing 185 foot bulkhead 2 foot out from the existing alignment along 104 feet of the bulkhead and 7' along the other 81 feet. The existing riprap will be removed and used as backfill material. The applicant also proposes to replace the 16 foot by 16 foot platform that was destroyed by Hurricane Isaias as well as make minor repairs to the existing boathouse, boatlift and raise the existing 62 foot by 6 foot pier using the existing piles. Bulkheading and tie -back installation will require a disturbance area 20 foot landward of the existing bulkhead. Anticipated Impacts The proposed development will result in the filling of 735 square feet of Estuarine Waters and Public Trust Areas of Environmental Concern. It will also result in the disturbance of 3,340 square feet of Estuarine Shorelines Area of Environmental Concern. Temporary turbidity will possibly occur during construction. Submitted by: Cynthia Rountree Date: 2/22/21 MAJOR PERMIT APPLICATION - BULKHEAD REPLACEMENT RECEIVE® CHARLES & DORIS HUDNALL FEB 2 2 2021 226 MULBERRY HILL LNDCM-EC EDENTON, NC 27932 1. HISTORY a. In 1999 when we first considered purchasing lot 87 in Mulberry Hill Plantation, most waterfront lots, including Lot 87, were 100 feet wide. Since Lot 87 was, at the time, the last building lot on the east end, the existing bulkhead ran about 13' beyond the boundary (see black line on Drawing # 1). There was, however, another 60 foot parcel on the east end of the development and we negotiated with the Wood family to purchase this section also. This 60 feet of waterfront had no shoreline stabilization at the time. The purchase of the full, expanded lot was completed on June 23, 1999. A copy of the deed is included in this package b. On or about July 12, 2000, after consulting with a CAMA representative, we had approximately 163 tons of rip -rap delivered and placed on the unprotected 60' of waterfront. (See green circles on the Drawing #1). c. In July, 2004, we built a 64' pier with a 16xl6' platform and a 24' x 12' boat lift. Work was done by Cahoons Marine Construction (from Bath, NC?), under CAMA General Permit A38265. (See Drawing #2) d. During the 4-5 years after we purchased the lot and built a house, the riparian neighbor on the east showed little interest in their property and refused to make any effort to stabilize the shoreline. Numerous storms were eroding their lot at a rapid rate, averaging about 8 feet per year. By 2005, this erosion was threatening our property, possibly even our house. In July, 2005, Joe Riddick Marine Construction, Hertford, NC, installed a new bulkhead across our remaining 45-50 feet of waterfront, and installed a wing wall of approximately 40 feet back into our lot along the property line. This work was done under CAMA General Permit A40888. (See red line on Drawing #2). In order to install the waterfront bulkhead, Riddick moved most of the existing rip -rap to the west (see red dots on Drawing #2). e. No further additions were made between 2005 and 2020. The adjoining properties on each side of us have changed ownership. Tommy Wood, on the east, has added a bulkhead to stabilize that lot. Paul Halla, on the west, has recently installed a new vinyl bulkhead and our proposed design is similar to his. II. PROPOSED PROJECT a. REPLACEMENT OF BULKHEAD RECEIVED FEB 2 2 2021 DCM-EC From what I have seen in this neighborhood, nearly everyone is facing the same set of problems. The current bulkheads are aging and beginning to fail; the mean water level is at least 12" higher than it was fifteen years ago; even minor storms create significant overwash into the lot; and we seem to get more "named" storms than in years past. My five closest neighbors to the west have all replaced their bulkheads within the past two years. On the western half of the lot, my proposal is to install a vinyl bulkhead, one -to -two feet outside the current bulkhead, and approximately two feet higher than the current bulkhead. These dimensions will allow a seamless joint with my western riparian neighbor's new bulkhead. The reason that I am making a MAJOR PERMIT application is that I propose to build the western portion of the new bulkhead outside some existing rip -rap. This rip -rap is