HomeMy WebLinkAbout090184_30 day POA_20210113PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
FacilityNumber: / - ' r County: etuen
tY
_Farms
Facility Name:
Certified Operator Name: Fk I beY Bea Operator # Bk4n
1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the
lowest point on the top of the dam for lagoons without spillways; and from the current liquid level
in the lagoon to the bottom of the spillway for lagoons with spillways.
Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6
Lagoon Name/identifier (ID): 1
Spillway (Yes or No):
Level (inches):
2. Check all applicable items
Ig
Liquid level is within the designed structural freeboard elevations of one or more structures. Five
and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within
acceptable ranges.
Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day
Plan of Action is attached. Agronomic balance is within acceptable range.
Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste to
pumped and hauled is reflected in section Ill tables. Included within this plan is a list of the
proposed sites with related facility number(s), number acres and receiving crop information.
Contact and secure approval from the Division of Water Resources prior to transfer of
waste to a site not covered in the facility's certified animal waste management plan.
Operation will be partially or fully depopulated.
- attach a complete schedule with corresponding animal units and dates for depopulation
- if animals are to be moved to another permitted facility, provide facility number, lagoon
freeboard levels and herd population for the receiving facility
3. Earliest possible date to begin land application of waste: f/P / 0 2 /
r
l hereby certify that i have reviewed the information listed above and included within the attached Plan
of Action, and to the best of my knowledge and ability, the information is accurate and correct.
ea,VJJ--
Facility Owner/Manger (print)
f
Facility Owner/
anager (s ,"nature)
9/6 -- F7V -3 /37
Phone:
Date:
I--19-20z1
PoA Cover Page 2/21/00
II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR.f24
HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY
1. Structure ID: 1 line m = 74.9 Ib PAN
2. Structure ID: line m = Ib PAN
3. Structure ID: line m = Ib PAN
4. Structure ID: line m = Ib PAN
5. Structure ID: line m = Ib PAN
6. Structure ID: line m = Ib PAN
n. lines 1 +2+3+4+5+6=
74.9 Ib PAN
III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN
RING THIS 30 DAY PERIOD.
1 VI%I OIV• VV
o. tract #
■••v ■ •••r• • . •rrr�
p. field #
..� ...•.__... __ _ _ .__ -- ______
q. crop
_
r. acres
s. remaining IRR-2
PAN balance
(lb1acre)
t. TOTAL PAN
BALANCE FOR
FIELD (lbs.)
column r x s
u. application window'
2075
1
winter annuals
2.38
40.00
95.2
Sept -Mar
Sept -Mar
2075
2
winter annuals
2.34
40.00
93.6
2075
3
fescue
1.77
100.00
177.0
Aug -Jul
2075
4
fescue
1.39
100.00
139.0
Aug -Jul
2075
5
fescue
0.73
100.00
73.0
Aug -Jul
2075
6
small grain os
2.12
40.00
84.8
Oct -Mar
2075
7
small grain os
1.73
40.00
69.2
Oct -Mar
2075
8
small grain os
0.52
40.00
20.8
Oct -Mar
2075
9
winter annuals
1.45
40.00
58.0
Sept -Mar
2075
10
winter annuals
0.90
40.00
36.0
Sept -Mar
Sept -Mar
2075
11
winter annuals
0.73
40.00
29.2
***guestimates on PAN***
I
.
1State current crop ending application date or next crop application beginning date for available
receiving crops during 30 day draw down period.
v. Total PAN available for all fields (sum of column t) =
IV. FACILITY'S PoA OVERALL PAN BALANCE
w. Total PAN to be land applied (line n from section II) =
x. Crop's remaining PAN balance (line v from section III) =
y. Overall PAN balance (w - x) =
NARRATIVE:
875.8 Ib. PAN
74.9 Ib. PAN
875.8 Ib. PAN
-801 Ib. PAN
will begin pumping as soon as field conditions permit.
PoA (30 Day) 2/21 /00
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/Identifier (ID):
cHs
1
2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard
a. current liquid level according to marker
b. designed 25 yr./24 hr. storm & structural freeboard
c. line b - line a (inches in red zone) =
d. top of dike surface area according to design
(area at below structural freeboard elevation)
e. line c/12 x line d x 7.48 gallons/ft3
3. Projected volume of waste liquid produced during draw down period
f. temporary storage period according to structural design
g. volume of waste produced according to structural design
h. current herd #
3040
certified herd #
18.0
19.0
inches
inches
1.0 inches
37800
ft2
23562 gallons
180
22271
3040
actual waste produced = current herd # x line g =
certified herd #
i. volume of wash water according to structural design
j. excess rainfall over evaporation according to design
k. (lines h + i + j) x 7.48 x 30 days/line f=
4. Total PAN to be land applied during draw down period
I. current waste analysis dated
m. ((lines e + k)/1000) x line I =
11/18/20
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
days
ft3
22271 ft3
0
22050
ft3
ft3
55254 gallons
0.95
Ibs/1000 gal.
74.9 lbs. PAN
PoA (30 Day) 2/21/00