Loading...
HomeMy WebLinkAbout090025_30 day POA_20211230MAK OF ACTON(PoA) O A• S u Facility NaOalatoer; �r Fac6GGty Name: 2-21-0\r"\Y)A9 f ff, IIGHFUCEBOARD AT NIIM County: APti I CI( 7 i CALMES Certified Operator Name: N U \`•?Ci ,cA S)'Z'1111( Operator i c�, .. (�q3 -71' 1. Current liquid levels in incJ�� as (1 (� 1 astfred from the current liquid level in the lagoon to the lowest point on the top of the dam for lagoons without spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Structure 1• .Structure 2 Structure 3 Structure 4 Structure 5 Structure Lagoon Name/identifier (ID): 1 Spillway (Yes or No): Level- (inches): 2. Check aG8 applicable items Liquid level is within the designed .structural freeboard elevations. of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. V Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is,attached. Agronomic balance is within acceptable range, Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste to pumped and hauled is reflected in section III tables. Included within this plan is a list of the proposed sites with related facility number(s), number acres and receiving crop information. Contact and secure approval from the Division of Water Quality prior to transfer of waste to a site not covered in the facility's certified animal waste many jernent piano Operation will be partially or fully depopulated. - attach a complete schedule with corresponding animal units and dates for depopulation - if animals are to be moved to'another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3. Earliest possible date to begin land applidation of wash: _ aJ12)/ E hereby certify that 1 have reviewed the unforrmstoon D6sted above and ondlioieo7 within the attached flan of Action, and to the best of nay knowlledge and ability, the information is accurate and correct. G11rn R • • $oy lim Facility Ownerr/Glanager (print) Phone: if „!/ `' _ Date: Facility Owner/Manager (signature) I 6,-/ 2 - 20"1 -2- a - i ce -4 • Pak Cover Page 2/21100 II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: 2. Structure ID: 3. Structure ID: 4. Structure ID: 5. Structure ID: 6. Structure ID: Storms 1 2 3 4 n. lines +2+3+4+5+6= line m = 1066.2 Ib PAN line m = Ib PAN line m = Ib PAN line m = Ib PAN line m = Ib PAN Tine m = Ib PAN 1066.2 Ib PAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN ANNOT BE APPLIED DURING THIS 30 DAY PERIOD. o. tract # p. field # q. crop r. acres s. remaining IRR-2 PAN balance (Ib/acre) t. TOTAL PAN BALANCE FOR FIELD (tbs.) column r x s u. application window' 903 K-P wheat 30.00 75.00 2250.0 9/1-4/30 ** guestimate on remaining PAN balance but very little pumping since last poa State current crop ending application date or next crop application beginning date for available receiving crops during 30 day draw down period. v. Total PAN available for all fields (sum of column t) = IV. FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied (line n from section 11) = x. Crop's remaining PAN balance (line v from section III) = y. Overall PAN balance (w - x) = 2250.0 Ib. PAN 1066.2 Ib. PAN 2250.0 Ib. PAN -1184 lb. PAN Line y must show as a deficit. If Tine y does not show as a deficit, list course of action here including pump and haul, depopulation, herd reducton, etc. For pump & haul and herd reduction options, recalculate new PAN based on new information. If newfields are to be included as an option for lowering lagoon level, add thesefields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the receiving facility. NARRATIVE: pumping will begin as soon as field conidtions allow. PoA (30 Day) 2/21/00 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): Storms 1 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker b. designed 25 yr./24 hr. storm & structural freeboard c. line b - line a (inches in red zone) = d. top of dike surface area according to design (area at below structural freeboard elevation) e. line c/12 x line d x 7.48 gallons/ft3 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design g. volume of waste produced according to structural design h. current herd # 4896 certified herd # 18.0 19.0 inches inches 1.0 inches 127596 ft2 79535 gallons 180 161410 4896 actual waste produced = current herd # x line g = certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated m. ((lines e + k)/1000) x line 1 = 11/23/20 REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) days ft3 161410 ft3 0 77000 ft3 ft3 297218 gallons 2.83 Ibs/1000 gal. 1066.2 lbs. PAN PoA (30 Day) 2/21/00