both above and below the waterline and is outside the current bulkhead. In this position, the rip -rap provides no significant benefit. It no longer improves waterfront stabilization; but it seems to attract and trap any trash or fallen trees moving up and down the shoreline, and it provides stepping stones for waves to overwash the bulkhead. The one beneficial purpose for which I can use the rip -rap is to provide 30-40% of the fill material that would be required behind the proposed bulkhead. Specifically, on the eastern half of the lot, I propose to build the new bulkhead parallel to the existing bulkhead, and 7 feet outside the current bulkhead. A short distance before reaching the property line on the east, we will turn the bulkhead 90 degrees to the north to meet the old bulkhead. We will extend this northward section through the old bulkhead and approximately ten feet into our yard to provide protection from east wind and waves. See Drawing #3. This eastern section will create a "fill -area" of approximately 565 sq ft. behind the new bulkhead, to be back -filled with new soil and the existing rip -rap. . Drawing 94 shows a cross-section of the proposed bulkhead, with water depths and the height of the current and proposed bulkhead. RECEIVED II. PROPOSED PROJECT (continued) F EB 2 2 2021 b. REPAIR OF PIER, W/ PLATFORM and BOAT LIFT DCM-EC As previously mentioned, we have had this structure since 2004. Hurricane Isaias severely damaged a large portion of it. Only the boat lift appears to still be largely intact. The platform was demolished; the only pieces remaining are the pilings upon which the platform was built. The walkway providing access to the platform and to the boatlift has been damaged extensively. Several 8-foot sections are gone entirely and several other support beams are broken. While this will largely be a repair project, there are some design changes that I will mention. Since the new bulkhead will be roughly two feet higher than the current bulkhead, I propose to also raise the walkway by two feet. This will allow the walkway to clear the bulkhead, and more importantly, put the walkway two feet higher above the waves. The second change is that I plan to use "thru-flow" type of decking to lessen the destructive impact of the wave action. I have previously used the "thru-flow" decking for the first fifteen feet of the pier and it has worked very successfully. RECEIVED OTHER REQUIRED INFORMATION FEB 2 2 2021 Wetland Delineation Approval NIA - No wetlands within the area. Stormwater Management Plan There will be no increase in built -upon areas of the property. Ocean and Inlet Hazard Notices The project does not fall within any oceanfront or inlet areas. The project proponent hereby certifies that all information contained herein is true, accurate, and complete to the best of my knowledge and belief. The project proponent hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time. BOB MP-1 APPLICATION for -�. Major Development Permit BAN 15 2021 (last revised 12I27106j �-y�p AO� North Carolina I ASTAL MANAGEMENT 1. Primary Applicant(Landowner Information Business Name Project Name (if applicable) NIA HUDNALL VINYL BULKHEAD Applicant 1: First Name MI Last Name CHARLES W HUDNALL Applicant 2: First Name Mt Last Name DORIS E HUDNALL If additional applicants, please attach an additional page(s) with names listed. Mailing Address PO Box City State 226 MULBERRY HILL LN NIA Edenton NC ZIP Country Phone No. FAX No. 27932 9257 US 252 - 333 - 2228 ext. NONE - - Street Address (if different from above) City State ZIP SAME - Email ROCKATAO@AOL.COM 2. Agent/Contractor Information Business Name NIA Agent) Contractor 1: First Name MI Last Name JOSEPH E RIDDICK Agent) Contractor 2: First Name MI Last Name NIA Mailing Address PO Box City State 167 RIVERSIDE DR 215 Hertford NC ZIP Phone No. 1 Phone No. 2 27944 252 - 426-- 1288 ext. 252 - 333 - 7854 ext. FAX No. Contractor # 252 426 1288 NIA Street Address (if different from above) City State ZIP SAME - Email NONE <Form continues on back> 252-808-2808 .. 