Loading...
HomeMy WebLinkAbout090025_30 day POA_20210302 (2)Pli AIM OF ACTION )) FOR HIGH FREEBOARD AT ANTRAL FACALUTES County: RA I C't(,.)r (',/i 'A FacHfly Haring: /r-ti-DY-I(\n!__. --(__________,._;.fj(_L_________v1____________________i_____.______________ fr a i�� 0r O)me: 1 t\ I l U POI _,LA Loy t�.�Qt ,,a 1 � q J �. 'i current liquid level(s) in inch as I11e ( lowest point Oil the top of the dam for lagoons from the current liquid level in the lagoon to the in the lagoon to the bottom of the spillway for lagoons spillways; and from the current liquid level g ons with spillways. Structure`i ' 'Structure; 2 Structure 3 Structure 4 Structure 5 Structure- ,,) S�f �,cturc 6 Lagoon Dame/Identifier (ID): Spillway (Yes or No): Level (inches): 2. Check an applicable items Liquid level is within the c?esignec? .structural freeboard elevations.of o and 30 day Plans of Action are attached. � -�, , � ne ar more structures. rive. ulic andgrononlic balances are �rwithinacceptable ranges, ? lycl �. Liquid level is within the 25 year 24 hour storm elevations for one or more S�: , tj Plan of Action is. attached. Agronomic balance is within acceptable range rL c`oi eS• A0 Gay Waste is t0 be pumped and , i p� hauled to off site locations. Volume and pumped and hauled is reflected in section ! •�, PAN content of waste to 11. tables. included within this plan is a list of the proposed sites with I-elGted facility I1umber(s), number CeI�it3�:t and se����['�: �?�j�:r'�;°';i �f ��r,�:L�.�i� i�l��. �� �,�, pc ��., 7 Water( acres a �information. !'e and receiving crop ln''Of'1natl0n to st nl 31 Urater( Qua ! L c s tom. not t ce1,ered to the fadilft �'s certif➢e I arm waste'i maroauement Man. a loaf e'— G[ �. Jl,'� u Operation will be partially or fully depopulated. -- attach a complete schedule with corresponding if animals � 1 .., animal units ^c,f1C? dates for depopulation is are to be moved toanothe► permitted facility, provide facility number, lagoon freeboard levels and herd population a L.j12tI0n for the receiving facility ty 3. Earliest possible date to begin land opplibstiof of waste: (([ i; erreiby c� ntfy that 11 have e ve iiBell ed the tnffnrrmat:ton ttsted aljo—,,Pe e n tf; /- /,� e t In. l'���� l�1�W 1'.�f�L'Lc and to `O of - .. �14n U�_�C^ :l`.'�4i l.J� UL'l:L(1��n thefir'• r (.�)I �� U� �C'1� !���� rL'r, kr�o,r 1��`''��'C and =f. f r Q � c.c,ii;��e�nEG1 Ran ul b! �'•• the a t- on ts a..,z-i_.GaaeC_ and cof'rrCct 0,rn ulaY FactV'tty wne '1ft an age (print) (°/ (0) -72 - 2,0'1 (='oA c ove-F Page 2I2 / r3 II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: 2. Structure ID: 3. Structure ID: 4. Structure ID: 5. Structure ID: 6. Structure ID: Storms 1 Storms 2 Storms 3 Storms 4 n. lines 1 +2+3+4+5+6= line m = line m = line m = line m = line m = line m = Ib PAN 333.0 Ib PAN 241.9 Ib PAN 210.4 Ib PAN Ib PAN Ib PAN 785.2 Ib PAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD. o. tract # p. field # q. crop r. acres s. remaining IRR- 2 PAN balance (Ib/acre) t. TOTAL PAN BALANCE FOR FIELD (Ibs.) column r x s u. application window' 903 K-P wheat 30.00 50.00 1500.0 9/1-4/30 ** guestimate on remaining PAN balance 'State current crop ending application date or next crop application beginning date for available receiving crops during 30 day draw down period. v. Total PAN available for all fields (sum of column t) = IV. FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied (line n from section II) = x. Crop's remaining PAN balance (line v from section III) = y. Overall PAN balance (w - x) = 1500.0 Ib. PAN 785.2 Ib. PAN 1500.0 Ib. PAN -715 lb. PAN Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new information. