HomeMy WebLinkAbout090209_30 day POA_20210104PLAN OF ACTON (NA) FOR HIGH F.RE1 O RD AT ANIMAL F CILIITES
FaciiQty NunBl'oerro • 1 o 2o
01
Facility Name: --?1 �U \ Nu1(SX k;
i
Certified Operator Name: ?CWV I9ii h Dc Operator # (l i?)
. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the
lowest point on the top of the dam for lagoons without spillways; and from the current liquid level
in the lagoon to the bottom of the spillway ft r lagoons with spillways.
Structure I Structure 2 Structure 3 Structure 4 Structure 5 Structure 6
County: ftcey\
Laboon Namefldentifier (ID):
Spillway (Yes or No):
Level (inches):
2. Check all1 applicable items
J_S
Liquid level is within the designed structural freeboard elevations of one or more structures. Five
and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within
acceptable ranges.
1 Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 da
Y
Plan of Action is attached. Agronomic balance is within acceptable range.
\Haste is to be pumped and hauled to off site locations. Volume and PAN content of waste to
pumped and hauled is reflected in section ill tables. Included within this plan is a list of the
proposed sites with related facility number(s), number acres and receiving crop information.
Contact and secure approval from the Division of Water Quality DEicw to transfers of waste:
to a site not covered in the facility's cerc -ified animal waste management plan.
Operation will be partially or fully depopulated.
attach a complete schedule with corresponding animal units and dates for depopulation
- if animals are to be moved to another permitted facility, provide facility number, lagoon
freeboard levels and herd population for the receiving facility_
3. Earliest possible date to begin land application of waste: I I LI [26:2--1
fl hereby certify the 1 have reviewed the information Qasted above and included within thG attached Nan
of Action, and to the best of nay knowledge and ability, the information is accurate and COVirdct.
r3)lw\u \'%\\u
C aca11ty OwneWtllianagerr (prrgintg
acil ty ®wnerlltfianager (signature)
��D�irne Cci o) 8 147 '*2 --f
Date:
•
PEA Cover Page 2l21100
II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24
HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY
1. Structure ID:
2. Structure ID:
3. Structure ID:
4. Structure ID:
5. Structure ID:
6. Structure ID:
Billups Nursery
n.lines 1+2+3+4+5+6=
line rn = 245.2 Ib PAN
line m = Ib PAN
line m = Ib PAN
line m = Ib PAN
line rn = Ib PAN
line m = Ib PAN
245.2 Ib PAN
III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN
NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD.
o. tract #
p. field #
q. crop
r. acres
s. remaining IRR-t.
2 PAN balance
(Ib/acre)
TOTAL PAN
BALANCE FOR
FIELD (Ibs.)
column r x s
u. application window'
Un
1
overseed
12.60
25.00
315.0
Sept -Mar
PAN balance is an estimate.
'State current crop ending application date or next crop application beginning date for available
receiving crops during 30 day draw down period.
v. Total PAN available for all fields (sum of column t) =
IV. FACILITY'S PoA OVERALL PAN BALANCE
w. Total PAN to be land applied (line n from section II) =
x. Crop's remaining PAN balance (line v from section III) =
y. Overall PAN balance (w - x) =
315.0 Ib. PAN
245.2 Ib. PAN
315.0 Ib. PAN
-70 Ib. PAN
Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and
haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN
based on new information. If new fields are to be included as an option for lowering lagoon level, add these
fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to
another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the
receiving facility.
NARRATIVE:
will begin pumping as soon as field conditions allow.
PoA (30 Day) 2/21/00
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/Identifier (ID):
Billups Nursery
2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard
a. current liquid level according to marker
b. designed 25 yr./24 hr. storm & structural freeboard
c. line b - line a (inches in red zone) =
d. top of dike surface area according to design
(area at below structural freeboard elevation)
e. line c/12 x line d x 7.48 gallons/ft3
3. Projected volume of waste liquid produced during draw down period
f. temporary storage period according to structural design
g. volume of waste produced according to structural design
h. current herd #
6400
certified herd #
25.0
26.0
inches
inches
1.0 inches
56376
ft2
35141 gallons
180
46887
6400
actual waste produced = current herd # x line g =
certified herd #
i. volume of wash water according to structural design
j. excess rainfall over evaporation according to design
k. (lines h + i + j) x 7.48 x 30 days/line f=
4. Total PAN to be land applied during draw down period
I. current waste analysis dated
m. ((lines e + k)/1000) x line I =
7/27/2020
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
days
ft3
46887 ft3
30976
37521
ft3
ft3
143845 gallons
1.37
lbs/1000 gal.
245.2 lbs. PAN
PoA (30 Day) 2/21/00