1-888-411RCOAST . www.nccaastalrnanagement.nret Form DCM MP-1 (Page 2 of 4) RECEIVED APPLICATION for Major Development Permit 4. Site Description a. Total length of shoreline on the tract (ft.) b. Size of entire tract (sq.ft.) 185 54,014 c. Size of individual lot(s) d. Approximate elevation of tract above NHW (normal high water) or NIA, I I NWL (normal water level) (If many lot sizes, please affach additional page with a list) 4-11 ft ❑NHW or ®NWL e. Vegetation on tract RESIDENTIAL LAWN, 3 TREES, FOUNDATION SHRUBS f. Man-made features and uses now on tract RESIDENTIAL HOME with ATTACHED GARAGE, DRIVEWAY, PIER WBOAT LIFT, WOODEN BULKHEAD g. Identify and describe the existing land uses adjacent to the proposed project site. EAST: BUILDING LOT- HEAVILY WOODED WEST: RESIDENTIAL HOME h. How does local government zone the tract? i. Is the proposed project consistent with the applicable zoning? R25 (Attach zoning compliance certificate, if applicable) ❑Yes ❑No ®NA j. is the proposed activity part of an urban waterfront redevelopment proposal? ❑Yes ®No k. Hasa professional archaeological assessment been done for the tract? If yes, attach a copy. ❑Yes ❑No ®NA If yes, by whom? I. Is the proposed project located in a National Registered Historic District or does it involve a ❑Yes ❑No ®NA National Register listed or eligible property? Form continues on next pages 252-808-2808 — 1-888-4RC OAST �ra��ne. r����st�:rnanagetrtee�t.tr�t Form DCM MP-1 (Page 3 of 4) APPLICATION for RECEIVED m. 0) Are there wetlands on the site? (ii) Are there coastal wetlands on the site? (iii) If yes to either (i) or (ii) above, has a delineation been conducted? (Attach documentation, if available) JAN 15 Major Development Permit ❑Yes ®No ❑Yes ®No ❑Yes ❑No n. Describe existing wastewater treatment facilities. HOME SEPTIC FIELD, LOCATED 160' MINIMUM FROM ALBEMARLE SOUND, ON NORTH SIDE OF OUR HOME o. Describe existing drinking water supply source. CHOWAN COUNTY WATER P. Describe existing storm water management or treatment systems. NATURAL DRAINAGE 5. Activities and Impacts a. Will the project be for commercial, public, or private use? ❑Commercial ❑P ®PrivatelCommunity b. Give a brief description of purpose, use, and daily operations of the project when complete. REPLACE AGING BULKHEAD TO IMPROVE PROTECTION OF RESIDENTIAL LOT AND HOME, REPAIR EXISTING 80' PIER AND 24' x 12' BOATLIFT, DAMAGED IN HURRICANE ISAIAS. BOATLIFT IS USED TO HOUSE ONE PERSONAL WATERCRAFT, A 20' WELLCRAFT PLEASURE/FISHING BOAT. c. Describe the proposed construction methodology, types of construction equipment to be used during construction, the number of each type of equipment and where it is to be stored. INSTALLATION OF NEW VINYL BULKHEAD SHEETS, DRIVEN INTO THE SANDY BOTTOM, RISING 4.5 FEET ABOVE NWL (26" HIGHER THAN CURRENT BULKHEAD). PIER/BOATLIFT: REPAIR EXTENSIVE STORM DAMAGE TO PLATFORM AND WALKWAYS. ONE EXCAVATOR AND ONE LANDSCAPE TRACTOR ON -SITE FOR 2-3 WEEKS. d. List all development activities you propose. INSTALLATION OF NEW BULKHEAD, REPAIR OF PIER AND BOATLIFT. e Are the proposed activities maintenance of an existing project, new work, or both? BOTH f. What is the approximate total disturbed land area resulting from the proposed project? 4800 ®Sq.Ft or ❑Acres g. Will the proposed project encroach on any public easement, public accessway or other area ❑Yes ®No ❑NA that the public has established use of? h. Describe location and type of existing and proposed discharges to waters of the state. NATURAL RUNOFF OF RAINWATER. THIS PROJECT WILL NOT CHANGE THE CURRENT STATE. i. Will wastewater or stormwater be discharged into a wetland? ❑Yes ®No ❑NA If yes, will this discharged water be of the same salinity as the receiving water? ❑Yes ❑No ❑NA j. Is there any mitigation proposed? ❑Yes ❑No ®NA If yes, attach a mitigation proposal. <Form continues on backs 252-808-2800 1-0$8-4RCOAST s. www.agccoastalm anagement.net Form DCM MP-1 (Page 4 of 4) RECEIVED APPLICATION for Major Development Permit JAfl 15 2021 S. Additional Information In addition to this completed application form, (MP-1) the following items below, if aff��Q st itted in order for the application package to be complete. Items (a) — (0 are always applicable to any major developA'rel� �o se consult the application instruction booklet on how to properly prepare the required items below. a. A project narrative. b. An