HomeMy WebLinkAbout090015_30 day POA_20210104PLN OF A CTIIO N (PoA) FOR MOH FRC=BO r D NllTrllAL F CIIIUT_ES
FaciQiey Number: 6.) County: c 6lr,
Facility Name: k\24V\ I Qt f Foe �f1
Certified Operator Name: Kenno nvneal
1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the
lowest point on the top of the dam for lagoons without spillways; and from the current liquid level
in the lagoon to the bottom of the spillway for lagoons with spillways.
Operator#
Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6
Lagoon Name/Identifier (ID):
Spillway (Yes or No):
Level (inches):
2. Check all applicable items
Liquid level is within the designed structural freeboard elevations of one or more structures. Five
and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within
acceptable ranges.
V Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day
Plan of Action is attached. Agronomic balance is within acceptable range.
Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste to
pumped and hauled is reflected in section Ill tables. Included within this plan is a list of the
proposed sites with related facility number(s), number acres and receiving crop information.
Contact and secure -approval from the Division of Water Quality prior to transfer of waste
to a site not covered in the facility's certified ani =gal waste management plan.
Operation will be partially or fully depopulated.
attach a complete schedule with corresponding animal units and dates for depopulation
if animals are to be moved to another permitted facility, provide facility number, lagoon
freeboard levels and herd population for the receiving facility
3, Earliest possible date to begin land application of waste:
11 hereby certify that a have reviewed the information listed above and included within the attached Plan
of Acti.an, and t the best of my knowledge and ability, the information is accurate and c. rrect.
\62f\\rrpkh \ny\a n
Facility Owner/itltanager (print)
--
` aciUty O' vner/Manager (signature)
Phone: (CI I 0) g-ILH
-
Date:
dv
PoA Cover Page 2/21/00
II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AID/OR 25 YR./24
HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTU "'ES FOR FACILITY
III. T
PE
1. Structure ID:
2. Structure ID:
3. Structure ID:
TAL PAN
IUD. DO
Kenny Inman 1
n. lines1i +2�3+4+5�6�
ALANCE REMAINING FOr' AVAILALE C
OT UST FIELDS To WHICH PAN CANNOT
line m =
line m =
line m =
184.8 Ib PAN
Ib PAN
Ib PAN
184.8 Ib PAN
OPS DURING 30 D, Y D> W DOWN
E APPLIED DURING THIS 30 DAY PERIO
o. tract #
p. field #
q. crop
r. acres
s. remaining IRR-
2 PAN balance
(Ib/acre)
t. TOTAL PAN
BALANCE FOR
FIELD (Ibs.)
column r x s
u. application window'
11170
3
Overseed
1.58
37.50
59.3
Sept -Mar
11169
4
Overseed
4.42
37.50
165.8
Sept -Mar
11171
5
Overseed
4.45
37.50
166.9
Sept -Mar
10009
6
Overseed
0.73
50.00
36.5
Sept -Mar
T10009
1
Overseed
5.14
37.50
192.8
Sept -Mar
T10009
2
Overseed
0.94
37.50
35.3
Sept -Mar
State current crop ending application date or next crop application beginning date for available
receiving crops during 30 day draw down period.
v. Total PAN available for all fields (sum of column t)
IV. FACILITY'S PoA OVERALL PAN BALANCE
w. Tot AN to be land applied (line n from section II) _
x. Crop°s remaining PAN balance (line v from section ID)
y. Overall PAN balance (w m x)
656.4 Ib. PAN
184.8 Ib. PAN
656.4 Ib. PAN
-472 Ib. PAN
Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and
haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN
based on new information. If new fields are to be included as an option for lowering lagoon level, add these
fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to
another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the
receiving facility.
NARRATIVE:
will begin pumping as soon as weather permits.
PoA (30 Day) 2/21/00
PLAN OF ACTDON (PoA) FOR H GH FREEBOARD AT AND6]AL FACDLDTDES
30 DAY DRAW DOWN PERDOD
De TOTAL PAN TO
E LAND APPLIED PER WASTE STE',UCTURE
1. Structure Name/Identifier (ID):
Kenny Inman 1
2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard
a. current liquid level according to marker
b. designed 25 yr./24 hr. storm & structural freeboard
c. line b - line a (inches in red zone) _
d. top of dike surface area according to design
(area at below structural freeboard elevation)
e. line c/12 x line d x 7.48 gallons/ft3
3. Projected volume of waste liquid produced during draw down period
f. temporary storage period according to structural design
g. volume of waste produced according to structural design
h. current herd #
6400
certified herd #
18.0
19.0
inches
inches
1.0 inches
98350
ft2
61305 gallons
180
46887.7
6400
actual waste produced = current herd # x line g =
certified herd #
i. volume of wash water according to structural design
j. excess rainfall over evaporation according to design
k. (lines h + i + j) x 7.48 x 30 days/line f=
4. Total PAN to be land applied during draw down period
I. current waste analysis dated
m. ((lines e + k)/1000) x line I =
12/7/2020
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
days
ft3
46888 ft3
0
43750
ft3
ft3
112995 gallons
1.06
Ibs/1000 gal.
184.8 Ibs. PAN
PoA (30 Day) 2/21/00