Loading...
HomeMy WebLinkAbout090025_30 day POA_20210107P,,, N OF ACTIOK(PGA) FOR 'MGR FREEBOARD AT ANIMAL FA I LILT Facility Number: 1 25 County: 14-i I fit. Facility Nam: : 21-0\i-Wq V ¥4 v - Certified Operator Mame: U ROI ,f @.cy(1-14Operator # 1 qg 5 ES 1. Current liquid level(s) in inche as jneas-t ed from the current liquid level in the lagoon to the lowest point on the top of the dam for Iagoons without spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Structure 1- -Structure 2 Structure 3 Structure 4 Structure 5 Structure G Lagoon Name/Identifier (ID): , Spillway (Yes or No): Level (inches): 2. Check ail applicable iteths i(p Liquid level is within the designed .structural freeboard elevations' of one or more structures. C=ive'-- and 30 day Plans o; Action are attached. Hydraulic and agronomic balances are within acceptable ranges. Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is. attached. Agronomic balance Es within acceptable range. Waste is to be pumped and hauled to off site Iocations. Volume and PAID content of waste to pumped and hauled is reflected in section III tables. Included within this plan is a list of the proposed sites with related facility numbers), number acres and receiving crop information. Contact and secure approval from the 131VISIOri of Water Quality prior to transfer of waste to a site not covered En the facility's certified animal waste management plan. Operation will be partially or fully depopulated. - attach a complete schedule with corresponding animal units and dates for depopulation - if animals are to be moved to'another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 2°21 03S) 3. Earliest possible date to begin land applidation of waste: I — 7 2,0 2,0 hereby certify that 11 have reviewed the information Misted above and indluded within the attached Plan & Action, and to the best of nay knowledge and ability, the inforranation is accurate and correct. ( l \ i am P, • SiOY t Facility Owner/Manager (print) aL/e#72,2 Facility limner/ onager (signature) Rom: (9O) S72 — Date: t17 (oa1 PoA Cover Page 2/21! E II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: 2. Structure ID: 3. Structure ID: 4. Structure ID: 5. Structure ID: 6. Structure ID: Storms 1 Storms 2 3 4 n. lines 1 + 2 + 3 + 4 + 5 + 6 = line m = Ib PAN line m = 247.7 Ib PAN line m = Ib PAN line m = Ib PAN line m = lb PAN line m = Ib PAN 247.7 Ib PAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN ST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD. PERIOD. DO o. tract # NOT Li p. field # q. crop r. acres s. remaining IRR-21t. PAN balance (Ib/acre) TOTAL PAN BALANCE FOR FIELD (lbs.) column r x s u_ application window' 903 K-P wheat 30.00 100.00 3000.0 9/1-4/30 ** guestimate on remaining PAN balance I I I 1 1 State current crop ending application date or next crop application beginning date for available receiving crops during 30 day draw down period. v. Total PAN available for all fields (sum of column t) = IV. FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied (line n from section II) = x. Crop's remaining PAN balance (line v from section III) = y. Overall PAN balance (w - x) = 3000.0 Ib. PAN 247.7 Ib. PAN 3000.0 Ib. PAN -2752 lb. PAN Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new information. If newfields are to be included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the receiving facility. NARRATIVE: pumping will begin as soon as field conidtions allow. PoA (30 Day) 2/21/00 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): Storms 2 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker b. designed 25 yr./24 hr. storm & structural freeboard c. line b - line a (inches in red zone) = d. top of dike surface area according to design (area at below structural freeboard elevation) e. line c/12 x line d x 7.48 gallons/ft3 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design g. volume of waste produced according to structural design h. current herd # 4896 certified herd # 16.0 19.0 inches inches 3.0 inches 128481 ft2 240259 gallons 180 161803 4896 actual waste produced = current herd # x line g = certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated m. ((lines e + k)/1000) x line I = 12/2/20 REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) days ft3 161803 ft3 0 77481 ft3 ft3 298307 gallons 0.46 lbs/1000 gal. 247.7 lbs. PAN PoA (30 Day) 2/21/00