accurate, dated work plat (including plan view and cross -sectional drawings) drawn to scale. Please give the present status of the proposed project. Is any portion already complete? If previously authorized work, clearly indicate on maps, plats, drawings to distinguish between work completed and proposed. c. A site or location map that is sufficiently detailed to guide agency personnel unfamiliar with the area to the site. d. A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected properties. e. The appropriate application fee. Check or money order made payable to DENR. f. A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such owners have received a copy of the application and plats by certified mail. Such landowners must be advised that they have 30 days in which to submit comments on the proposed project to the Division of Coastal Management. Name PAUL HALLA, JR Phone No. 919-219-1612 Address 224 MULBERRY HILL LN; EDENTON, NC 27932 Name TOMMY & JANE WOOD Phone No. 252-509-1450 Address 206 MULBERRY HILL LN; EDENTON, NC 27932 Name NIA Phone No. Address g. A list of previous state or federal permits issued for work on the project tract. Include permit numbers, permittee, and issuing dates. A38265 WALTER CAHOON 2004 A40888 JOE RIDDICK 2005 h. Signed consultant or agent authorization form, if applicable. i. Wetland delineation, if necessary j. A signed AEC hazard notice for projects in oceanfront and inlet areas. (Must be signed by property owner) k. A statement of compliance with the N.C. Environmental Policy Act (N.C.G.S. 113A 1-10), if necessary. If the project involves expenditure of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act. 7. Certification and Permission to Enter on Land I understand that any permit issued in response to this application will allow only the development described in the application. The project will be subject to the conditions and restrictions contained in the permit. I certify that I am authorized to grant, and do in fact grant permission to representatives of state and federal review agencies to enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up monitoring of the project. I further certify that the information provided in this application is truthful to the best of my knowledge. Date JAN 13. 2021 Print Name jCHAR�L{ES �W. HUDNALL Signature LflCif�1 Lr/ /�iGbd;,�lPi Please indicate application attachments pertaining to your proposed project. ®DCM MP-2 Excavation and Fill Information ❑DCM MP-5 Bridges and Culverts ❑DCM MP-3 Upland Development ®DCM MP-4 Structures Information -1-888-4RCOAST vvwrwr.nr-coasEalmanagernent.net Form DCM MP-2 EXCAVATION and FILL RECEIVED FEB 1 0 2021 (Except for bridges and culverts) CM -EC Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. Describe below the purpose of proposed excavation and/or fill activities. All values should be given in feet. Access Other Channel (NLW or Canal Boat Basin Boat Ramp Rock Groin Rock (excluding Breakwater shoreline NWL) stabilization) Length NA NA NA NA NA NA NA Width Avg. Existing Depth NA NA Final Project Depth NA NA XCAVVMAr ount ofto be excavated from below NHW or NWL in b. Type of material to be excavated. cubic yards. C. (i) Does the area to be excavated include coastal wetlands/marsh d. High -ground excavation in cubic yards. (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV ❑SB ❑WL ❑None (ii) Describe the purpose of the excavation in these areas: 2. DISPOSAL OF EXCAVATED MATERIAL ®This section not applicable a. Location of disposal area. b. Dimensions of disposal area. C. (i) Do you claim title to disposal area? d. (i) Will a disposal area be available for future maintenance? ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA (ii) If no, attach a letter granting permission from the owner. (ii) If yes, where? e. (i) Does the disposal area include any coastal wetlandsimarsh f. (i) Does the disposal include any area in the water? (CW), submerged aquatic vegetation (SAV), shell bottom (SB), ❑Yes ❑No ❑NA or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. (ii) If yes, how much water area is affected? ❑CW ❑SAV ❑SB ❑VVL ❑None (4) Describe the purpose of disposal in these areas: Form DCM MP-2 (Excavation and Fill, Page 2 of 2) 3. SHORELINE STABILIZATION El This section not applicable (If development is a wood groin, use MP-4 — Structures) a. Tvpe of shoreline stabilization: b. Lenoth: 4eT ' 55' cm ®Bulkhead ❑Riprap ❑Breakwaterlsili ❑Other: c. Average distance waterward of NHW or NWL: 4' 6" e. Type of stabilization material: VINYL BULKHEAD g. Number of square feet of fill to be placed below water level. Bulkhead backfill 735 Riprap Breakwater/Sill Other i. Source of fill material. GEORGE COWAND; MERRY HILL, NC Width: 1'6" d. Maximum distance waterward of NHW or NWL: DiCM. - EC f. (i) Has there been shoreline erosion during preceding 12 months? ®Yes ❑No ❑NA (4) If yes, state amount of erosion and source of erosion amount information. CURRENTLY. OVERWASH CREATING HOLES IN LAWN h. Type of fill material. SOIL AND EXISTING RIPRAP 4. OTHER FILL ACTIVITIES ® This section not applicable (Excluding Shoreline Stabilization) a. (i) Will fill material be brought to the site? ❑Yes ❑No ❑NA b. If yes, (ii) Amount of material to be placed frl the water (iii) Dimensions of fill area (iv) Purpose of fill (i) Will fill material be placed in coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), she[[ bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected_ ❑CW ❑SAV ❑SB OWL ❑None (6) Describe the purpose of the fill in these areas: 5. GENERAL a. How will excavated or fill material be kept on site and erosion b. What type of construction equipment will be used (e.g., dragline, controlled? backhoe, or hydraulic dredge)? CONTAINED BY NEW VINYL BULKHEAD EXCAVATOR C. (i) Will navigational aids be required as a result of the project? ❑Yes ®No ❑NA (ii) If yes, explain what type and how they will be implemented. FEB 8, 2021 Date HUDNALL VINYL BULKHEAD Project Name d. (i) Will wetlands be crossed in transporting equipment to project site? ❑Yes ®No ❑NA (ii) If yes, explain steps that will be taken to avoid or minimize environmental impacts. CHARLES W. HUDNALL Applicant Name Applicant Signature In RECEIVED Form DCM MP-4 STRUCTURES (Construction within Public Trust Areas) FEB 1 0 2021 Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. 1. DOCKING FACILITY/MARINA CHARACTERISTICS a. (i) Is the docking facility/marina: ❑Commercial ❑Public/Government ❑Private/Community c. (i) Dock(s) and/or pier(s) (H) Number (iii) Length (iv) Width (v) Floating ❑Yes ❑No e. (i) Are Platforms included? ❑Yes ❑No If yes: (ii) Number (iii) Length (iv) Width (v) Floating ❑Yes ❑No Mote: Roofed areas are calculated from dripline dimensions. g (i) Number of slips proposed (ii) Number of slips existing i. Check the proposed type of siting: ❑ Land cut and access channel ❑Open water; dredging for basin and/or channel ❑Open water; no dredging required ❑Other; please describe: k. Typical beat length: m. (i) Will the facility have tie pilings? ❑Yes ❑No (ii) if yes number of tie pilings? ®This section not applicable b. (i) Will the facility be open to the general public? ❑Yes ❑No d. (i) Are Finger Piers included? ❑Yes ❑No If yes: (ii) Number (iii) Length (iv) Width (v) Floating ❑Yes ❑No f. (i) Are Boatlifts included? ❑Yes ❑No If yes: (ii) Number (iii) Length (iv) Width h. Check all the types of services to be provided. ❑ Full service, including travel lift and/or rail, repair or maintenance service ❑ Dockage, fuel, and marine supplies ❑ Dockage ("wet slips") only, number of slips- ❑ Dry storage; number of boats: ❑ Boat ramp(s); number of boat ramps: ❑ Other, please describe: j. Describe the typical boats to be served (e.g., open runabout, charter boats, sail boats, mixed types). I. (i) Will the facility be open to the general public? []Yes ❑No Form €iCM MP-4 (Structures, Page 2 of 4) 2. DOCKING FACILITY/MARINA OPERATIONS ®This section not applicable a. Check each of the following sanitary facilities that will be included in the proposed project. ❑ Office Toilets ❑ Toiiets for patrons; Number: Location: ❑ Showers ❑ Boatholding tank pumpout; Give type and location- b. Describe treatment type and disposal location for all sanitary wastewater. DCM-EC- r__ Describe the disposal of solid waste, fish offal and trash. d. How will overboard discharge of sewage from boats be controlled? e. (i) Give the location and number of "No Sewage Discharge" signs proposed. 