Loading...
HomeMy WebLinkAbout20210452 Ver 1_R-2577A 4C Final Minutes_20210309 Wanucha, Dave From:Alsmeyer, Eric C CIV USARMY CESAW (USA) <Eric.C.Alsmeyer@usace.army.mil> Sent:Tuesday, March 9, 2021 8:32 AM To:Euliss, Amy; Brent Huskey Cc:Williams, Andrew E CIV USARMY CESAW (USA); Wanucha, Dave; Youngman, Holland J; lauren_wilson@fws.gov Subject:\[External\] RE: R-2577A 4C Final Minutes Attachments:R-2577A 4C Minutes Final.pdf; R2577A_Permit Drawings_20210308.pdf; R-2577A 4C Meeting Sign-in Sheet.pdf; R-2577A_HYD_SMPv2.08_(20210308) (Apr 2018).pdf CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Thanks, Amy and Brent. FYI: Starting on 28 March, Andy Williams (Office Tel: (919) 554-4884, x26, and copied on this email) will be the Corps POC for Division 9, so he will be handling anything new that comes up. I will be moving over to Divs 10 & 12. I have also copied the newer USFWS reps on this. Please reply or call if you have any questions or if I may serve you in any other way. The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete the Customer Satisfaction Survey located at http://corpsmapu.usace.army.mil/cm_apex/f?p=136:4:0. Eric Eric Alsmeyer Work Cell: 919.817.1570 Project Manager Regulatory Division Office US Army Corps of Engineers, Wilmington District 3331 Heritage Trade Drive, Suite 105, Wake Forest, NC 27587 Office Tel: (919) 554-4884, x23 (I am working out of the office, but I try to check my voicemails daily) Regulatory Homepage: http://www.saw.usace.army.mil/Missions/RegulatoryPermitProgram.aspx From: Euliss, Amy <aeuliss@ncdot.gov> Sent: Monday, March 8, 2021 3:59 PM To: Brent Huskey <bhuskey@rkk.com> Cc: Alsmeyer, Eric C CIV USARMY CESAW (USA) <Eric.C.Alsmeyer@usace.army.mil> Subject: \[Non-DoD Source\] FW: \[External\] R-2577A 4C Final Minutes Brent, Nicholle left the Charlotte office. Eric Alsmeyer is currently our USACE representative. I’ve cc’d him on the email. 1 Amy From: Brent Huskey <bhuskey@rkk.com> Sent: Monday, March 8, 2021 12:08 PM To: Patterson, Robert D <robert.patterson@ncdenr.gov>; Barrett, William A <wabarrett@ncdot.gov>; Seiler, Erik P <epseiler@ncdot.gov>; Chambers, Marla J <marla.chambers@ncwildlife.org>; Braspennickx, Nicholle M CIV USARMY CESAW (US <Nicholle.M.Braspennickx@usace.army.mil>; Euliss, Amy <aeuliss@ncdot.gov>; Mitchell, Robert K <kevin.mitchell@ncdenr.gov>; Wanucha, Dave <dave.wanucha@ncdenr.gov>; claire_ellwanger@fws.gov; James, Connie K <ckjames1@ncdot.gov> Cc: Scott Blevins <sblevins@rkk.com>; jwhittington@rkk.com; Tina Swiezy <tswiezy@rkk.com>; Jeff Hext <jhext@rkk.com>; John Olinger <jolinger@rkk.com>; Pete Stafford <pstafford@rkk.com> Subject: \[External\] R-2577A 4C Final Minutes CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. All, Please see the attached 4C Interagency Concurrence Point Meeting minutes, the permit drawings and the SMP for the R- 2577A, US-158 Widening project that was held on Wednesday, November 20, 2019. The final 4C Meeting minutes and plans were put on hold due to alignment changes that needed to take place to avoid the Walkertown Community Park. Based on the 4C Meeting minutes, a summary of what has changed on the project to avoid the Walkertown Community Park has been provided in the minutes. A summary has also been provided below:  To avoid all right of way claims with Walkertown Community Park, that is a 6(f) property, a shift was put in place from -L- 202+25 to 242+09 that shifted US-158 approximately 30 feet to the southeast. The shift affected the alignment of -Y16- (Old Belews Cr. Road) and -Y17- (Darrow Road).  For the purpose of R-2577A permit drawings, the alignment shift affected Permit Site 5 and Permit Site 6 as follows: o Permit Site 5 – Impacts were reduced for stream SET and Wetland WHP o Permit Site 6 – There are less impacts on the upstream side and more impacts on the downstream side Stream SES compared to the plans that were provided at the 4C meeting. The overall stream impacts to Stream SES did not change much but the culvert extensions and supplemental pipe had to be revised to line up with the stream again. Let me know if you have any questions or concerns. Thanks, __________________________________ BRENT HUSKEY, PE Senior Project Engineer 8601 Six Forks Road Forum 1, Suite 700 Raleigh, NC 27615 919.878.9560 P | 919.653.7377 D | 828.329.5502 C www.rkk.com Responsive People | Creative Solutions 2 "RK&K" and "RK&K Engineers" are registered trade names of Rummel, Klepper & Kahl, LLP, a Maryland limited liability partnership. This message contains confidential information intended only for the person or persons named above. If you have received this message in error, please immediately notify the sender by return email and delete the message. Thank you. RK&K is an equal opportunity employer that values diversity at all levels. RK&K does not discriminate in employment on the basis of race, color, religion, sex (including pregnancy), national origin, political affiliation, sexual orientation, marital status, disability, genetic information, age, parental status, military and veteran status, and any other characteristic protected by applicable law. Consistent with the requirements of Title VI of the Civil Rights Act of 1964, as amended and other nondiscrimination laws and authorities, we also note that RK&K does not discriminate in its selection or retention of subcontractors on the grounds of race, color, or national origin. We also note that RK&K will ensure that Minorities will be afforded full opportunity to submit proposals and not be discriminated against on the grounds of race, color, or national origin in consideration for an award. Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties. 3