Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
NCG140169_DMR_Wastewater_20200925
PROCESS WASTEWATER — Quarterly Discharge Monitoring Report GENERAL PERMIT NO. NCG140000 .. CERTIFICATE OF COVERAGE NO. NCG14_-L la 3. SAMPLE COLLECTION YEAR: CaDao i - FACILITY NAME: ocz n 5 Re � Pn:X SAMPLE QUARTER: Jul-Sept ❑Oct-Dec Dan-March []April-June PERSON COLLECTING SAMPLES: 'DA.W+.? I541.4- �o0c COUNTY: Fol2..;g Fi► CERTIFIED LABORATORY:Seep ilekAAialt{-l-icn t Lab# '3 y PHONE NO.(33(a) '7416`'-'15').5 Lab# ADD TO LISTSERVE? AYES ❑NO EMAIL: I LIMIT VIOLATIONS? YES D NO © DISCHARGING TO CLASS: ❑SA EIHQW ❑PNA QTrout ❑Other , • OPTIONAL INFO: Part A:Wastewater Monitoring Requirements • I TPH using Date Sample Total Suspended Settleable Discharge • Outfall No. Collected) Type of Wastewater pH method 1S64A Total Flow VE,RM,MD Z Solids Solids SG7 HEM (gallons/day)Duration 7 (mm/dd/yr) ( ) (standard) (mg/L) (ml/L) • 6 (minutes) (mg/L) - - - 6-93'4 303,s 53 (15)6 - Nn ,l- I i R124 1.cy ; cog • i..:;.::.:... • 1 If wastewater systems have not discharged In•this quarter—report"No Flow"or"No Discharge"here.Please make sure to mark the sample quarter above. 2 Report the abbreviation for the type of Authorized Wastewater Discharges here:Vehicle and Equipment Cleaning(VE),Raw Material Stockpiles(RM),'Mixing Drum Cleanout(MD).Report more than one type if the waste-stream Is commingled. • 3If an effluent limit is exceeded twice in a row,the permittee is required to Institute monthly monitoring for that parameter for six months,unless DWQ RO staff notifies you to continue monitoring. °pH limits are 6-9 S.U.for wastewater discharges to freshwaters,and 6.8-8.5 S.U.for discharges to saltwaters. 5 TSS limits are 20 mg/L for wastewater discharges to HQW waters,10 mg/L for Trout and PNA waters,and 30 mg/L for all other water classifications.;;.; Permit Date:7/1/2010-06/30/2015 -'.Last Revised 07/13/11 . Page 1 of 2 6 Process wastewater discharges shall only be monitored for TPH when commingled with stormwater discharges from VMA areas.TPH does not have a)imit for wastewater, but instead is subject to benchmarks and provisions of Part IV,Section A,including the Tiered Response Action. 'Flow rate can be measured continuously or calculated. Flow limits for wastewater discharges to HQW waters shall beset to 50%of the Summer 7Qi0 Flow as per 15A NCAC 02B.0224. Permittees who discharge wastewater to HQW waters shall obtain a Summer 7Q10.flow and report this information to DWQ.If the'bermittee cannot obtain a Summer 7Q10 flow for the receiving waters at the discharge location,the permittee shall notify DWQ,and the DWQ Regional Office may require an annual flow report on a case-by-case basis. • • • • MAIL:ORIGINAL AND ONE COPY OF THIS ANNUAL SUMMARY(INCLUDING ALL"NO FLOW","NO DISCHARGE")WITHIN 30 DAYS OF RECEIPT OF SAMPLE(OR AT END OF MONITORING PERIOD IN CASE OF"NO FLOW")TO: Division of Water Quality Attn: DWQ Central Files 1617 Mall Service Center Raleigh, North Carolina 27699-1617 (919)807-6379 • • • • YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify,under penalty of law,that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my Inquiry of the;person or persons who manage the system,or those persons directlyresponsible for gathering the information the information submitted is,to the best of myknowledge and belief,true,accurate and p g g g complete. I am aware that there are significant penalties for submitting false information,Including the possibility of fines and imprisonment for knowing violations." a,)---tea (Signat re of P mittee) • (Date) • Permit Date:7/1/2010-06/30/2015 Last Revised 07/13/11 Page 2 of 2