00 Give the location and number of "Pumpout Available" signs proposed. f. Describe the special design, if applicable, for containing industrial type pollutants, such as paint, sandblasting waste and petroleum products. g. Where will residue from vessel maintenance be disposed of? h. Give the number of channel markers and "No Wake" signs proposed. Give the location of fuel -handling facilities, and describe the safety measures planned to protect area water quality. j. What will be the marina policy on overnight and live -aboard dockage? k. Describe design measures that promote boat basin flushing? I. If this project is an expansion of an existing marina, what types of services are currently provided? m. Is the marina/docking facility proposed within a primary or secondary nursery area? ❑Yes ❑No Ca4�l DCM MP-4 (Structures, Page 3 of 4, n. Is the marinaldocking facility proposed within or adjacent to any shellfish harvesting area? ❑Yes ❑Nc o. is the marinaldocking facility proposed within or adjacent to coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV ❑SB RECEIVED ❑WL [-]None p. is the proposed marina/dockingfacility located within or within close proximity to an shellfish leases? FEB 1 8 2021 tY p y y ❑Yes []No If yes, give the name and address of the leaseholder(s), and give the proximity to the lease. DCM—E jj�� � 3. BOATHOUSE (including covered lifts) ®This section not applicable a- (i) Is the boathouse structure(s): ❑Commercial ❑PuNic/Government ❑Private/Community (ii) Number (iii) Length (iv) Width Note: Roofed areas are calculated from dripfine dimensions. 4. GROIN (e.g., wood, sheetpile, etc. if a rock groin, use MP-2, Excavation and Fill.) ® This section not applicable a. (i) Number (ii) Length (iii) Width 5. BREAKWATER (e.g,, Wood, sheetpile, etc.) ®This section not applicable a. Length b. Average distance from NHW, NWL, or wetlands a. Maximum distance beyond NHW, NWL or wetlands 6. MOORING PILINGS and BUOYS a. Is the structure(s): ❑Commercial ❑Public/Government ❑PrivatelCommunity c. Distance to be placed beyond shoreline Note: This should be measured from marsh edge, if present. e. Arc of the swing 7. GENERAL ®This section not applicable b. Number d. Description of buoy (color, inscription, size, anchor, etc.) 252-808-2808 :: 1-888-4RCO AST :: vvvvw.nr-roastaimanagea ent.net revised:/2127106 Form IDCM MP-4 (Structures, Page 4 of 4) a. Proximity of structure(s) to adjacent riparian property lines b. Proximity of structure(s) to adjacent docking facilities. WEST:28' EAST:106' WEST: 85' EAST:195' Note: For buoy or mooring piling, use arc of swing including length of vessel. c- Width of water body 3.3 miles e_ (i) Will navigational aids be required as a result of the project? []Yes ®No []NA (ii) If yes, explain what type and how they will be implemented. d. Water depth at waterward end of structure at NLW or NWI- 4-5 ft RECEIVED FEB 1 0 2021 DCM-EC 8. OTHER ❑This section not applicable a. Give complete description: SECTION 3 - BOATHOUSE The pier, with a boatlift, is an existing structure that suffered extensive damage from Hurricane Isaias. All work on pier and boatlift will be repairs only; no new construction is being added. All pilings appear to be intact and in good condition. Changes will include raising the walkways approximately two feet (to be about 51 inches above NWL) and using "thru-flow'-type decking. FEB 8, 2021 Date HUDNALL VINYL BULKHEAAD Project Name CHARLES W. HUDNALL Applicant Name Applicant Signature 4-,v ,8 4RCGAST :, www.ncc;oastariman?a_gesrlgnt.net revised:/2127/06 R)£NTD§ 224 �a)£zJ� dab /» §� & � QPNC KL-J7 !£ a R PUM,42ze / ad 6 � o k±A2 /£�!� 8 IR 6 TY 6'00A #�J 05-17 I- K£ ®» &i:.I7 4. R 6Hf ON N -�4 = w 4iirr a #u a uAr £ -g AI-16e*4.4A#Lii5 A2ark§£Lcpr 2!£azASfPAVgp'Dzlv--y Avw:22 Alt- § 77 —, Z1Z £ify RECEIVED JAN 15 &21 DCM—EC £AIz of mz-3 Z791 &az 6& +e-7 , DSD ) zmz \ a & wz 6& H0,l,tPae & i4f 6wx£ F e.Lo & H.il.ZAtvz AP -oar ro 711E zzF—j £ a 4A sf P v p tvc44y RUDt4ALL WATEj!r9oN7` 141 TD9.11 199V -- 2oo3 DRAW TAG 1 OF' 4 DATC ; ocr 9 zij)zo V, WfS;T jV �r,H6cR JR%Y_ i OpsucA 61 i550M EZZ -- ass• 12Ei' 93' 93/IP' 7.5' �37, !f8' 4.9' 384' HOUSE , -WOW �! &;• 173' 5• 5". - 3.5 GJ A-r-;r -DE P7,q 5(x4K 1" ; 4o` RECEIVED )AN 15 2021 DCM-EC 1 EILEG ! ;TiRR:p / i iF ?A 91-C 4. 