HomeMy WebLinkAboutPerry Creek InterceptorDocuSign Envelope ID: 77E318AF-BC94-4A88-82CC-41 B94D01 D795
ROY COOPER
Governor
DIONNE DELLI-GATTI
Secretary
S. DANIEL SMITH
Director
City of Raleigh Public Utilities Department
Attn: Aaron Brower
One Exchange Plaza, Suite 620
Raleigh, NC 27601
NORTH CAROLINA
Environmental Quality
March 121, 2021
Subject: Buffer Determination Letter
NBRRO #20-405
Wake County
Determination Type:
Buffer
Intermittent/Perennial
® Neuse (I5A NCAC 2B .0714)
❑ Tar -Pamlico (I5A NCAC 2B .0734)
❑ Intermittent/Perennial Determination (where local
buffer ordinances apply)
ElJordan (I 5A NCAC 2B .0267) (governmental
and/or interjurisdictional projects)
Project Name: Perry Creek Interceptor
Address/Location: Existing and proposed City of Raleigh utility easement
Stream(s): Perry Creek
North Carolina Department of Environmental Quality I Division of Water Resources
Raleigh Regional Office 13800 Barrett Drive I Raleigh, North Carolina 27609
919.791.4200
DocuSign Envelope ID: 77E318AF-BC94- 4A88-82CC-41 B94D01 D795
Perry Creek Interceptor
Wake County
3/11/2021
Page 2 of 3
Determination Date: 3/9/2021
Staff: Josh Brigham
Stream
E/I/P(1)
Not
Subject
Start@
Stop@
Soil
USGS
Feature
Subject(2)
Survey
To o
Off project
Lake Gresham
Perry
X
corridor/boundary
X
X
Lake Gresham
Off project
Creek
corridor/boundary
Stream A
X
Not subject within project
X
corridor/boundary
Not subject within project
Stream B
X
corridor/boundary
X
Not subject within project
Stream C
X
corridor/boundary
X
Stream D
X
Not subject within project
X
corridor/boundary
Stream E
X
Off project
Perry Creek
X
corridor/bounda
Stream F
X
Subject throughout project
X
corridor/boundary
Stream G
X
Not subject within project
X
corridor/boundary
Stream H
X
Not subject within project
X
corridor/boundary
Not subject within project
Stream I
X
corridoriboundary
X
Not subject within project
X
Stream J
X
corridor/boundary
Lake
X
X
X
Gresham
Pond 1
NP
X
X
Pond 2
NP
X
X
(1) E = Ephemeral, 1= Intermittent, P = Perennial, NP = Not Present
(2) Refers to State riparian buffer rules only. Stream, wetland, or pond impacts are still subject to applicable water quality standards and permitting requirements.
Explanation: The stream(s)/pond(s) listed above has been located on the most recent published NRCS Soil Survey
of Wake County, North Carolina and/or the most recent copy of the USGS Topographic map at a 1: 24,000 scale.
Each feature that is checked "Not Subject" has been determined to not be an intermittent stream, perennial stream, a
pond connected to a stream feature, or the feature is determined not to be present. Stream features that are checked
"Subject" have been located on the property and possess characteristics that qualify it to be subject to the buffer
rules. There may be other streams located on the property that do not show up on the maps referenced above and are
therefore not subject to the buffer rules. However, if the stream features are present on the tract they are subject to
all other applicable North Carolina stream standards and permitting requirements as outlined in 15A NCAC 02B and
may be considered jurisdictional according to the US Army Corps of Engineers.
This on -site determination shall expire five (5) years from the date of this letter. Landowners or affected
parties that dispute a determination made by the DWR may request a determination by the Director. An
appeal request must be made within sixty (60) days of date of this letter. A request for a determination by the
Director shall be referred to the Director in writing. If sending via US Postal Service: c/o Paul Wojoski; DWR
— 401 & Buffer Permitting Unit, 1617 Mail Service Center, Raleigh, NC 27699-1617. If sending via delivery
service (UPS, FedEx, etc.): Paul Wojoski; DWR — 401 & Buffer Permitting Unit, 512 N. Salisbury Street,
Raleigh, NC 27604.
North Carolina Department of Environmental Quality I Division of Water Resources I Raleigh Regional Office
3800 Barrett Drive 11628 Mail Service Center I Raleigh, North Carolina 27699-1628
919.791.4200
DocuSign Envelope ID: 77E318AF-BC94-4A88-82CC-41 B94D01 D795
Perry Creek Interceptor
Wake County
3/11/2021
Page 3 of 3
This determination is final and binding unless, as detailed above, an appeal is requested within sixty (60)
days.
This project may require a Section 404/401 Permit for the proposed activity. Any inquiries should be
directed to the US Army Corp of Engineers (Raleigh Regulatory Field Office) at (919)-554-4884.
If you have questions regarding this determination, please feel free to contact Josh Brigham at (919) 791-4251
Sincerely,
CDocuSigned by.
S�t
BCDADD825D4A46D...
Scott Vinson, Regional Supervisor
Water Quality Regional Operations Section
Raleigh Regional Office, Division of Water Resources, NCDEQ
cc: RRO DWR File Copy
Laserfiche
Consultant via e-mail, Preston Butler, Carolina Ecosystems, preston.butler@carolinaeco.com
North Carolina Department of Environmental Quality I Division of Water Resources I Raleigh Regional Office
3800 Barrett Drive 11628 Mail Service Center I Raleigh, North Carolina 27699-1628
919.791.4200
DocuSign Envelope ID: 77E318AF-BC94-4A88-82CC-41 B94D01 D795
Perry Creek Interceptor
Wake County, NC-DWR Project # 20-405
NRCS Soil Survey Sheet 29��Fa
Wake CO., NC 1970 � Locations are approximate
Legend' ` and are provided for refer-
ence only::
-project boundary Q I A�
DocuSign Envelope ID: 77E318AF-BC94-4A88-82CC-41 B94D01 D795
Perry Creek Interceptor
Wake County, NC-DWR Project # 20-405
NRCS Soil Survey Sheet 30 �4
d m
Wake Co., NC 1970 Locations are approximate
Legend: _ and are provided for refer-
ence only
-project boundary
DocuSign Envelope ID: 77E318AF-BC94-4A88-82CC-41 B94D01 D795
Perry Creek Interceptor
Wake County, NC-DWR Project # 20-405
rM
USGS Topographical Map �o
Wake Forest Quadrangle 2019 Locations are approximate
Legend: _ and are provided for refer-
ence only::
-Project boundary
`
' ~
-
-
"
" °
- - --- - - - - -
_ - - - �_ -- _ -
- _---_------- -_----_-- - _ - --
. �
'
-
a
'-
^
'
^