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the receiving facility. NARRATIVE: pumping will begin as soon as field conidtions allow. PoA (30 Day) 2/21/00 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): Storms 2 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker b. designed 25 yr./24 hr. storm & structural freeboard c. line b - line a (inches in red zone) = d. top of dike surface area according to design (area at below structural freeboard elevation) e. line c/12 x line d x 7.48 gallons/ft' 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design g. volume of waste produced according to structural design h. current herd # 4896 certified herd # 18.0 19.0 inches inches 1.0 inches 128481 ft2 80086 gallons 180 161803 4896 actual waste produced = current herd # x line g = certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated m. ((lines e + k)/1000) x line I = 12/2/2020 REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) days ft3 161803 ft3 0 77481 ft3 ft3 298307 gallons 0.88 Ibs/1000 gal. 333.0 lbs. PAN PoA (30 Day) 2/21/00 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): Storms 3 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker b. designed 25 yr./24 hr. storm & structural freeboard c. line b - line a (inches in red zone) _ d. top of dike surface area according to design (area at below structural freeboard elevation) e. line c/12 x line d x 7.48 gallons/ft3 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design g. volume of waste produced according to structural design h. current herd # 4896 certified herd # 16.0 19.0 inches inches 3.0 inches 128256 ft2 239839 gallons 180 161411 4896 actual waste produced = current herd # x line g = certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated m. ((lines e + k)/1000) x line I = 12/2/2020 REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) days ft3 161411 ft3 0 77350 ft3 ft3 297655 gallons 0.45 Ibs/1000 gal. 241.9 lbs. PAN PoA (30 Day) 2/21/00 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): Storms 4 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker b. designed 25 yr./24 hr. storm & structural freeboard c. line b - line a (inches in red zone) = d. top of dike surface area according to design (area at below structural freeboard elevation) e. line c/12 x line d x 7.48 gallons/ft3 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design g. volume of waste produced according to structural design h. current herd # 4896 certified herd # 15.0 19.0 inches inches 4.0 inches 128656 ft2 320782 gallons 180 161411 4896 actual waste produced = current herd # x line g = certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated m. ((lines e + k)/1000) x line I = 12/2/2020 REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) days ft3 161411 fti 0 77583 ft3 ft3 297946 gallons 0.34 Ibs/1000 gal. 210.4 lbs. PAN PoA (30 Day) 2/21/00 TO: FROM: SUBJEI DATE LOCAT The upcc 11that7 including you need call in 3C attending -7-6-k_p 7yert Run DA. ?() D1V.19( Mon LW' Wri Bladen County Livestock Association zabethtown, NC 28337 rs in Bladen County County Livestock Association (weeds and insects) du/bc1a2 ck Association is scheduled for Thursday, March gent, will discuss pest control in bermudagrass to log in with zoom, so I can see your video. If Join Zoom Meeting - https://go.ncsu.edu/bc1a2 or ting ID: 989 7626 1770 and Passcode: 825282. If or text Becky at 876-3623. 1 hour of Animal Waste Cont Education Credit AND 1 hour of X pesticide credit will be given. Upcoming Events March 25 Pesticide Classes - 4-6 pm is 2 hours of V credit and 6-8 pm is 2 hours of X credit on zoom and a few in -person slots. April 8 Bladen County Livestock Association Meeting — location TBA We are in a new membership year and that means membership fees are due. Please fill out the 2021 membership form below. Mail form and check to the Bladen County Livestock Association, P.O. Box 249, Elizabethtown, NC 28337. Membership dues are $25 per family or $50 for corporate membership. I would like to become a memo er of the Bladen County Livestock Association. Enclosed is my S25 or $50 check for my 2020 membership. Please put me on the Association's mailing list. Name Phone Address City Zip What is your interest in livesto ck production? Grower Farm Owner Farm Supplier Student Other Farm Manager In what type of livestock production are you involved? Swine Poultry Horses Cattle Goats/Sheep checks payable to the Bkiden Counly Livestock Association