5-o1,4k stoic o { ..3D;i.k fG GRiGNVAL LOT j Lafri� �i� LFxr;FmvEp L6i y'tsrzf'FtASE RAP RAP ANDt-V WAS= IV914143�F— .lAcu t ¢ DATE ' OCT i, zoZo L-IT 128, 7s' Ll--47rss• 4.9. 3H.4' N04456 41mm jaevaighoMw 3L6' i7.3' i3,5' 8 P R QpO,Qa4o4 oQ°o P,v O `p RECEIVE® JAN 15 2021 ®CM'EC Sc�cr 1" - Rio Ff}ST owi,,tp tftr4,G Pll-rAr-P t C1is�S Tb Svl!t<g 5&m i� 1Y1.8�(? •!.o Cicc�uucl oc,q-r L!r i 1�0 -AL6EMAllL6 eSt3iwD Ooo 9VP9AP MoVED 'P3 WEST 200$ Q A Y ,r 4 TAT-IE - &r io_j 2C2c e 3c -75 Fbc j- � � � � � } Foc,-r du!:F iz Ak Pil 8vLKt!tAD |\� L 13 etm LE D 7) P T H RECEIVED ]AN 15 2071 lvmtjf 9. JAP9 biccv cyisr#rjc; ou�KJ4644D hb DNALL T3ill KNEA7 CQJSS--5�c:y�o�,1 4 DATE 9 Z81� FlA SANDY 0; ,TclPt RECEIVED JAN 15 2021 DCM—E (Sty ALSO FiciuRz 5) RECEIVED JAN 15 2021 DP -Ai► im6 5 ®f s 1Atl 13, 2021 W L Picrup-E 5 VATS: ; OCT 9 ?o;Zo u1VCH,4N"-xl As Or Dge 7, 2020 RECEIVE® )AID 15 2021 %00 F .b�R�L;A 2 _ S AT'E TAX 110 00 0.00 i Ci � ATE OF CARC A ESTATE" y iSE TAX $100.00 f Excise Tax TE OF I(1- AR:�_ _i L ESTATE FC15E TAX 4$100.00 L Ce 54PG 0 730 the oficc�" of Recording Time, Book and Page Tax Lot No. ........................................... Parcel Identifier No..a.... ^t- .�d..:�47. ........ Verified by......... ..._. County on the ..:........ day of ........ . by.............................................. ................. ............. Mail after recording to M..H..HOOD..ELLIS.'.'PO..BOX..220."ELIZABM...CITY,--NG..ZZ909.......-...... ..................... ._..-.---....-.------ .... ......................................... �.. �. . Mara.... ��.`c�i'Li!)'•3-ttY --� This instrument was prepared by .....M.H.HOOD RT[.IS..................................f `' COWAN.... ............... Brief description for the Index L,;1 i FOURTH TOWNSHIP NORTH CAROLINA GENERAL THIS DEED made this .23xd.... day of ............ JUNE....................... ..... ." -. , 19 ...9.9.., by and between GRANTOR THOMAS B. WOOD AND WIFE JANE S. WOOD e c SivcJ 0EC 9 - 2C'] GRANTEE CHARLES W. HUDNALL AND WIFE DORIS E. HUDNALL 1204 STONNELL PLACE ATXANDRIA, VA 22302 Enter in appropriate block for each party: name, address, and, if appropriate, character of entity, e.q. corporation or partnership. The designation Grantor and Grantee as used herein shall include said parties, their heirs, successors, and assigns, and shall include singular, plural, masculine, feminine or neuter as required by context. WITNESSETH, that the Grantor, for a valuable consideration paid by the Grantee, the receipt of which is hereby acknowledged, has and by these presents does grant, bargain, sell and convey unto the Grantee in fee simple, all that certain lot or parcel of land situated in the City of .................. .......... .... ..... . ................. FOURTH--- -- Township, CHOWAN ..................... . County, North Carolina and more particularly described as follows: SEE EXHIBIT "A" ATTACHED. A map showing the above described property is recorded in Plat Book _ -.._.- . _........ .......... page_ ... ............ .,...... TO HAVE AND TO HOLD the aforesaid lot or parcel of land and all privileges and appurtenances thereto belonging to the Grantee in fee simple. And the Grantor covenants with the Grantee, that Grantor is seized of the premises in fee simple, has the right to convey the same in fee simple, that title is marketable and free and clear of all encumbrances, and that Grantor will warrant and defend the title against the lawful claims of all persons whomsoever except for the exceptions hereinafter stated. Title to the property hereinabove described is subject to the following exceptions: 1. 1999 Chowan County taxes are to be prorated at closing. 2. Restrictive covenants of record in Book 172, Page 233 as amended in Book 173, Page 281 and Book 174, Page 417 and Book 184, Page 32,Chowan County Registry. IN WITNESS WHEREOF, the Grantor has hereunto set his hand and seal, or if corporate, has caused this instrumue corporate name by its duly authorized officers and its seal to be hereunto affixed b authority of its Board of We rs, a P� h=`_:. above written. NOTM% PLOX WAKE MW (Corporate Name) My -------------- :B WOOD BY: ------------------------ `- ---- - ---- , ----------------------N TAtY WAKE COUNTY, Wu ----------------------------President �"-fsmy Cartxlllsstm ATTEST:_- -__-_____(SEAL) --------------------------------------------------------------- w ______________ ______Secretary (Corporate Sea!) � -------------------------------------------------------------(SEAL) SEAL -STAMP NORTH CAROLINA, �..1___ _� _________________County. x I, a Notary Public of the County and State aforesaid, certify that __Mp s B. WOOD AND WIFE ___ J. BETH VAN AMBERG x -- imE _s _ _ WooD -- ---------------------------------------------------------------- Grantor, NOTARY PUBLIC WAKECOUNW, N.0 personally appeared before me this day andacknowledgedthe execution of the foregoing instrument. Witness my i)1..cww"OnL,o,.4nc. �j _ rhand and official stamp or seal, this _t"t--0___ day of ___.. �4 _______________ ---_______, My commissionJ&-.- Notary Public SEAL -STAMP NORTH CAROLINA-----------------------------------County. I, a Notary Public of the County and State aforesaid, certify that personally came before me this day and acknowledged that ____ he is ___________________________ Secretary of k X ------------------------------------------------------- a North Carolina corporation, and that by authority duly V mgiven and as the act of the corporation, the foregoing instrument was signed in its name by its _______________ President, sealed with its corporate seal and attested by ----------- as its ___________________________ Secretary. .'7 Witness my hand and official stamp or seal, this ------- day of __________________________, 19......... JJt I,AKL J J NA — i,rIVWML1'47 ' ,��VUL -L The foregoing �C7eeprtificate( of __J._J3M_U -____EAML1Nti ____________________________ expires: ------------------------------ MBERG, - NUTAKY _ YU1 LiU _OF_ WAKE ------------------------------------------- -------------------- Notary Public 1VL1\111 v___________ ___ ________ _--______________-_----_________________-___________________ is/aYt certified to be correct_ This instrument and this certificate are duly registered at the date and time and in the Book and Page shown on the first page hereof. ---__ UJ _ _ 10U1 _EE---------------------------------------REGISTER OF DEEDS FOR------__CHOwA---___,.__ --�--- ------____-_COi1NTY �y BY------.-_____----------------------Deputyl�'-fiegister of Deeds RECORDED & VERIFIED: -----Receil id DEED STAMPED: FOUR HUNDRED NINETY DOLLARS ($490. 00) lict, 9 SEE ATTACHMENT PAGE-- 7 3 2— 7 3 3 N. C. Bar Assoc. Form No. 3 © 1976, Revised d 1977 —James Williams & Co_, inc., ao. 122, Yadkim,iila, N. C. 27055 � �� Printed by Agreement wish the N. C_ Bar Agoc_ - 19$444dddYYY iii 1 C MAJOR PERMIT FEE MATRIX Applicant: LLk4 1 � boy' , 5 _ � v Y►, l i Selection Development Type Fee DCM % DWQ % (143001601 4351000931625 6263) (243001602 435100095 2341) 1. Private, non-commercial development that does not $250 100% ($250) 0% ($0) involve the filling or excavation of any wetlands or open water areas: 11. Public or commercial development that does not $400 100% ($400) 0% ($0) involve the filling or excavation of any wetlands or open water areas: Major Modification to a $250 100% ($250) 0% ($0) CAMA Major permit 111. For development that involves the filling and/or excavation of up to 1 acre of wetlands and/or open water areas, determine if A, B, C, or D below a lies: III(A). Private, non- commercial development, if $250 100% ($250) 0% ($0) General Water Quality Certification No. 4097 (See attached) can be a lied: III(B). Public or commercial development, if General $400 100% ($400) 0% ($0) Water Quality Certification No. 4097 (See attached) can be applied: lll(C). If General Water Quality Certification No. $400 60%($240) 40%($160) 4097 (see attached) could be applied, but DCM staff determined that additional review and written DWQ concurrence is needed because of concerns related to water quality or aquatic life: lll(D). If General Water Quality Certification No. $400 6017c ($240) 40% ($160) 4097 (see attached) cannot be applied: IV. For development that involves the filling and/or $475 60%($285) 40% ($190) excavation of more than one acre of wetlands and/or open water areas: